ReraGenieLog inGet a buyer report

Home / Browse projects / VJ IndiLife Kharadi

Registered No litigation declared Others project

VJ IndiLife Kharadi

By VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP

RG-MH-59956 · RERA P52100056019 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: .
Dec 2028Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 80%
140 of 835Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 159 documents Report an error

VJ IndiLife Kharadi is a Others project by VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP in Kharadi, 411014, registered with MahaRERA as P52100056019 on 6 May 2024. Possession is promised by 31 Dec 2028. 695 of the 835 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameVJ IndiLife Kharadi
  • TypeOthers
  • Location
    • Kharadi - Wagholi Street
    • Kharadi
    • 411014
  • Pincode411014
  • RERA no.P52100056019
  • ReraGenie IDRG-MH-59956

Builder

  • NameVILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
  • Entity typePartnership
  • GSTIN27AASFG4227B1ZH
  • PartnerAditya Vilas Javdekar
  • Other registrations4 more →
  • Completed4 of 5

Key dates

this monthRegisteredMay 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 May 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed159 files

Current status

83%695 of 835 units booked
62.4%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 1NA39357626768
Wing 2NA107184967

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 80%.

Wing 145%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing 257%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed908

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots908
Closed/Covered879
Open Space29
BuildingClosed/CoveredOpen SpaceTotal
Wing 17620762
Wing 211729146

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,400 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 May 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI27250.0
Proposed, not sanctioned25,832 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 1, S NO 18/1, SARTHAK TERRACE, OPPOSITE GANDHI LAWNS, KOTHRUD, PUNE 411038
Estimated costRs 116.32 cr
Cost incurredRs 72.63 cr
Work done62.44%
BuildingWingEstimatedIncurred
Wing 1NARs 85.55 crRs 47.71 cr
Wing 2NARs 19.00 crRs 15.12 cr
-NARs 11.77 crRs 9.80 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnuja Joshi
ArchitectVoussoirs
ArchitectDeepali Patidar
ArchitectPriya Honmute
EngineerSagar Kale
Chartered AccountantAbhijit mundada
Chartered AccountantSunil Nimbalkar
PartnerRole in project
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed159

