Registered Litigation declared Commercial project

VJ IndiWorks Kharadi Central

By Vilas Javdekar Eco Homes

RG-MH-73119 · RERA PC1260002500692 · Last updated on MahaRERA portal: 16 Sep 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 8 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2030Possession promisedmoved 4 months from the original
3 of 10Construction stages donefurthest along: Slabs of Super Structure, 9%
61 of 661Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

VJ IndiWorks Kharadi Central is a Commercial project by Vilas Javdekar Eco Homes in Pune, Maharashtra, registered with MahaRERA as PC1260002500692 on 1 Sep 2025. Possession is promised by 30 Apr 2030. The completion date has moved by 4 months from the original filing. 600 of the 661 units on this registration are recorded sold or booked, and 3 of 10 construction stages are filed complete.

At a glance

Project

  • NameVJ IndiWorks Kharadi Central
  • TypeCommercial
  • Location
    • Kharadi
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PC1260002500692
  • ReraGenie IDRG-MH-73119

Builder

  • NameVilas Javdekar Eco Homes
  • Entity typePartnership
  • GSTIN27AAEFV4570G1Z0
  • PartnersAditya Vilas Javdekar, Vilas Yashwant Javdekar
  • Other registrations10 more →
  • Completed5 of 11
  • Declared earlier projects8 →

Key dates

this monthRegisteredSep 2025First promiseDec 2029Revised toApr 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2025
  • Promised completion30 Apr 2030
  • Revised completionRevised to 30 Apr 2030 (originally 31 Dec 2029)
  • Buildings1 building record
  • Documents filed51 files

Current status

91%600 of 661 units booked
16.4%Work done, per cost certificate

Figures as on 16 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building DNA26230661661

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 10 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 9%.

Building D: 32% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks9%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1096

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,096
Closed/Covered1,096

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area27,748 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Aug 2025
LandownerVillageDistrict
Nagpal LandmarksPune (M Corp.)Pune
Surendra Bapusaheb PatharePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI26194.49
Proposed, not sanctioned26,194 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Plot No. 1, S. No. 15/1, Sarthak Terraces, Opp. Gandhi Lawns, Kothrud, Pune.411038
Estimated costRs 128.50 cr
Cost incurredRs 21.04 cr
Work done16.37%
BuildingWingEstimatedIncurred
Building DNARs 120.00 crRs 16.95 cr
-NARs 8.50 crRs 4.09 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMukta Vinayak Nachare
ArchitectDeepali Patidar
ArchitectPriya Honmute
ArchitectSameer Murari Valimbe
EngineerSagar Kale
Chartered AccountantSunil Shamrao Nimbalkar
Chartered AccountantAbhijit Mundada
PartnerRole in project
Vilas Javdekar Eco Homes-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PC1260002500692/WarDec 2029 → Apr 2030

Reason as filed by the promoterNA

Litigation declared4

CaseCourtStatus
SPL.C.S. 1711/2024Civil CourtOngoing
WPST/20972/2025/2025High Court of BombayClosed
R.C.S. 58 /2026Civil Court PuneOngoing
39554/2025High court, BombayOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jan 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2030

