Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 7 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

Yashwin E,F,G is a Residential / Group Housing project by Vilas Javdekar Eco Homes in Pune, Maharashtra, registered with MahaRERA as P52100000775 on 23 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2018.

At a glance

Project

  • NameYashwin E,F,G
  • TypeResidential / Group Housing
  • Location
    • Sus
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000775
  • ReraGenie IDRG-MH-09915

Builder

  • NameVilas Javdekar Eco Homes
  • Entity typePartnership
  • GSTIN27AAEFV4570G1Z0
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerAditya Vilas Javdekar
  • Other registrations10 more →
  • Completed5 of 11
  • Declared earlier projects8 →

Key dates

this monthRegisteredJul 2017PromisedDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jul 2017
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings3 building records
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ENA130000
Building FNA130000
Building GNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

Building E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building G91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed100

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots100
Closed/Covered100
BuildingClosed/CoveredTotal
Building E3838
Building F4040
Building G2222

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,382 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10731.9
Proposed, not sanctioned10,732 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSarthak Terraces Kothrud Pune

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrakash Kulkarni
EngineerJayant Vinayak Inamdar
PartnerRole in project
Vilas Javdekar Eco Homes-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Jun 2023

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Yashwin_EFG_EF.pdf29 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Yashwin_EFG_G.pdf29 Jun 2023
Status of ConveyanceFile: Yashwin Wing E II Index II Copy.pdf29 Jun 2023
Status of ConveyanceFile: Yashwin Wing F Index II Copy.pdf29 Jun 2023
Status of ConveyanceFile: Yashwin Wing G Index II Copy.pdf29 Jun 2023
Status of ConveyanceFile: Yashwin E,F,G_Conveyance.pdf22 Aug 2021
Certificates of CA (Form 5)File: YASHWIN E,F,G FORM 5.pdf29 Sep 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Yashwin G wing society formation certificate0001.pdf7 Jun 2018
Certificates of Architect (Form 4)File: FORM 4 - YASHWIN G.pdf12 May 2018
Certificates of Architect (Form 4)File: YASHWIN WING -G.pdf12 May 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Yashwin G wing- PDCC Account Application.pdf26 Apr 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Scan yashwin Wing E.pdf20 Apr 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Soc Formation yashwin E.pdf20 Apr 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Scan yashwin Wing f.pdf20 Apr 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Soc Formation yashwin F.pdf20 Apr 2018
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE - VJEH - YASHWIN E,F,G - revised.pdf7 Mar 2018
OtherFile: Soc Formation yashwin E.pdf2 Mar 2018
OtherFile: Scan yashwin Wing E.pdf2 Mar 2018
OtherFile: Soc Formation yashwin F.pdf2 Mar 2018
OtherFile: Scan yashwin Wing f.pdf2 Mar 2018
Certificates of Architect (Form 4)File: RERA YASHWIN EFG.pdf24 Jan 2018
Certificates of Architect (Form 4)File: COMPLETION CERTIFICATE E and F.pdf24 Jan 2018
OtherFile: COMPLETION CERTIFICATE E and F.pdf24 Jan 2018
Details of encumbrancesFile: ENCUMBERANCE REVISED - YASHWIN E,F,G.pdf16 Oct 2017
Declaration in FORM BFile: FORM B - REVISED - YASHWIN E,F,G.pdf16 Oct 2017
Proforma of Allotment letterFile: AFS CHANGE - REVISED - YASHWIN E,F,G.pdf16 Oct 2017
Building plan approvalFile: yashwin new layout IOD.pdf19 Jul 2017
Layout approvalFile: yashwin new layout Approval.pdf19 Jul 2017
Layout approvalFile: Y g 1.pdf19 Jul 2017
Layout approvalFile: y f 2.pdf19 Jul 2017
Layout approvalFile: y f 1 NEW.pdf19 Jul 2017
Layout approvalFile: y e 4.pdf19 Jul 2017
Layout approvalFile: y e 3.pdf19 Jul 2017
PAN CardFile: VJEH - PAN.pdf19 Jul 2017
Copy of the legal title reportFile: TSR - YASHWIN EFG.pdf19 Jul 2017
Details of encumbrancesFile: ENCUMBARANCE CERTIFICATE - YASHWIN.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: yashwin new layout Approval.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: Y g 1.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: y f 2.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: y f 1 NEW.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: y e 4.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: y e 3.pdf19 Jul 2017
Building Plan Approval (IOD)File: yashwin new layout IOD.pdf19 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: YASHWIN COMMENCEMENT - January 2017.pdf19 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: YASHWIN COMMENCEMENT - JULY 2017.pdf19 Jul 2017
Declaration in FORM BFile: DECLARATION - AVJ - YASHWIN.pdf19 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - YASHWIN.pdf19 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: YASHWIN ENGINEER CERTIFICATE.pdf19 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE - YASHWIN.pdf19 Jul 2017
Proforma of Allotment letterFile: YASHWIN ATS - RERA.pdf19 Jul 2017
OtherFile: CONFIRMATION OF ATS0001.pdf19 Jul 2017

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
YASH101P52100016807Sus, Pune101Jun 2018CompletedMar 2021Jan 1970
YashONE Phase - IP52100014585Pirangut Valley, Pune275Dec 2017CompletedDec 2020Jan 1970
Yashwin AP52100013149Sus, Pune100Sep 2017CompletedSep 2020Jan 1970
Yashwin B, C, DVillage Sus Taluka Mulshi District Pune 411021256-CompletedDec 2016Sep 2016
ShivalayaS no 22 1A City Survey no 664 Kothrud Pune8-CompletedJan 2015Jan 2015
PalashWakad Taluka Mulshi District - Pune319-CompletedJun 2013Jun 2013
Palash Plus200 2 200 2 1 Wakad Taluka - Mulshi District - Pune155-CompletedJan 2013Dec 2012

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Yashwin E,F,G on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sus13,700+ in Pune

2 kmYashwin E,F,GCompleted 106Lapsed / revoked 37Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 213 registered projects within 2 km.

Builder: Vilas Javdekar Eco Homes

Vilas Javdekar Eco Homes has 11 registrations on MahaRERA, including Yashwin E,F,G and Yashwin A. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Yashwin E,F,G is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yashwin E,F,G?

The registered promoter entity is Vilas Javdekar Eco Homes, a partnership as per the filing. Its GSTIN 27AAEFV4570G1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yashwin E,F,G?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Yashwin E,F,G?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yashwin E,F,G?

The professionals named in the filing: Architect: Prakash Kulkarni; Engineer: Jayant Vinayak Inamdar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yashwin E,F,G?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yashwin E,F,G. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yashwin E,F,G to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.