RG-MH-83807 · RERA P50500017744 · Last updated on MahaRERA portal: 8 Oct 2025

Source: official MahaRERA filing

Red flags

  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
25 of 101Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

RAJATBHOOMI - 3 is a Plotted project by TIRUPATI DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500017744 on 11 Sep 2018. The registration is recorded completed; possession was promised by 31 Dec 2019. 76 of the 101 units on this registration are recorded sold or booked.

At a glance

Project

  • NameRAJATBHOOMI - 3
  • TypePlotted
  • Location
    • MOUZA DONGARGAON
    • NEAR JAMTHA STADIUM
    • Dongargaon (535897)
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • RERA no.P50500017744
  • ReraGenie IDRG-MH-83807

Builder

  • NameTIRUPATI DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAEFT2905K1Z2
  • PartnersPRASHANT MANOHARRAO BONGIRWAR, RAHUL ARUNRAO UPGANLAWAR
  • Other registrations80 more →
  • Completed56 of 81
  • No longer live6 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects86 →

Key dates

this monthRegisteredSep 2018PromisedDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Sep 2018
  • Promised completion31 Dec 2019
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed119 files

Current status

75%76 of 101 units booked

Figures as on 8 Oct 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 8 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area14,241 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Sep 2024

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIDYA KUNJ KOTWAL NAGAR NAGPUR

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
TIRUPATI DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500003758Dec 2019 → Dec 2020

Reason as filed by the promoterDUE TO HEAVY RAINS DEVELOPMENT WORK IS SLOW AS COMPARED

EXT50500011452Dec 2019 → Mar 2027

Reason as filed by the promoterDue to the Corona pandemic the work on the site was stopped for about two years. Now we have completed about 67% of work on site. We estimate that we would be able to finish the remaining work by the end of March 2027. Hence we humbly request you to give us extension till March 2027 and oblige.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Apr 2025

