Registered No litigation declared Plotted project

SILVER CITY - 2

By TIRUPATI DEVELOPERS

RG-MH-03598 · RERA P50500029462 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
0 of 184Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

SILVER CITY - 2 is a Plotted project by TIRUPATI DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500029462 on 29 May 2021. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 184 of the 184 units on this registration are recorded sold or booked.

At a glance

Project

  • NameSILVER CITY - 2
  • TypePlotted
  • Location
    • NEAR SANDESH CITY
    • NAGPUR
    • Kothewada
    • Hingna
    • 440023
  • Pincode440023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500029462
  • ReraGenie IDRG-MH-03598

Builder

  • NameTIRUPATI DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAEFT2905K1Z2
  • PartnersPRASHANT MANOHARRAO BONGIRWAR, RAHUL ARUNRAO UPGANLAWAR
  • Other registrations80 more →
  • Completed56 of 81
  • No longer live6 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects86 →

Key dates

this monthRegisteredMay 2021First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 May 2021
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • BuildingsNot stated in filing
  • Documents filed91 files

Current status

100%184 of 184 units booked
95.0%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area21,238 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on24 Sep 2024
LandownerVillageDistrict
GOPALA FAKIRA ASHTANKARNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Metropolitian Region Development Authority
Permissible FSI38387.93
Proposed, not sanctioned38,388 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHHATRAPATI SQUARE NAGPUR
Estimated costRs 2.51 cr
Cost incurredRs 2.39 cr
Work done95.0%
BuildingWingEstimatedIncurred
-NARs 2.51 crRs 2.39 cr

Certifying professionals and partners11

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH MORESHWAR LAMGE
ArchitectUmesh Lamge
EngineerMAHESH ASHOKARO BALPANDE
EngineerMAHESH BALPANDE
EngineerMAHESH ASHOKRAO BALPANDE
EngineerMayur Karingwar
Chartered AccountantMJM Associates
Chartered AccountantPatal Taori
Chartered AccountantKND & Associates
Chartered AccountantSaloni Bang
Chartered AccountantSonam Thakur
PartnerRole in project
TIRUPATI DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27022620031Mar 2026 → Mar 2027