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate VJ Indiworks Kharadi Central 01-09-2026.pdf16 Sep 2026
Withdrawal Update Form 2File: Engineer Certificate Indiworks kharadi central 01-09-26.pdf16 Sep 2026
Withdrawal Update Form 3File: CA Certifcate VJIWKC 01-09-2026.pdf16 Sep 2026
Withdrawal Update Form 1File: Architect Certificate Indiworks Kharadi 26-07-26.pdf10 Aug 2026
Withdrawal Update Form 2File: Engineer Certifiacte Indiworks Kharadi 26-07-26 .pdf10 Aug 2026
Withdrawal Update Form 3File: CA certificate Form 3_VJIWKC_26_07_2026.pdf10 Aug 2026
Withdrawal Update Form 1File: Architect Certificate IWKC 30-06-26.pdf15 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate IWKC 30-06-26.pdf15 Jul 2026
Withdrawal Update Form 3File: CA certificate VJIWKC 30-06-2026.pdf15 Jul 2026
Withdrawal Update Form 1File: AR Certifiacte Indiworks kharadi 29-05-26.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate Indiworks Kharadi 11-06-26 .pdf20 Jun 2026
Withdrawal Update Form 3File: CA certificate VJIWKC_11-06-26 .pdf20 Jun 2026
Withdrawal Update Form 1File: AR Certifiacte Indiworks kharadi 29-05-26.pdf13 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate Indiworks kharadi 29-05-26.pdf13 Jun 2026
Withdrawal Update Form 3File: CA Certificate VJ Indiworks kharadi central 30-05-26Compress.pdf13 Jun 2026
Withdrawal Update Form 1File: Architect Certificate VJ IWKC 05-05-26.pdf12 Jun 2026
Withdrawal Update Form 2File: Engineer certiifcate Indiworks kharadi Central 05-05-26.pdf12 Jun 2026
Withdrawal Update Form 3File: CA certificate_VJIWKC_05-05-2026 .pdf12 Jun 2026
Form 2A (FY 2025-2026)File: Form 2 A VJIWKC Signed.pdf30 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Indiworks kharadi31-03-26.pdf20 Apr 2026
Withdrawal Update Form 2File: Engg certi_VJIWKC_30032026 Signed.pdf20 Apr 2026
Withdrawal Update Form 3File: CA Certificate VJIWK 30-03-26.pdf20 Apr 2026
Layout approvalFile: VJIWKC Sanctioned layout dated 21012026 for RERA_compressed.pdf31 Jan 2026
Building plan approvalFile: 05- G1 and 1st Floor Plan_Building D_compressed.pdf31 Jan 2026
Building plan approvalFile: 06- 2nd and 3rd Floor Plan_Building D_compressed.pdf31 Jan 2026
Building plan approvalFile: 07- Typical Floor Plan_Building D_compressed.pdf31 Jan 2026
Building plan approvalFile: 08- Sections_Building D_compressed.pdf31 Jan 2026
Building plan approvalFile: 09- Sections-Elevation Building D_compressed.pdf31 Jan 2026
Withdrawal Update Form 1File: Architect Certificate VJ Indiworks Kharadi Central 31-12-25.pdf13 Jan 2026
Withdrawal Update Form 2File: Engineer certificate IWKC 31-12-25.pdf13 Jan 2026
Withdrawal Update Form 3File: CA Certificate IWKC 31-12-25 .pdf13 Jan 2026
Layout approvalFile: VJ IW (K) Sanctioned layout dated 30102025 for RERA.pdf15 Nov 2025
Building plan approvalFile: 02- Basements 03 and 02 Plans_compressed.pdf15 Nov 2025
Building plan approvalFile: 03- Basements 01 Plan_compressed.pdf15 Nov 2025
Building plan approvalFile: 04- Ground Floor Plan_compressed.pdf15 Nov 2025
Building plan approvalFile: 05- Building D_compressed.pdf15 Nov 2025
Building plan approvalFile: 06- Building D_compressed.pdf15 Nov 2025
Building plan approvalFile: 07- Building D_compressed.pdf15 Nov 2025
Building plan approvalFile: 08- Building D_compressed.pdf15 Nov 2025
Withdrawal Update Form 1File: Architect certificate IWKC 30-09-25.pdf11 Oct 2025
Withdrawal Update Form 2File: Engineer certificate Indiworks kharadi 30-09-25.pdf11 Oct 2025
Withdrawal Update Form 3File: CA Certificate Indiworks kharadi 30-09-25.pdf11 Oct 2025
Declaration and undertaking (Annexure A)File: Revised ANNEXURE A Indiworks kharadi.pdf14 Aug 2025
Layout approvalFile: VJIWK Sanctioned layout dated 30062025 for RERA.pdf29 Jul 2025
Building plan approvalFile: 02- Basements 03 & 02 Plans.pdf29 Jul 2025
Building plan approvalFile: 03- Basements 01 Plan.pdf29 Jul 2025
Building plan approvalFile: 04- Ground Floor Plan.pdf29 Jul 2025
Building plan approvalFile: 05- Building D.pdf29 Jul 2025
Building plan approvalFile: 06- Building D.pdf29 Jul 2025
Building plan approvalFile: 07- Building D.pdf29 Jul 2025
Building plan approvalFile: 08- Building D.pdf29 Jul 2025

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
YASH101P52100016807Sus, Pune101Jun 2018CompletedMar 2021Jan 1970
YashONE Phase - IP52100014585Pirangut Valley, Pune275Dec 2017CompletedDec 2020Jan 1970
Yashwin AP52100013149Sus, Pune100Sep 2017CompletedSep 2020Jan 1970
Yashwin E,F,GP52100000775Sus, Pune168Jul 2017CompletedDec 2018Jan 1970
Yashwin B, C, DVillage Sus Taluka Mulshi District Pune 411021256-CompletedDec 2016Sep 2016
ShivalayaS no 22 1A City Survey no 664 Kothrud Pune8-CompletedJan 2015Jan 2015
PalashWakad Taluka Mulshi District - Pune319-CompletedJun 2013Jun 2013
Palash Plus200 2 200 2 1 Wakad Taluka - Mulshi District - Pune155-CompletedJan 2013Dec 2012

How this compares with Pune

91%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VJ IndiWorks Kharadi Central on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharadi13,700+ in Pune

2 kmVJ IndiWorks Kharadi CenCompleted 54Lapsed / revoked 31Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 126 registered projects within 2 km.

Builder: Vilas Javdekar Eco Homes

Vilas Javdekar Eco Homes has 11 registrations on MahaRERA, including Yashwin E,F,G and Yashwin A. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VJ IndiWorks Kharadi Central is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VJ IndiWorks Kharadi Central?

The registered promoter entity is Vilas Javdekar Eco Homes, a partnership as per the filing. Its GSTIN 27AAEFV4570G1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VJ IndiWorks Kharadi Central?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VJ IndiWorks Kharadi Central?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VJ IndiWorks Kharadi Central?

The professionals named in the filing: Architect: Mukta Vinayak Nachare; Architect: Deepali Patidar; Architect: Priya Honmute; Architect: Sameer Murari Valimbe; Engineer: Sagar Kale; Chartered Accountant: Sunil Shamrao Nimbalkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VJ IndiWorks Kharadi Central?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VJ IndiWorks Kharadi Central. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VJ IndiWorks Kharadi Central to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.