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 , 1-3 2024 Rajatbhoomi 3.pdf8 Oct 2025
Form 2File: Form 2 , 1-3 2024 Rajatbhoomi 3.pdf8 Oct 2025
Form 3File: Form 3 , 1-3 2024 Rajatbhoomi 3.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 1-3 2024 Rajatbhoomi 3.pdf8 Oct 2025
Form 1File: Form 1 , 4-6 2024 Rajatbhoomi 3.pdf8 Oct 2025
Form 2File: Form 2 , 4-6 2024 Rajatbhoomi 3.pdf8 Oct 2025
Form 3File: Form 3 , 4-6 2024 Rajatbhoomi 3.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 4-6 2024 Rajatbhoomi 3.pdf8 Oct 2025
Form 1File: Form 1 , 10-12 2024 Rajatbhoomi 3.pdf8 Oct 2025
Form 2File: Form 2 , 10-12 2024 Rajatbhoomi 3.pdf8 Oct 2025
Form 3File: Form 3 , 10-12 2024 Rajatbhoomi 3.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 10-12 2024 Rajatbhoomi 3.pdf8 Oct 2025
Form 1File: Form 1 , 1-3 2025 Rajatbhoomi 3.pdf8 Oct 2025
Form 2File: Form 2 , 1-3 2025 Rajatbhoomi 3.pdf8 Oct 2025
Form 3File: Form 3 , 1-3 2025 Rajatbhoomi 3.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 1-3 2025 Rajatbhoomi 3.pdf8 Oct 2025
Form 1File: Form 1 , 4-6 2025 Rajatbhoomi 3.pdf8 Oct 2025
Form 2File: Form 2 , 4-6 2025 Rajatbhoomi 3.pdf8 Oct 2025
Form 3File: Form 3 , 4-6 2025 Rajatbhoomi 3.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 4-6 2025 Rajatbhoomi 3.pdf8 Oct 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf28 Jul 2025
Certificates of CA (Form 3)File: FORM 3 Apr-jun_compressed (1).pdf28 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf28 Jul 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD RAJATBHOOMI 3.pdf28 Jul 2025
Certificates of CA (Form 3)File: FROM 3 RAJATBHOOMI 3_compressed.pdf23 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc_form 4.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 RB 3.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: DSBI RB 3_.pdf17 Apr 2025
Certificates of CA (Form 3)File: FORM 3_compressed.pdf22 Mar 2025
Disclosure of sold/ booked inventoryFile: DSBI 17-1-25.pdf22 Mar 2025
Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE RB 3 APRIL TO JUNE 2022_compressed.pdf18 Mar 2025
Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE RB 3 JULY TO SEPT 2022_compressed.pdf18 Mar 2025
Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE RB 3 OCT TO DEC 2022_compressed.pdf18 Mar 2025
Certificates of CA (Form 3)File: FROM 3 CA CERTIFICATE RB 3 JAN TO MARCH 2023_compressed.pdf18 Mar 2025
Certificates of CA (Form 3)File: FORM 3_compressed.pdf27 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf13 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 ARCHITECT'S CERTIFICATE RAJATBHOOMI-3.pdf13 Jan 2025
Certificates of CA (Form 3)File: 7 FORM-3 Jul-Sept 24_compressed.pdf13 Jan 2025
Certificates of CA (Form 3)File: 6 FORM-3 Apr-jun 24_compressed.pdf13 Jan 2025
Certificates of CA (Form 3)File: 5 FORM-3 RB 3 Jan-Mar 24_compressed.pdf13 Jan 2025
Certificates of CA (Form 3)File: 4 Form 3 RB 3 1-10-23 to 30-12-23.pdf13 Jan 2025
Certificates of CA (Form 3)File: 3 FORM-3 01-06-23 TO 30-09-23_compressed.pdf13 Jan 2025
Certificates of CA (Form 3)File: FORM-3 RB 3 1-4-23 to 30-6-23_compressed.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 RB 3.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 RB 3.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Apr-Sep 24.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 July-Sep 2024.pdf8 Nov 2024
Disclosure of sold/ booked inventoryFile: DSBI 30-6-24.pdf8 Nov 2024
Disclosure of sold/ booked inventoryFile: DSBI 30-9-24.pdf8 Nov 2024
Certificates of CA (Form 3)File: Form 3 July-Sep 2024_compressed.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 July-Sep 2024.pdf18 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 July - Sep 2024.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 30-6-23.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOMR-2 Jul-sept_30-09-2023.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-12-23.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 FORM-1 30-06-2022.pdf10 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 FORM-1 30-09-2022.pdf10 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 FORM-1 30-12-2022.pdf10 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 FORM-1 30-03-2023.pdf10 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 FORM-1 30-06-2023.pdf10 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 FORM-1 30-09-2023.pdf10 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 RB-3.pdf10 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 1_30-06-2022.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 2_30-09-2022.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 3_30-12-2022.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 4_30-03-2023.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: DSBI-1-30-06-22.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: DSBI-2-30-09-2022.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: DSBI-3-30-12-2022.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: DSBI-4-30-3-23.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: DSBI-5-30-06-2023.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: DSBI-6-30-09-2023.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD RAJATBHOOMI-3.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: DSBI.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf6 May 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationStatusPromisedDelivered
SILVER PARK 1SHANKARPURCompletedAug 2019Late, Nov 2021
IMPERIALKHADKACompletedMay 2013Late, Nov 2013
IMPERIALMOUZA KHADKA KH NO 169CompletedMay 2013Late, Nov 2013

How this compares with Nagpur

75%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAJATBHOOMI - 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR JAMTHA STADIUM2,800+ in Nagpur

Builder: TIRUPATI DEVELOPERS

TIRUPATI DEVELOPERS has 81 registrations on MahaRERA, including SUVARNABHOOMI and DHANBHOOMI 1. Its filings disclose 86 earlier MahaRERA projects: declares 55 of 67 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if RAJATBHOOMI - 3 is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAJATBHOOMI - 3?

The registered promoter entity is TIRUPATI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAEFT2905K1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAJATBHOOMI - 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAJATBHOOMI - 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in RAJATBHOOMI - 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAJATBHOOMI - 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAJATBHOOMI - 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.