ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / RAGHAV AMARA

Registration lapsed No litigation declared Residential / Group Housing project

RAGHAV AMARA

By RAGHAV RAJ BUILDERS & DEVELOPERS LLP

RG-MH-30278 · RERA P51800030338 · Last updated on MahaRERA portal: 6 Oct 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 25 months past the filed date
  • Completion date moved by 14 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2024Possession promised25 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

RAGHAV AMARA is a Residential / Group Housing project by RAGHAV RAJ BUILDERS & DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030338 on 15 Aug 2021. Possession was promised by 20 Sep 2024 and is now 25 months past that date. The completion date has moved by 14 months from the original filing.

At a glance

Project

  • NameRAGHAV AMARA
  • TypeResidential / Group Housing
  • Location
    • Nehru Nagar
    • Kurla East
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800030338
  • ReraGenie IDRG-MH-30278

Builder

  • NameRAGHAV RAJ BUILDERS & DEVELOPERS LLP
  • Entity typePartnership
  • LLPINAAD-0888
  • LLPIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSUDHANSHU RAMAVTAR AGARWAL, SUSHMA LALIT GOLECHA
  • Other registrations9 more →
  • Completed2 of 10
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

25 months past promisethis monthRegisteredAug 2021First promiseJul 2023Revised toSep 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Aug 2021
  • Promised completion20 Sep 2024
  • Revised completionRevised to 20 Sep 2024 (originally 31 Jul 2023)
  • Buildings1 building record
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAGHAV AMARANA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

RAGHAV AMARA: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered34

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area568 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
RAGHAV RAJ BUILDERS AND DEVELOPERS LLPAndheriMumbai Suburban

Approvals and building plan

Permissible FSI5675.0
Proposed, not sanctioned3,652 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVALAYA APARTMENT, CHANDAVARKAR ROAD, BORIVALI WEST, MUMBAI 400 092

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCREATIVE CONSULTANCY
EngineerKAILASH ANWALA
Chartered AccountantAGARWAL SANGNERIA AND CO
PartnerRole in project
RAGHAV RAJ BUILDERS & DEVELOPERS LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013100Jul 2023 → Jul 2024

Reason as filed by the promoterSupply chain issue, material supply delays, unforeseen situations in construction, Local festivals - no construction possible during navratri & ganesh festivals.

EXT51800024409Jul 2023 → Sep 2024

Reason as filed by the promoterWe have received part OC for the project and have handed over possession for the units to the Allottees. Few compliances are in process regarding execution of Supplementary Lease Deed. However, due to on going strike in Collector office, the process is marginally delayed. The construction of the Project is entirely completed.

