Home / Browse projects / Nagpur, Maharashtra / DHANBHOOMI 1

Completed No litigation declared Plotted project

DHANBHOOMI 1

By TIRUPATI DEVELOPERS

RG-MH-00390 · RERA P50500008320 · Last updated on MahaRERA portal: 24 Dec 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 66 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
26 of 185Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 220 documents Report an error

DHANBHOOMI 1 is a Plotted project by TIRUPATI DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500008320 on 18 Aug 2017. The registration is recorded completed; possession was promised by 30 Mar 2026. The completion date has moved by 66 months from the original filing. 159 of the 185 units on this registration are recorded sold or booked.

At a glance

Project

  • NameDHANBHOOMI 1
  • TypePlotted
  • Location
    • PANJRI
    • HINGNA TAH
    • Panjari
    • Hingna
    • Nagpur
    • 440023
  • Pincode440023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500008320
  • ReraGenie IDRG-MH-00390

Builder

  • NameTIRUPATI DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAEFT2905K1Z2
  • PartnersPRASHANT MANOHARRAO BONGIRWAR, RAHUL ARUNRAO UPGANLAWAR
  • Other registrations80 more →
  • Completed56 of 81
  • No longer live6 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects86 →

Key dates

this monthRegisteredAug 2017First promiseSep 2020Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion30 Mar 2026
  • Revised completionRevised to 30 Mar 2026 (originally 30 Sep 2020)
  • BuildingsNot stated in filing
  • Documents filed220 files

Current status

86%159 of 185 units booked
100.0%Work done, per cost certificate

Figures as on 24 Dec 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 24 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area36,565 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on9 Jun 2025

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHHATRAPATI SQUARE NAGPUR
Estimated costRs 3.69 cr
Cost incurredRs 3.69 cr
Work done100.0%
BuildingWingEstimatedIncurred
-NARs 3.69 crRs 3.69 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH MORESHWAR LAMGE
EngineerMahesh Balpande
EngineerMayur Karingwar
Chartered AccountantMJM Associates
Chartered AccountantPatal Taori
Chartered AccountantKND & Associates
Chartered AccountantSaloni Bang
Chartered AccountantSonam Thakur
PartnerRole in project
TIRUPATI DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500010908Sep 2020 → Sep 2025

Reason as filed by the promoterThis project of plot development was sanctioned by NIT (Nagpur Improvement Trust) in January 2016. A development agreement was made between us and NIT in June 2016.In 2018, NIT was superseded by NMRDA ( Nagpur Metropolitan Region Development Authority ). And hence we had to make certain changes as per the new norms of the planning authority. This caused us some delay in executing our project. This being a plot development project we are selling plots by allotting to individual buyers. All the plots are sold on the basis of installments of 36 months. Due to the corona pandemic and subsequent lo

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Dec 2025

Documents filed220

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 220 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: COMPLETION CERTIFICATE.pdf24 Dec 2025
Completion CertificateFile: mail_completion certificate.pdf24 Dec 2025
Completion CertificateFile: FORM 4 DHANBHOOMI-1.pdf24 Dec 2025
Form 2A (FY 2017-2018)File: form 2A 19 20.pdf11 Dec 2025
Form 2A (FY 2022-2023)File: form 2A 23 24.pdf11 Dec 2025
Form 2A (FY 2021-2022)File: 2023 24 DB 1.pdf11 Dec 2025
Form 2A (FY 2020-2021)File: 2020 21 DB 1.pdf11 Dec 2025
Form 2A (FY 2019-2020)File: form 2A 19 20.pdf11 Dec 2025
Form 2A (FY 2018-2019)File: form 2A 19 20.pdf11 Dec 2025
Form 5 (FY 2018-2019)File: 2018 19 form 5 DB 1.pdf6 Dec 2025
Form 5 (FY 2019-2020)File: 2019 20 DB 1.pdf6 Dec 2025
Form 5 (FY 2020-2021)File: 2020 21 DB 1.pdf6 Dec 2025
Form 5 (FY 2021-2022)File: 2021 22 DB 1.pdf6 Dec 2025
Form 5 (FY 2022-2023)File: 2022 23 DB 1.pdf6 Dec 2025
Form 5 (FY 2023-2024)File: 2023 24 DB 1.pdf6 Dec 2025
Form 5 (FY 2017-2018)File: 2017 18 DB 1.pdf6 Dec 2025
Form 2A (FY 2023-2024)File: 24 form 2A.pdf5 Dec 2025
Form 2A (FY 2024-2025)File: FORM 2A ENGINEERS'S CERTIFICATE DHANBHOOMI 1.pdf2 Dec 2025
Withdrawal Update Form 1File: FORM 1 DHANBHOOMI-1 up.pdf26 Nov 2025
Withdrawal Update Form 2File: FORM 2 DHANBHOOMI 1 up.pdf26 Nov 2025
Withdrawal Update Form 3File: FORM-3 CHARTERED ACCOUNTANTS CERTIFICATE DHANBHOOMI-1.pdf26 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5 CA CERTIFICATE DB 1 F Y 2024 2025.pdf8 Nov 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025
Form 3File: form 3.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI.pdf14 Oct 2025
Form 1File: form 1.pdf14 Oct 2025
Form 2File: form 2.pdf14 Oct 2025

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationStatusPromisedDelivered
SILVER PARK 1SHANKARPURCompletedAug 2019Late, Nov 2021
IMPERIALKHADKACompletedMay 2013Late, Nov 2013
IMPERIALMOUZA KHADKA KH NO 169CompletedMay 2013Late, Nov 2013

How this compares with Nagpur

86%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 66 months
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DHANBHOOMI 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HINGNA TAH2,800+ in Nagpur

2 kmDHANBHOOMI 1Completed 17Lapsed / revoked 9Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: TIRUPATI DEVELOPERS

TIRUPATI DEVELOPERS has 81 registrations on MahaRERA, including SUVARNABHOOMI and DHANBHOOMI 1. Its filings disclose 86 earlier MahaRERA projects: declares 55 of 67 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if DHANBHOOMI 1 is delayed beyond 30 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DHANBHOOMI 1?

The registered promoter entity is TIRUPATI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAEFT2905K1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DHANBHOOMI 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DHANBHOOMI 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DHANBHOOMI 1?

The professionals named in the filing: Architect: UMESH MORESHWAR LAMGE; Engineer: Mahesh Balpande; Engineer: Mayur Karingwar; Chartered Accountant: MJM Associates; Chartered Accountant: Patal Taori; Chartered Accountant: KND & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DHANBHOOMI 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DHANBHOOMI 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DHANBHOOMI 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.