Reason as filed by the promoterDue to technical issues encountered on MahaCriti, the newly launched platform by MahaRERA, and delays in receiving completion certificate for the development work carried out on the aforesaid project, from the Planning Authority we were unable to complete the project in extended time.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 ARCHITECTS CERTIFICATE SILVER CITY 2.pdf20 Jul 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE SILVER CITY 2.pdf20 Jul 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE SILVER CITY 2 DATE 16 07 2026.pdf20 Jul 2026
Form 5 (FY 2025-2026)File: FORM 5 CA CERTIFICATE SC 2 DATE 16 06 2026.pdf12 Jun 2026
Form 2A (FY 2025-2026)File: FORM-2A SILVER CITY-2.pdf6 Jun 2026
Withdrawal Update Form 1File: FORM 1 SILVER CITY 2.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2 SILVER CITY 2.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE SILVER CITY 2 DATE 14 04 2026.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE SILVER CITY 2.pdf17 Feb 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE SILVER CITY 2.pdf17 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE SILVER CITY 2 DATE 10 01 2026.pdf17 Feb 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECTS CERTIFICATE SILVER CITY-2.pdf18 Dec 2025
Withdrawal Update Form 2File: FORM 2 ENGINEERS CRETIFICATE SILVER CITY-2.pdf18 Dec 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE SILVER CITY 2 DATE 10 12 2025.pdf18 Dec 2025
Form 2A (FY 2024-2025)File: FORM 2 A SILVER CITY 2.pdf8 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5 CA CERTIFICATE SC 2 F Y 2024 2025 silver city 2.pdf8 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SILVER CITY 2_compressed.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SILVER CITY 2 JANUARY TO MARCH 2025.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SCity 2.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SCity 2.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: DSBI.pdf14 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 Silver city 2.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 Silver city 2.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 July-Sep 2024_compressed.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 July-Sep 2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July-Sep 2024.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: DSBI July-Sep 2024.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE SILVER CITY 2 compressed.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: DSBI.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: DSBI.pdf18 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Silver city 2.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA CERTIFICATE SC-2 DATE 29-01-2024_compressed.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SC-2.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER'S CERTIFICATE SC-2 DATE 30-12-2023.pdf22 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SC-2 DATE 30-12-2023.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SC-2_compressed.pdf2 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 5_10_23.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A 2022.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A 2023.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SC 2 1.pdf26 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SC 2 2.pdf26 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SC 2 3.pdf26 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SC 2 4.pdf26 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SC 2 5.pdf26 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 CA CERTIFICATE SC-2 (2021-2022).pdf23 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate Organization (Prashant Bongirwar).pdf27 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate Organization (Rahul Upganlawar).pdf27 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE RB-2 2023.pdf10 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold SC-1-1-2 03-01.pdf4 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold SC-1-3-5 03-01.pdf4 Jan 2023
Details of encumbrances concerned to LegalFile: SC-2 Declaration for encumbrance to legal.pdf22 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SC-2 Quality assurance Certificate.pdf22 Aug 2022
Deviation Report with respect to Allotment letterFile: SC-2 Deviation for Allotment Letter.pdf22 Aug 2022
Deviation Report with respect to model copy of AgreementFile: SC-2 Deviation for Agreement to sale.pdf22 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE SC-2 08-22.pdf20 Aug 2022
Copy of the legal title reportFile: SC-2 search.pdf20 May 2021
Copy of the legal title reportFile: SC-2 search_3.pdf20 May 2021
Copy of the legal title reportFile: SC-2 search_4.pdf20 May 2021
Layout approvalFile: sc2 map.pdf9 Apr 2021
Layout approvalFile: sc2 map_1.pdf9 Apr 2021
Building plan approval or NA orderFile: cover letter sc2.pdf9 Apr 2021
Building plan approval or NA orderFile: cover letter sc2_3.pdf9 Apr 2021
PAN CardFile: Pan card TD.pdf9 Apr 2021
Details of encumbrancesFile: encumbrance sc2.pdf9 Apr 2021
Copy of Layout Approval (in case of layout)File: sc2 map.pdf9 Apr 2021
Copy of Layout Approval (in case of layout)File: sc2 map_1.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: cover letter sc2.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: cover letter sc2_3.pdf9 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: cover letter sc2.pdf9 Apr 2021

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationStatusPromisedDelivered
SILVER PARK 1SHANKARPURCompletedAug 2019Late, Nov 2021
IMPERIALKHADKACompletedMay 2013Late, Nov 2013
IMPERIALMOUZA KHADKA KH NO 169CompletedMay 2013Late, Nov 2013

How this compares with Nagpur

100%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SILVER CITY - 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAGPUR2,800+ in Nagpur

2 kmSILVER CITY - 2Completed 3Lapsed / revoked 1Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: TIRUPATI DEVELOPERS

TIRUPATI DEVELOPERS has 81 registrations on MahaRERA, including SUVARNABHOOMI and DHANBHOOMI 1. Its filings disclose 86 earlier MahaRERA projects: declares 55 of 67 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SILVER CITY - 2 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILVER CITY - 2?

The registered promoter entity is TIRUPATI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAEFT2905K1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILVER CITY - 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SILVER CITY - 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILVER CITY - 2?

The professionals named in the filing: Architect: UMESH MORESHWAR LAMGE; Architect: Umesh Lamge; Engineer: MAHESH ASHOKARO BALPANDE; Engineer: MAHESH BALPANDE; Engineer: MAHESH ASHOKRAO BALPANDE; Engineer: Mayur Karingwar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILVER CITY - 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILVER CITY - 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILVER CITY - 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.