Litigation declared1

CaseCourtStatus
13838/2021HIGH COURT of BOMBAYDisposed of as withdrawn

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Apr 2025

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Architect Certificate (June 2022).pdf6 Oct 2025
Form 2File: Form 2 Engineers Certificate (June 2022).pdf6 Oct 2025
Form 3File: Form 3 CA Certificate (June 2022).pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Raghav Amara.pdf6 Oct 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC Plan.pdf3 Apr 2025
Other - TechnicalFile: Annexure E form - 4 signed.pdf24 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Annexure E form 4 (1).pdf23 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Architect certificate for project completion 1.pdf7 Nov 2024
Declaration in FORM BFile: Form B- Amara.pdf4 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC- Raghav Amara.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate June 2024.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold Inventory.pdf24 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate June 2024.pdf7 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate June 2024.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate June 2024.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate June 2024.pdf6 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: GRO- Declaration Amara.pdf27 Jun 2024
Details of encumbrancesFile: No Finance Encumbrance RAGHAV Amara.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate March 2024.pdf9 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate March 2024.pdf9 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QA Certificate March 2024.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate March 2024.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate December 2023.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate December 2023.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 2023.pdf6 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineer QA Certificate Dec 2023.pdf6 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA Certificate March 2023.pdf30 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineers QA Certificate June 2023.pdf8 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Annexure A June 2023.pdf7 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate June 2023.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Amara C A Certificate June 2023.pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate March 2023.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate March 2023.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Quality Certificate March 2023.pdf7 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A certificate March 2023.pdf7 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC upto19th Floor (Full CC).pdf8 Feb 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (1).pdf30 Jan 2023
Copy of the legal title reportFile: Title Report - Supplement.pdf24 Jan 2023
CERSAI detailsFile: CERSAI Search Report RAGHAV AMARA.pdf24 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Engineer Certificate Dec 2022.pdf7 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certficate Dec 2022.pdf7 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Engineers Certificate QA Dec 2022.pdf7 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Ceertificate Dec 2022.pdf7 Jan 2023
Details of encumbrancesFile: Encumbrances Certificate.pdf4 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 CA Certificate March 2022.pdf9 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 Engineers Certificate (Sept 2022).pdf11 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate (Sept 2022).pdf8 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate (Sept 2022).pdf8 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Engineer's QA Certi (Sept 2022).pdf8 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate (Sept 2022).pdf8 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: CC upto 6th Floor.pdf18 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate (June 2022).pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate (June 2022).pdf7 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Engineer's QA Certi (June 2022).pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate (June 2022).pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate (June 2022).pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Raghav Amara.pdf2 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate (March 2022).pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate (March 2022).pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Engineer's QA Certi (March 2022).pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate (March 2022).pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RAGHAV AMARA Form 3.pdf7 Jan 2022
Copy of the legal title reportFile: Legal Title Report.pdf5 Aug 2021
Building plan approvalFile: Building Plan approved.pdf4 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Plan approved.pdf4 Aug 2021
Layout approvalFile: Approved Layout.pdf2 Aug 2021
Copy of Layout Approval (in case of layout)File: Approved Layout.pdf2 Aug 2021
Declaration in FORM BFile: Form B Declaration.pdf2 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate.pdf28 Jul 2021
Building plan approvalFile: IOA of Raghav Amara.pdf26 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: IOA of Raghav Amara.pdf26 Jul 2021
Proforma of Allotment letterFile: Proforma of Sale Agreement.pdf20 Jul 2021
Details of encumbrancesFile: Details of Encumbrances.pdf16 Jul 2021
Declaration about Commencement CertificateFile: Decleration about CC.pdf16 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: CC Zero FSI.pdf14 Jul 2021
PAN CardFile: PAN.pdf13 Jul 2021

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RAGHAV MARVELP51800045396Nehrunagar, Mumbai Suburban-May 2022CompletedAug 2025Registered original: Aug 2024Aug 2025
RAGHAV ONE45KURLA EAST93-CompletedFeb 2023Feb 2023
RAGHAV ONEP51800020496Nehru Nagar, Mumbai Suburban-Apr 2019CompletedJun 2021Late, Dec 2021

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 14 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAGHAV AMARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla East6,700+ in Mumbai Suburban

2 kmRAGHAV AMARACompleted 44Lapsed / revoked 21Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: RAGHAV RAJ BUILDERS & DEVELOPERS LLP

RAGHAV RAJ BUILDERS & DEVELOPERS LLP has 10 registrations on MahaRERA, including RAGHAV ONE and RAGHAV ONE45. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that RAGHAV AMARA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RAGHAV AMARA is delayed beyond 20 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAGHAV AMARA?

The registered promoter entity is RAGHAV RAJ BUILDERS & DEVELOPERS LLP, a partnership as per the filing. Its LLPIN AAD-0888 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAGHAV AMARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAGHAV AMARA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAGHAV AMARA?

The professionals named in the filing: Architect: CREATIVE CONSULTANCY; Engineer: KAILASH ANWALA; Chartered Accountant: AGARWAL SANGNERIA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAGHAV AMARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAGHAV AMARA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAGHAV AMARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.