Home / Browse projects / Aurangabad, Maharashtra / Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, Aurang
Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, Aurang
By AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)
RG-MH-39789 · RERA P51500054769 · Last updated on MahaRERA portal: 28 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, Aurang is a Residential / Group Housing project by AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA) in Aurangabad, Maharashtra, registered with MahaRERA as P51500054769 on 12 Feb 2024. Possession is promised by 31 Dec 2029.
At a glance
Project
- NameProposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, Aurang
- TypeResidential / Group Housing
- Location
- JALNA ROAD
- Plot No. 03
- Gut No. 736/Part
- Chikalthana
- Aurangabad
- Aurangabad (M Corp.)
- Aurangabad
- 431001
- Pincode431001
- RERA no.P51500054769
- ReraGenie IDRG-MH-39789
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Feb 2024
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings3 building records
- Documents filed52 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| L-1- TYPE | NA | 6 | 0 | 0 | 0 | 0 |
| L-2-TYPE | NA | 6 | 0 | 0 | 0 | 0 |
| L-3-TYPE | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 55%.
L-1- TYPE45%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
L-2-TYPE42%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 55% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
L-3-TYPE32%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed66
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| L-1- TYPE | 26 | 26 |
| L-2-TYPE | 26 | 26 |
| L-3-TYPE | 14 | 14 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHRUTI DESHPANDE |
| Engineer | J V STRUCTUREAL ENGINEER & CONSULTANT |
| Chartered Accountant | CHIEF ACCOUNT OFFICER MHADA |
| Partner | Role in project |
|---|---|
| CHHATRAPATI SAMBHAJINAGAR HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA) | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed52
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architect Certificate Form 1 60 LIG.pdf | 28 Apr 2026 |
| Form 2File: form 2 chikalthana 60lig_0001.pdf | 28 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 60 LIG Chikalthana sold unsold.pdf | 28 Apr 2026 |
| Form 3File: Form - 3 60 LIG Chikalthana_compressed (4).pdf | 28 Apr 2026 |
| Self-declaration of Quarterly ProgressFile: qpr declare_0001-3.pdf | 28 Apr 2026 |
| Form 1File: Architect Certificate Form 1 60 LIG.pdf | 12 Feb 2026 |
| Form 2File: form 2 chikalthana 60lig_0001.pdf | 12 Feb 2026 |
| Form 3File: Form - 3 60 LIG Chikalthana_compressed (3).pdf | 12 Feb 2026 |
| Self-declaration of Quarterly ProgressFile: 60LIG declaration.pdf | 12 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: 60 LIG Chikalthana sold unsold.pdf | 12 Feb 2026 |
| Form 1File: Architect Certificate Form 1 60 LIG.pdf | 16 Jan 2026 |
| Form 2File: form 2 chikalthana 60lig_0001.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 60 LIG Chikalthana sold unsold.pdf | 16 Jan 2026 |
| Form 3File: Form - 3 60 LIG Chikalthana_compressed (1).pdf | 16 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: 60.pdf | 16 Jan 2026 |
| Form 1File: Architect Certificate & Form 1 60 LIG.pdf | 18 Jul 2025 |
| Form 2File: form 2 chikalthana 60lig_0001.pdf | 18 Jul 2025 |
| Form 3File: Form - 3 60 LIG Chikalthana_compressed.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 60 LIG Chikalthana.pdf | 18 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: QPR 60 Chikalthana.pdf | 18 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 8 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 8 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NEW C A -MHADA-CHIKALTHANA.pdf | 4 Feb 2024 |
| Building plan approvalFile: PLAN 1.pdf | 22 Dec 2023 |
| Building plan approvalFile: PLAN 2.pdf | 22 Dec 2023 |
| Building plan approvalFile: PLAN 3.pdf | 22 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: NON ENCUMBERANCE CERTIFICATE.pdf | 22 Dec 2023 |
| Details of encumbrances concerned to LegalFile: NON ENCUMBERANCE CERTIFICATE.pdf | 22 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf | 22 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf | 22 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 3.pdf | 22 Dec 2023 |
| Declaration in FORM BFile: FORM B DECLARATION.pdf | 22 Dec 2023 |
| CERSAI detailsFile: CERSAI.pdf | 22 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate projects-chikalthana.pdf | 22 Dec 2023 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT- MHADA.pdf | 29 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- MHADA.pdf | 29 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 A.pdf | 29 Nov 2023 |
| Proforma of Allotment letterFile: 3 Proforma of Allotment letter.pdf | 29 Nov 2023 |
| Proforma of Agreement for saleFile: 3 Proforma of Allotment letter.pdf | 29 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NOT APPLICABLE.pdf | 22 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation in the Allotment Letter.pdf | 22 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation in the Allotment Letter and Agreement.pdf | 22 Nov 2023 |
| Layout approvalFile: LAYOUTchikalthana LIG 60.pdf | 21 Nov 2023 |
| Building plan approvalFile: BUILDING Permission chikalthana LIG 60.pdf | 21 Nov 2023 |
| PAN CardFile: 1 PAN Card.pdf | 21 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: LAND CLEARANCE CERTIFICATE- mhada.pdf | 21 Nov 2023 |
| Details of encumbrances concerned to LegalFile: LAND CLEARANCE CERTIFICATE- mhada.pdf | 21 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUTchikalthana LIG 60.pdf | 21 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING Permission chikalthana LIG 60.pdf | 21 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE- CHIKALTHANA.pdf | 21 Nov 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE- mhada.pdf | 21 Nov 2023 |
| CERSAI detailsFile: UNDERTAKING NO CERSAI REPORT-mhada.pdf | 21 Nov 2023 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| CONSTRUCTION OF 390 T-S LIG AND 16 SHOPS AT GUT NO 708-PART, CHIKALTHANA AURANGABADP51500034364 | OPPSITE AURANGABAD AIRPORT CHIKALTHANA, Aurangabad | 406 | Apr 2022 | Ongoing | Dec 2027 | Not due yet |
| CONSTRUCTION OF 390 T-S LIG AND 16 SHOPS AT GUT NO 708-PART, CHIKALTHANA AURANGABADP51500034364 | OPPSITE AURANGABAD AIRPORT CHIKALTHANA, Aurangabad | 390 | Apr 2022 | Ongoing | Dec 2027 | Not due yet |
| CONSTRUCTION OF 368 EWS T/S UNDER PMAY AND 168 MIG ON S.NO.68 AT PADHEGOAN ,DIST-AURANGABADP51500026531 | AURANGABAD, Aurangabad | 536 | Sep 2020 | Completed | Mar 2026 | Jul 2024 |
| Construction of 244 EWS and 70 Shops under PMAY Housing Scheme on land S. No. 17 at Ambejogai, BeedP52300049313 | Ambejogai, Beed | 244 | Feb 2023 | Ongoing | Dec 2025 | Not delivered |
| Construction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist HingoliP51200027577 | hingoli, Hingoli | 180 | Dec 2020 | Ongoing | Mar 2025 | Not delivered |
| 736 EWS TS AND 256 MIG TS AT PLOT NO R-1 ADDITIONAL MIDC LATURP52400017486 | ADD. MIDC, Latur | - | Aug 2018 | Ongoing | Dec 2022 | Not delivered |
| 364 EWS T/S UNDER PMAY AT JALNA DIS JALNAP51400012018 | jalna, Jalna | 80 | Sep 2017 | Completed | Jul 2019 | Late, Sep 2020 |
| CONSTRUCTION OF 240 EWS T/S ON GUT NO 09 NAKSATRAWADI AURANGABADP51500013212 | NAKSHATRAWADI, Aurangabad | 240 | Sep 2017 | Completed | Apr 2019 | Late, Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations, which the RERA portal never shows together
- All 52 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Proposed construction of 60 L.I.G. T/s Schem on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Plot No. 03, Gut No. 736/Part, Chikalthana, Aurangabad1,400+ in Aurangabad
Capital Trade Centre
KRK Landmark LLP
AQ TOWN
AQ INFRASTRUCTURE PRIVATE LIMITED
KALYANI SAI VISHWA
RAJASHREE UDYOG
AMRUT SAI PLAZA PH 2
Shree Amrut Sai Developer Pvt.Ltd
PRASSANA HIGH CLASS CITY PHASE - I
SHRI KRISHNA NAGAR SAHAKARI GRAH NIRMAN SA
SHRIRAM RESIDENCY
UNIQUE BUILDCON
See every Aurangabad project, with the district possession charts
Builder: AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)
AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA) has 9 registrations on MahaRERA, including 364 EWS T/S UNDER PMAY AT JALNA DIS JALNA and CONSTRUCTION OF 240 EWS T/S ON GUT NO 09 NAKSATRAWADI AURANGABAD. Its filings disclose 8 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, Aurang is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, Aurang?
The registered promoter entity is AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA), a public authority as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, Aurang?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, Aurang?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, Aurang?
The professionals named in the filing: Architect: SHRUTI DESHPANDE; Engineer: J V STRUCTUREAL ENGINEER & CONSULTANT; Chartered Accountant: CHIEF ACCOUNT OFFICER MHADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, Aurang?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback