RAGHAV VISTA
By RAGHAV RAJ BUILDERS & DEVELOPERS LLP
RG-MH-19356 · RERA P51800078491 · Last updated on MahaRERA portal: 7 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAGHAV VISTA is a Residential / Group Housing project by RAGHAV RAJ BUILDERS & DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078491 on 17 Dec 2024. Possession is promised by 31 Dec 2028. 53 of the 99 units on this registration are recorded sold or booked, and 5 of 10 construction stages are filed complete.
At a glance
Project
- NameRAGHAV VISTA
- TypeResidential / Group Housing
- Location
- SAHAKAR NAGAR NO 5
- SHELL COLONY
- Chembur
- Kurla
- Mumbai Suburban
- 400071
- Pincode400071
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800078491
- ReraGenie IDRG-MH-19356
Builder
- NameRAGHAV RAJ BUILDERS & DEVELOPERS LLP
- Entity typePartnership
- LLPINAAD-0888
- LLPIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersSUDHANSHU RAMAVTAR AGARWAL, SUSHMA LALIT GOLECHA
- Other registrations9 more →
- Completed2 of 10
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Dec 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed83 files
Current status
Figures as on 7 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RAGHAV VISTA | NA | 15 | 15 | 99 | 0 | 99 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 10 construction stages are filed complete. The stage furthest along is Internal walls, at 0%.
RAGHAV VISTA: 50% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 7 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed53
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SAHAKAR NAGAR SHRAVASTI CHS LTD. | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RAGHAV VISTA | NA | Rs 34.65 cr | Rs 6.38 cr |
| - | NA | Rs 3.85 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SURAJ OZA |
| Engineer | Kailash Anwala |
| Chartered Accountant | Preeti Golecha |
| Chartered Accountant | G. P. SHARMA & CO. LLP |
| Partner | Role in project |
|---|---|
| RAGHAV RAJ BUILDERS & DEVELOPERS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Nov 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jan 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1- Raghav Vista (30th June 2026).pdf | 7 Jul 2026 |
| Withdrawal Update Form 2File: Form 2-Raghav Vista (30th June 2026).pdf | 7 Jul 2026 |
| Withdrawal Update Form 3File: Form 3- Raghav Vista (30th June 2026).pdf | 7 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate March 2026.pdf | 7 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineers Certificate March 2026.pdf | 7 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate 31st March 2026.pdf | 7 Apr 2026 |
| Building plan approvalFile: Amended IOA Plan - 1_compressed.pdf | 14 Jan 2026 |
| Building plan approvalFile: Amended IOA Plan 2_compressed.pdf | 14 Jan 2026 |
| Building plan approvalFile: Amended IOA Plan 3_compressed.pdf | 14 Jan 2026 |
| Building plan approvalFile: Amended IOA Plan 4.pdf | 14 Jan 2026 |
| Building plan approvalFile: Further CC - 07 January 2026.pdf | 9 Jan 2026 |
| Building plan approvalFile: Amended IOA 02 December 2025.pdf | 9 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Architects Certificate December 2025.pdf | 7 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineers Certificate December 2025.pdf | 7 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate (31st December 2025).pdf | 7 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 RAGHAV VISTA FY 24-25.pdf | 4 Dec 2025 |
| Form 1File: Form 1 Architects Certificate December 2024.pdf | 4 Nov 2025 |
| Form 2File: Form 2 Engineers Certificate December 2024.pdf | 4 Nov 2025 |
| Form 3File: Form 3 CA Certificate December 2024.pdf | 4 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - December 2024.pdf | 4 Nov 2025 |
| Form 1File: Form 1 Architects Certificate March 2025.pdf | 4 Nov 2025 |
| Form 2File: Form 2 Engineers Certificate March 2025.pdf | 4 Nov 2025 |
| Form 3File: Form 3 CA Certificate March 2025.pdf | 4 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - March 2025.pdf | 4 Nov 2025 |
| Form 1File: Form 1 Architects Certificate June 2025.pdf | 4 Nov 2025 |
| Form 2File: Form 2 Engineers Certificate June 2025.pdf | 4 Nov 2025 |
| Form 3File: Form 3 CA Certificate June 2025.pdf | 4 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - June 2025.pdf | 4 Nov 2025 |
| Form 1File: Form 1 Architects Certificate September 2025.pdf | 4 Nov 2025 |
| Form 2File: Form 2 Engineers Certificate September 2025.pdf | 4 Nov 2025 |
