Palladio Kharadi Central
RG-MH-52061 · RERA P52100050357 · Last updated on MahaRERA portal: 15 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- Rs 70.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 8 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Palladio Kharadi Central is a Others project by Vilas Javdekar Eco Homes in KHARADI, 411014, registered with MahaRERA as P52100050357 on 5 Apr 2023. Possession is promised by 30 Jun 2027. 302 of the 350 units on this registration are recorded sold or booked, and 20 of 44 construction stages are filed complete.
At a glance
Project
- NamePalladio Kharadi Central
- TypeOthers
- Location
- KHARADI
- 411014
- Pincode411014
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100050357
- ReraGenie IDRG-MH-52061
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Apr 2023
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings4 building records
- Documents filed151 files
Current status
Figures as on 15 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing T1 | NA | 28 | 23 | 83 | 11 | 94 |
| Wing T2 | NA | 28 | 23 | 84 | 8 | 92 |
| Wing T3 | NA | 28 | 23 | 84 | 8 | 92 |
| Wing T4 | NA | 28 | 23 | 0 | 72 | 72 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 96%.
Wing T173%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 75% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Wing T274%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 75% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Wing T360%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 96% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing T458%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 15% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 70% |
| Storm Water Drains | Yes | 20% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed559
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing T1 | 147 | 147 |
| Wing T2 | 149 | 149 |
| Wing T3 | 149 | 149 |
| Wing T4 | 114 | 114 |
Land and ownership7
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Shrihari Ganpat Pathare | - | Pune |
| Prakash Shrihari Pathare | - | Pune |
| Arun Shrihari Pathare | - | Pune |
| Omkar Rajendra Pathare | - | Pune |
| Usha Rajendra Pathare | - | Pune |
| Atul Ratikant Pathare | - | Pune |
| Pritam Ratikant Pathare | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing T1 | NA | Rs 46.86 cr | Rs 36.00 cr |
| Wing T3 | NA | Rs 35.88 cr | Rs 31.09 cr |
| Wing T2 | NA | Rs 35.57 cr | Rs 29.89 cr |
| Wing T4 | NA | Rs 32.87 cr | Rs 27.18 cr |
| - | NA | Rs 19.26 cr | Rs 11.16 cr |
Certifying professionals and partners10
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Surendra Gade |
| Architect | Deepali Patidar |
| Architect | Priya Honmute |
| Architect | Mukta Nachare |
| Architect | Sameer Murari Valimbe |
| Architect | Anuja Joshi |
| Engineer | Sagar Kale |
| Chartered Accountant | Abhijit Mundada |
| Chartered Accountant | Patki & Soman |
| Chartered Accountant | Sunil Shamrao Nimbalkar |
| Partner | Role in project |
|---|---|
| Vilas Javdekar Eco Homes | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 1711/2024 | Civil Court Senior Division Pune | Ongoing |
| 39554/2025 | High court, Bombay | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed151
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate PKC 30-06-26.pdf | 15 Jul 2026 |
| Withdrawal Update Form 2File: Engineer certificate PKC 30-06-26.pdf | 15 Jul 2026 |
| Withdrawal Update Form 3File: CA certificate Form 3_PKC_30_06_2026.pdf | 15 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2 A PKC Signed .pdf | 30 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate PKC PH 1 31-03-26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Engg certi_PKC_31032026 Signed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate PKC.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate PKC 31-12-25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate PKC 31-12-25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: CA Certiifcate PKC 31-12-2025.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate PKC PH 1 08-12-2025.pdf | 17 Dec 2025 |
| Withdrawal Update Form 2File: Engineer certificate PKC 08-12-25.pdf | 17 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate PKC 09-12-25.pdf | 17 Dec 2025 |
| Withdrawal Update Form 1File: Architect certificate PKC 30-09-25.pdf | 11 Oct 2025 |
| Withdrawal Update Form 2File: Engineer certificate PKC PH 1 30-09-25.pdf | 11 Oct 2025 |
| Withdrawal Update Form 3File: CA Certificate PKC 30-09-25.pdf | 11 Oct 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 PKC.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: Architect certificate PKC 16-09-25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 2File: Engineer certificate PKC 15-09-25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 3File: CA Certificate PKC 16-09-25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 1File: Architech certificate PKC 24-08-25.pdf | 2 Sep 2025 |
| Withdrawal Update Form 2File: Engineer certificate PKC 24-08-25.pdf | 2 Sep 2025 |
| Withdrawal Update Form 3File: CA certificate (Form 3)_PKC_Stamap u0026 Signed .pdf | 2 Sep 2025 |
| Withdrawal Update Form 1File: Architech certificate PKC 04-08-25.pdf | 13 Aug 2025 |
| Withdrawal Update Form 2File: Engineer certificate PKC 04-08-25.pdf | 13 Aug 2025 |
| Withdrawal Update Form 3File: CA Certificate PKC 05-08-25.pdf | 13 Aug 2025 |
| Form 2A (FY 2024-2025)File: PKC_Form2A_31032025_Signed.pdf | 25 Jun 2025 |
| Form 1File: Architech certificate PKC 31-3-25_Signed.pdf | 6 May 2025 |
| Form 2File: PKC_Engineer_31032025_Signed.pdf | 6 May 2025 |
| Form 3File: PKC_CA_ 31032025_Signed.pdf | 6 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventory PKC_Signed_revised.pdf | 6 May 2025 |
| OthersFile: PKC_Form2A_31032025_Signed.pdf | 6 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate PKC_Signed.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PKC CA certificate_C_Signed.pdf | 5 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate PKC 1_Signed.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory PKC_Signed.pdf | 5 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PKC_Form2A_31032025_Signed.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PKC_Engineer_31032025_Signed.pdf | 22 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: PKC_Sold Inventory_31032025_Signed.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate PKC 31-3-25_Signed.pdf | 9 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (Form 3)_PKC_ Signed_.pdf | 4 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate PKC.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate PKC 24-02-25_signed.pdf | 28 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Encumberance letter Legal PKC_signed.pdf | 14 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Encumberance letter Legal PKC_signed.pdf | 14 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (Form 3)_PKC_signed.pdf | 5 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate PKC 03-02-25_signed.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- PKC_signed (1).pdf | 30 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate PKC 28-01-25_signed.pdf | 30 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_PKC_21-1-25 signed.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate PKC 21-01-25_signed.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate PKC 12-01-25_signed.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- PKC_signed 13-01-25.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate PKC 12-01-25_signed.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory PKC_signed.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate PKC 31-12-24_signed.pdf | 10 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - PKC_signed.pdf | 10 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate PKC 31-12-24_signed.pdf | 10 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate 23-10-24 PKC_signed.pdf | 27 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- PKC_signed_compressed.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate PKC_signed.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 23-10-24 PKC_signed.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 23-10-24 PKC_signed.pdf | 27 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate 16-12-24 PKC_signed.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- PKC_17-12-24signed_compressed.pdf | 17 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate PKC 16-12-24_signed.pdf | 17 Dec 2024 |
| CERSAI detailsFile: Bajaj_CERSAI_Search_Report_Security_Interest_Id_Based_Search_10_10_2024_15_30_21_265.pdf | 13 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate- PKC_signed.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER PKC_signed.pdf | 22 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY PKC-signed.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P52100050357_PKC.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 15_Form 2A_PKC_31032024.pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY PKC_signed.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_certificate_palladio_kharadi_central_signed.pdf | 13 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE PKC_signed.pdf | 13 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_certificate_PKC_signed.pdf | 12 Jul 2024 |
| Declaration about Commencement CertificateFile: Commencement Decalaration_PKC_signed.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15_Architect_PKC_AA_31032024_signed.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15_Engineer Certificate_PKC_signed_20032024.pdf | 15 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 15_Form 2A_PKC_31032024.pdf | 15 Apr 2024 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| YASH101P52100016807 | Sus, Pune | 101 | Jun 2018 | Completed | Mar 2021 | Jan 1970 |
| YashONE Phase - IP52100014585 | Pirangut Valley, Pune | 275 | Dec 2017 | Completed | Dec 2020 | Jan 1970 |
| Yashwin AP52100013149 | Sus, Pune | 100 | Sep 2017 | Completed | Sep 2020 | Jan 1970 |
| Yashwin E,F,GP52100000775 | Sus, Pune | 168 | Jul 2017 | Completed | Dec 2018 | Jan 1970 |
| Yashwin B, C, D | Village Sus Taluka Mulshi District Pune 411021 | 256 | - | Completed | Dec 2016 | Sep 2016 |
| Shivalaya | S no 22 1A City Survey no 664 Kothrud Pune | 8 | - | Completed | Jan 2015 | Jan 2015 |
| Palash | Wakad Taluka Mulshi District - Pune | 319 | - | Completed | Jun 2013 | Jun 2013 |
| Palash Plus | 200 2 200 2 1 Wakad Taluka - Mulshi District - Pune | 155 | - | Completed | Jan 2013 | Dec 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 151 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Palladio Kharadi Central on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHARADI
Filed coordinates, straight-line distance. 105 registered projects within 2 km.
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: Vilas Javdekar Eco Homes
Vilas Javdekar Eco Homes has 11 registrations on MahaRERA, including Yashwin E,F,G and Yashwin A. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if Palladio Kharadi Central is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Palladio Kharadi Central?
The registered promoter entity is Vilas Javdekar Eco Homes, a partnership as per the filing. Its GSTIN 27AAEFV4570G1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Palladio Kharadi Central?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Palladio Kharadi Central?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Palladio Kharadi Central?
The professionals named in the filing: Architect: Ar. Surendra Gade; Architect: Deepali Patidar; Architect: Priya Honmute; Architect: Mukta Nachare; Architect: Sameer Murari Valimbe; Architect: Anuja Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Palladio Kharadi Central?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.