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 159 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate VJ Indilife kharadi 30-06-26.pdf18 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate VJ Indilife Kharadi 30-06-26.pdf18 Jul 2026
Withdrawal Update Form 3File: CA certificate Form 3_VJ Indilife Kharadi_30-06-2026.pdf18 Jul 2026
Withdrawal Update Form 1File: AR Certificate VJ Indilife Kharadi 29-05-26.pdf22 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate VJ Indilife Kharadi 08-06-26 .pdf22 Jun 2026
Withdrawal Update Form 3File: CA certificate VJ Indilife Kharadi_08-06-2026.pdf22 Jun 2026
Withdrawal Update Form 1File: AR Certificate VJ Indilife Kharadi 29-05-26.pdf11 Jun 2026
Withdrawal Update Form 2File: Engineer certificate VJ Indilife kharadi 29-05-26.pdf11 Jun 2026
Withdrawal Update Form 3File: CA Certificate VJ Indilife Kharadi 30-05-26Revised.pdf11 Jun 2026
Withdrawal Update Form 1File: Architect Certificate Indilife kharadi 11-05-26 .pdf22 May 2026
Withdrawal Update Form 2File: Engineer certificate VJ Indilife Kharadi 11-05-26.pdf22 May 2026
Withdrawal Update Form 3File: CA certificate VJ Indilife Kharadi_11-05-2026_Scanned.pdf22 May 2026
Form 2A (FY 2025-2026)File: Form 2 A VJ Indilife Kharadi Signed.pdf30 Apr 2026
Withdrawal Update Form 1File: Engg certi_VJ Indilife Kharadi_30032026 Signed.pdf20 Apr 2026
Withdrawal Update Form 2File: Engg certi_VJ Indilife Kharadi_30032026 Signed.pdf20 Apr 2026
Withdrawal Update Form 3File: Scanned Copy of VJ Indilife Kharadi Compressed.pdf20 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Indilife kharadi 24-02-26.pdf18 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Indilife kharadi 24-02-26 .pdf18 Mar 2026
Withdrawal Update Form 3File: CA Certificate VJ Indilife Kharadi 25-02-26.pdf18 Mar 2026
Withdrawal Update Form 1File: Architect certificate VJ Indilife kharadi 10-02-26 (2).pdf14 Mar 2026
Withdrawal Update Form 2File: Enginner certificate VJ Indilife Kharadi 10-02-26 .pdf14 Mar 2026
Withdrawal Update Form 3File: CA Certificate Indilife Kharadi 11-02-26.pdf14 Mar 2026
Withdrawal Update Form 1File: Architect Certificate VJ Indilife Kharadi 23-01-26.pdf13 Feb 2026
Withdrawal Update Form 2File: Engineer Certiifcate Indilife Kharadi 23-01-26.pdf13 Feb 2026
Withdrawal Update Form 3File: CA certificate VJ INDILIFE KHARADI 24-01-2026.pdf13 Feb 2026
Withdrawal Update Form 1File: Architect Certificate Indilife Kharadi 31-12-25.pdf12 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate Indilife kharadi 31-12-25.pdf12 Jan 2026
Withdrawal Update Form 3File: CA Certiifcate VJ Indilife kharadi 31-12-25.Pdf12 Jan 2026
Withdrawal Update Form 1File: Architect Certificate Indilife Kharadi 15-12-2025.pdf3 Jan 2026
Withdrawal Update Form 1File: Architect Certificate Indilife Kharadi 15-12-2025.pdf3 Jan 2026
Withdrawal Update Form 2File: Engineer Certiifcate Indilife kharadi PH 2 21-12-25.pdf3 Jan 2026
Withdrawal Update Form 2File: Engineer Certiifcate Indilife kharadi PH 2 22-12-25.pdf3 Jan 2026
Withdrawal Update Form 3File: CA certificate Form 3_VJ Indilife Kharadi_22_12_2025_ Commpress.pdf3 Jan 2026
Withdrawal Update Form 3File: CA Certificate Indilife kharadi 23-12-25.pdf3 Jan 2026
Withdrawal Update Form 1File: Architect Certificate Indilife Kharadi 15-12-2025.pdf24 Dec 2025
Withdrawal Update Form 2File: Engineer certificate Indilife Kharadi 15-12-25.pdf24 Dec 2025
Withdrawal Update Form 3File: CA Certificate VJ INDILIFE KHARADI 16-12-25.pdf24 Dec 2025
Withdrawal Update Form 1File: Architect Certificate Indilife Kharadi 01-12-25.pdf8 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate Indilife kharadi 01-12-25.pdf8 Dec 2025
Withdrawal Update Form 3File: CA Certificate VJ INDILIFE KHARADI 01-12-25.pdf8 Dec 2025
Withdrawal Update Form 1File: Architect certificate VJILK 30-09-25.pdf19 Nov 2025
Withdrawal Update Form 1File: Architect certificate VJILK 30-09-25.pdf19 Nov 2025
Withdrawal Update Form 2File: Engineer certificate Indilife kharadi 30-09-25.pdf19 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate Indilife Kharadi 02-11-25.pdf19 Nov 2025