| Form 3File: Form 3 CA Certificate September 2025.pdf | 4 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - September 2025.pdf | 4 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate March 2025.pdf | 7 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate March 2025.pdf | 7 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate March 2025.pdf | 7 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate March 2025.pdf | 7 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate December 2024.pdf | 7 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate December 2024.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate December 2024.pdf | 7 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate December 2024.pdf | 7 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate December 2024.pdf | 7 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate December 2024.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate December 2024.pdf | 7 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate December 2024.pdf | 7 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Finance Encuumbrances Declaration.pdf | 11 Dec 2024 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 11 Dec 2024 |
| Details of encumbrances concerned to LegalFile: Finance Encuumbrances Declaration.pdf | 11 Dec 2024 |
| Building plan approvalFile: Zero FSI IOA Plan.pdf | 7 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Zero FSI IOA Plan.pdf | 7 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: No loan- CA Declaration-Vista.pdf | 6 Dec 2024 |
| Details of encumbrances concerned to LegalFile: No loan- CA Declaration-Vista.pdf | 6 Dec 2024 |
| Other - FinanceFile: Disclosure - for Land cost- Vista.pdf | 5 Dec 2024 |
| CERSAI detailsFile: 1 CERSAI details.pdf | 2 Dec 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured-unsecured finance- Vista.pdf | 30 Nov 2024 |
| Proforma of Agreement for saleFile: F-RERA AFS - Chembur.pdf | 27 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: RRBD ICICI Bank-Raghav Vista.pdf | 27 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raghav Vista Form 3.pdf | 26 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about Sepearate Bank Account- Vista (promoter).pdf | 26 Nov 2024 |
| Other - FinanceFile: Declaration about Sepearate Bank Account- Vista.pdf | 26 Nov 2024 |
| Other - TechnicalFile: Annexure A- Declaration cum Undertaking- Ragav Vista.pdf | 22 Nov 2024 |
| Proforma of Allotment letterFile: Raghav Vista (Allotment Letter).pdf | 21 Nov 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation report (Raghav Vista).pdf | 21 Nov 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report as per AFS.pdf | 21 Nov 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: GRO- RAGHAV VISTA.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Annexure A Form 1 of Raghav Vista.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Raghav Vista Form 2.pdf | 16 Nov 2024 |
| Building plan approvalFile: Sahakar Nagar Layout.pdf | 8 Nov 2024 |
| Layout approvalFile: LAYOUT.pdf | 8 Nov 2024 |
| PAN CardFile: PAN RRBD.pdf | 8 Nov 2024 |
| Copy of the legal title reportFile: Legal Title Repot (Shravasti CHS).pdf | 8 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf | 8 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Finance Encumbrance.pdf | 8 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 8 Nov 2024 |
| Declaration in FORM BFile: Form B- Declaration cum Affidavit (Promoter).pdf | 8 Nov 2024 |
| Declaration in FORM BFile: Form B- Declaration cum Affidavit (Society).pdf | 8 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 8 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sahakar Nagar Layout.pdf | 8 Nov 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 8 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf | 8 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Finance Encumbrance.pdf | 8 Nov 2024 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| RAGHAV MARVELP51800045396 | Nehrunagar, Mumbai Suburban | - | May 2022 | Completed | Aug 2025Registered original: Aug 2024 | Aug 2025 |
| RAGHAV AMARAP51800030338 | Kurla East, Mumbai Suburban | - | Aug 2021 | Completed | Sep 2024Registered original: Jul 2023 | Sep 2024 |
| RAGHAV ONE45 | KURLA EAST | 93 | - | Completed | Feb 2023 | Feb 2023 |
| RAGHAV ONEP51800020496 | Nehru Nagar, Mumbai Suburban | - | Apr 2019 | Completed | Jun 2021 | Late, Dec 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RAGHAV VISTA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHELL COLONY6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 493 registered projects within 2 km.
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: RAGHAV RAJ BUILDERS & DEVELOPERS LLP
RAGHAV RAJ BUILDERS & DEVELOPERS LLP has 10 registrations on MahaRERA, including RAGHAV ONE and RAGHAV ONE45. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if RAGHAV VISTA is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAGHAV VISTA?
The registered promoter entity is RAGHAV RAJ BUILDERS & DEVELOPERS LLP, a partnership as per the filing. Its LLPIN AAD-0888 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAGHAV VISTA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RAGHAV VISTA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RAGHAV VISTA?
The professionals named in the filing: Architect: SURAJ OZA; Engineer: Kailash Anwala; Chartered Accountant: Preeti Golecha; Chartered Accountant: G. P. SHARMA & CO. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RAGHAV VISTA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback