Construction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist Hingoli

By AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)

RG-MH-88221 · RERA P51200027577 · Last updated on MahaRERA portal: 19 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Hingoli registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
33 of 99Construction stages doneacross 9 buildings; furthest along: Slabs of Super Structure, 99%
180 of 180Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

Construction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist Hingoli is a Residential / Group Housing project by AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA) in Hingoli, Maharashtra, registered with MahaRERA as P51200027577 on 16 Dec 2020. Possession was promised by 10 Mar 2026 and is now 7 months past that date. The completion date has moved by 12 months from the original filing. 0 of the 180 units on this registration are recorded sold or booked, and 33 of 99 construction stages are filed complete.

At a glance

Project

  • NameConstruction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist Hingoli
  • TypeResidential / Group Housing
  • Location
    • sengoan narsi road
    • hingoli
    • 431513
  • Pincode431513
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51200027577
  • ReraGenie IDRG-MH-88221

Builder

  • NameAURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)
  • Entity typePublic Authority
  • Junior EngineerHameed Rafai
  • Other registrations8 more →
  • Completed2 of 9
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

7 months past promisethis monthRegisteredDec 2020First promiseMar 2025Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 Dec 2020
  • Promised completion10 Mar 2026
  • Revised completionRevised to 10 Mar 2026 (originally 10 Mar 2025)
  • Buildings9 building records
  • Documents filed49 files

Current status

0%0 of 180 units booked

Figures as on 19 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
L1NA3312012
L2NA3312012
L3NA3312012
L4NA3312012
E 1NA3336036
E2NA3324024
E3NA3324024
E4NA3324024
E5NA3324024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Slabs of Super Structure, at 99%.

L162%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure99%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
L252%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
L354%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
L464%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E 133%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E255%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E349%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E442%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E546%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Open Space9
BuildingOpen SpaceTotal
L111
L211
L311
L411
E 111
E211
E311
E411
E511

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 May 2026

Approvals and building plan

Sanctioning authorityMaharashtra Housing Area & Development Authority
Permissible FSI7458.57
Proposed, not sanctioned7,459 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKRANTI CHOWK AURANGABAD

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDATTATRAYA PARSHURAM
EngineerSUDHAKAR BAHEGAVANKAR
EngineerAnkur DIwedi
Chartered AccountantVAIJANATH PHAD
Chartered AccountantCHEIF ACCOUNT OFFICER
Chartered AccountantAnjali Sangvikar
PartnerRole in project
CHHATRAPATI SAMBHAJINAGAR HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51200027107Mar 2025 → Mar 2026

Reason as filed by the promoterDue to less demand progress gets slow

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1_0001 (1).pdf19 May 2026
Form 2File: form2_0001.pdf19 May 2026
Form 3File: form 3_0001.pdf19 May 2026
Disclosure of Sold and Booked InventoryFile: disclouser of sold unsold_0001 (1).pdf19 May 2026
Self-declaration of Quarterly ProgressFile: declaration of QPR_0001 (1).pdf19 May 2026
Form 2A (FY 2020-2021)File: 2a 2020-21_0001 (1).pdf19 May 2026
Form 2A (FY 2021-2022)File: 2a 2021-22_0001 (1).pdf19 May 2026
Form 2A (FY 2022-2023)File: 2a 2022-23_0001 (1).pdf19 May 2026
Form 2A (FY 2023-2024)File: 2 a 2023-24_0001 (1).pdf19 May 2026
Form 2A (FY 2024-2025)File: 2a 2024-25_0001 (1).pdf19 May 2026
Form 2A (FY 2025-2026)File: 2a 2025-26_0001 (1).pdf19 May 2026
Form 2File: Form - 2.pdf12 Feb 2026
Disclosure of Sold and Booked InventoryFile: 132 EWS 48 LIG Hingoli.pdf12 Feb 2026
Self-declaration of Quarterly ProgressFile: 132 ews declaration.pdf12 Feb 2026
Form 1File: Form-1_compressed (1).pdf12 Feb 2026
Form 3File: Form - 3 132 Hingoli_compressed (2).pdf12 Feb 2026
Form 1File: Form 1 132 ews.pdf16 Jan 2026
Form 2File: Form - 2.pdf16 Jan 2026
Form 3File: Form - 3 132 Hingoli_compressed (1).pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: 132 EWS 48 LIG Hingoli.pdf16 Jan 2026
Self-declaration of Quarterly ProgressFile: 132.pdf16 Jan 2026
Form 1File: Form-1_compressed.pdf18 Jul 2025
Form 2File: Form - 2.pdf18 Jul 2025
Form 3File: Form - 3 132 Hingoli_compressed.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: 132 EWS & 48 LIG Hingoli.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: QPR 132 EWS Hingili.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (1).pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (1).pdf28 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: P51200027577.pdf20 May 2024
Details of encumbrances concerned to FinanceFile: RERA.pdf7 Dec 2023
Details of encumbrances concerned to LegalFile: RERA.pdf7 Dec 2023
Declaration about Commencement CertificateFile: RERA.pdf7 Dec 2023
CERSAI detailsFile: RERA.pdf7 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA.pdf7 Dec 2023
Proforma of Agreement for saleFile: RERA.pdf7 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA.pdf7 Dec 2023
Deviation Report with respect to Allotment letterFile: RERA.pdf7 Dec 2023
Deviation Report with respect to model copy of AgreementFile: RERA.pdf7 Dec 2023
Layout approvalFile: Lay Out approval hingoli.pdf7 Dec 2020
Building plan approvalFile: PLAN APPROVAL1.pdf7 Dec 2020
PAN CardFile: PNA.pdf7 Dec 2020
Copy of the legal title reportFile: legal title.pdf7 Dec 2020
Details of encumbrancesFile: Non Encumbrance Certificate.PDF7 Dec 2020
Copy of Layout Approval (in case of layout)File: Lay Out approval hingoli.pdf7 Dec 2020
Building Plan Approval / NA Order for plotted developmentFile: PLAN APPROVAL1.pdf7 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: Lay Out approval hingoli.pdf7 Dec 2020
Declaration in FORM BFile: Form B_opt.pdf7 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form C.pdf7 Dec 2020
Proforma of Allotment letterFile: ALLOTMENT LETTER.PDF7 Dec 2020

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late2 not delivered by the promised date3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, AurangP51500054769Plot No. 03, Gut No. 736/Part, Chikalthana, Aurangabad, Aurangabad60Feb 2024OngoingDec 2029Not due yet
CONSTRUCTION OF 390 T-S LIG AND 16 SHOPS AT GUT NO 708-PART, CHIKALTHANA AURANGABADP51500034364OPPSITE AURANGABAD AIRPORT CHIKALTHANA, Aurangabad406Apr 2022OngoingDec 2027Not due yet
CONSTRUCTION OF 390 T-S LIG AND 16 SHOPS AT GUT NO 708-PART, CHIKALTHANA AURANGABADP51500034364OPPSITE AURANGABAD AIRPORT CHIKALTHANA, Aurangabad390Apr 2022OngoingDec 2027Not due yet
CONSTRUCTION OF 368 EWS T/S UNDER PMAY AND 168 MIG ON S.NO.68 AT PADHEGOAN ,DIST-AURANGABADP51500026531AURANGABAD, Aurangabad536Sep 2020CompletedMar 2026Jul 2024
Construction of 244 EWS and 70 Shops under PMAY Housing Scheme on land S. No. 17 at Ambejogai, BeedP52300049313Ambejogai, Beed244Feb 2023OngoingDec 2025Not delivered
736 EWS TS AND 256 MIG TS AT PLOT NO R-1 ADDITIONAL MIDC LATURP52400017486ADD. MIDC, Latur-Aug 2018OngoingDec 2022Not delivered
364 EWS T/S UNDER PMAY AT JALNA DIS JALNAP51400012018jalna, Jalna80Sep 2017CompletedJul 2019Late, Sep 2020
CONSTRUCTION OF 240 EWS T/S ON GUT NO 09 NAKSATRAWADI AURANGABADP51500013212NAKSHATRAWADI, Aurangabad240Sep 2017CompletedApr 2019Late, Dec 2020

Keep Construction of 132 TS EWS Under PMAY and 48 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near hingoli7 in Hingoli

Builder: AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)

AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA) has 9 registrations on MahaRERA, including 364 EWS T/S UNDER PMAY AT JALNA DIS JALNA and CONSTRUCTION OF 240 EWS T/S ON GUT NO 09 NAKSATRAWADI AURANGABAD. Its filings disclose 8 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Hingoli district page.

Frequently asked questions

What does it mean that Construction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist Hingoli shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Construction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist Hingoli is delayed beyond 10 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Construction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist Hingoli?

The registered promoter entity is AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA), a public authority as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Construction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist Hingoli?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Construction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist Hingoli?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Construction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist Hingoli?

The professionals named in the filing: Architect: DATTATRAYA PARSHURAM; Engineer: SUDHAKAR BAHEGAVANKAR; Engineer: Ankur DIwedi; Chartered Accountant: VAIJANATH PHAD; Chartered Accountant: CHEIF ACCOUNT OFFICER; Chartered Accountant: Anjali Sangvikar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Construction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist Hingoli?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Construction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist Hingoli. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Construction of 132 TS EWS Under PMAY and 48 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.