Withdrawal Update Form 3File: CA Certificate Indilife kharadi 30-09-2025.pdf19 Nov 2025
Withdrawal Update Form 3File: CA certificate VJ Indilife Kharadi.pdf19 Nov 2025
Withdrawal Update Form 1File: Architect certificate VJILK 30-09-25.pdf15 Oct 2025
Withdrawal Update Form 2File: Engineer certificate Indilife kharadi 30-09-25.pdf15 Oct 2025
Withdrawal Update Form 3File: CA Certificate Indilife kharadi 30-09-2025.pdf15 Oct 2025
Withdrawal Update Form 1File: Architect certificate VJILK 28-09-25.pdf30 Sep 2025
Withdrawal Update Form 2File: Engineer certificate VJILK 28-09-25.pdf30 Sep 2025
Withdrawal Update Form 3File: CA Certificate Indilife Kharadi 29-09-25.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: VJGDLLP_Form 5_P52100056019_VJILK.pdf30 Sep 2025
Withdrawal Update Form 1File: Architect certificate Indilife Kharadi 08-09-25.pdf18 Sep 2025
Withdrawal Update Form 2File: Engineer certificate Indilife kharadi 16-09-25.pdf18 Sep 2025
Withdrawal Update Form 3File: CA Certificate Indilife Kharadi 16-09-25.pdf18 Sep 2025
Withdrawal Update Form 1File: Architect certificate Indilife Kharadi 08-09-25.pdf12 Sep 2025
Withdrawal Update Form 2File: Engineer certificate VJILK 08-09-25.pdf12 Sep 2025
Withdrawal Update Form 3File: CA Certificate Indilife kharadi 09-09-25.pdf12 Sep 2025
Layout approvalFile: AREA for RERA 05-09-2025_compressed.pdf8 Sep 2025
Building plan approvalFile: 02- Wing 01 and 02 Parking layout_compressed.pdf8 Sep 2025
Building plan approvalFile: 03- Wing 01_compressed.pdf8 Sep 2025
Building plan approvalFile: 04- Wing 01_compressed.pdf8 Sep 2025
Building plan approvalFile: 05- Wing 01_compressed.pdf8 Sep 2025
Building plan approvalFile: 06 - Wing 01_compressed.pdf8 Sep 2025
Building plan approvalFile: 07- Wing 01_compressed.pdf8 Sep 2025
Building plan approvalFile: 08- Wing 02 (Inclusive Housing)_compressed.pdf8 Sep 2025
Building plan approvalFile: 09- Wing 02 (Inclusive Housing)_compressed.pdf8 Sep 2025
Building plan approvalFile: 10- Wing 02 (Inclusive Housing)_compressed.pdf8 Sep 2025
Building plan approvalFile: 11- Wing 02 (Inclusive Housing)_compressed.pdf8 Sep 2025
Withdrawal Update Form 1File: Architech certificate Indilife kharadi 11-08-25.pdf20 Aug 2025
Withdrawal Update Form 2File: Engineer certificate Indilife kharadi 11-08-25.pdf20 Aug 2025
Withdrawal Update Form 3File: CA certificate (Form 3) VJ Indilife Kharadi__Stamp u0026 Signed.pdf20 Aug 2025
Withdrawal Update Form 1File: Architech certificate Indilife Kharadi 30-06-25.pdf18 Aug 2025
Withdrawal Update Form 2File: Engineer certiifcate VJ Indilife kharadi 30-06-25.pdf18 Aug 2025
Withdrawal Update Form 3File: VJGDLLP- VJ INDILIFE KHARADI.pdf18 Aug 2025
Form 2A (FY 2024-2025)File: VJILK_Form2A_31032025_Signed.pdf26 Jun 2025
Form 1File: VJILK_Architect_31032025_Signed.pdf6 May 2025
Form 2File: VJILK_Engineer_31032025_Signed.pdf6 May 2025
Form 3File: VJILK_CA_ 31032025_Signed.pdf6 May 2025

Keep VJ IndiLife Kharadi on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharadi

Builder: VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP

VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP has 5 registrations on MahaRERA, including Yashwin Orizzonte - Phase I and VJ IndiLife. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if VJ IndiLife Kharadi is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VJ IndiLife Kharadi?

The registered promoter entity is VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27AASFG4227B1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VJ IndiLife Kharadi?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VJ IndiLife Kharadi?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VJ IndiLife Kharadi?

The professionals named in the filing: Architect: Anuja Joshi; Architect: Voussoirs; Architect: Deepali Patidar; Architect: Priya Honmute; Engineer: Sagar Kale; Chartered Accountant: Abhijit mundada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VJ IndiLife Kharadi?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VJ IndiLife Kharadi. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VJ IndiLife Kharadi to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.