Home / Browse projects / RIVERDALE GRAND

Registered Litigation declared Residential / Group Housing project

RIVERDALE GRAND

By DUVILLE ESTATES PRIVATE LIMITED

RG-MH-27708 · RERA P52100034877 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • 1 complaint at MahaRERA
  • Rs 185.00 crore secured on the land, in favour of HDFC Bank Limited

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Sep 2028Possession promisedno revision filed
16 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 85%
294 of 615Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 227 documents Report an error

RIVERDALE GRAND is a Residential / Group Housing project by DUVILLE ESTATES PRIVATE LIMITED in New Kharadi Behind Zenser IT Park, 411014, registered with MahaRERA as P52100034877 on 28 Apr 2022. Possession is promised by 30 Sep 2028. 321 of the 615 units on this registration are recorded sold or booked, and 16 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRIVERDALE GRAND
  • TypeResidential / Group Housing
  • Location
    • Shivane Riverside Road
    • New Kharadi Behind Zenser IT Park
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034877
  • ReraGenie IDRG-MH-27708

Builder

  • NameDUVILLE ESTATES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorTushad Behram Dubash
  • Other registrations7 more →
  • Completed4 of 8
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2022PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2022
  • Promised completion30 Sep 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed227 files

Current status

52%321 of 615 units booked
32.1%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B1NA32271570157
B2NA27261510151
B3NA27261540154
B4NA34261530153

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

B151%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B248%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B346%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B437%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure2%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1044

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,044
Closed/Covered1,044
BuildingClosed/CoveredTotal
B1261261
B2261261
B3261261
B4261261

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area15,628 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofHDFC Bank Limited
Secured amountRs 185.00 crore
CERSAI search filedYes
Declared on29 Jun 2026
LandownerVillageDistrict
Tushad Behram Dubash Trust & Ria Behram Dubash TruMumbai CityMumbai City
Ramesh Dattatray AdhavPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Authority
Permissible FSI98858.6
Proposed, not sanctioned75,536 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFort Mumbai
Estimated costRs 1,192.26 cr
Cost incurredRs 383.11 cr
Work done32.13%
BuildingWingEstimatedIncurred
B1NARs 290.01 crRs 95.78 cr
B2NARs 290.01 crRs 95.78 cr
B3NARs 290.01 crRs 95.78 cr
B4NARs 290.01 crRs 95.78 cr
-NARs 32.22 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPinnac AECL Consultancy Pvt Ltd
EngineerJW Consultants
EngineerJones Lang LaSalle
Chartered AccountantDhirubhai Shah & Co LLP
Chartered AccountantKalyaniwalla & Mistry LLP
PartnerRole in project
DUVILLE ESTATES PRIVATE LIMITED-

Litigation declared6

CaseCourtStatus
1774/2015Court of Civil Judge Senior Division PuneClosed
226/2015Court of Civil Judge Senior Division PuneOngoing
597/2015Court of Civil Judge Senior Division PuneOngoing
142/2017Court of Civil Judge Senior Division PuneOngoing
6027/2012Court of Civil Judge Senior Division PuneOngoing
1774/2015Court of Civil Judge Senior Division PuneClosed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000370919UDAY LAXMANDAS DEVIM/S DUVILLE ESTATE PVT LTD14/05/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2028

Documents filed227

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 227 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: 03-51 - Ground Parking floor - B1 to B4 - 2231.pdf24 Apr 2026
Building plan approvalFile: 04-51 - P1 Plan - B1 to B4 - 2231.pdf24 Apr 2026
Building plan approvalFile: 05-51 - P2 Plan - B1 to B4 - 2231.pdf24 Apr 2026
Building plan approvalFile: 06-51 - P3 Plan - B1 to B4 - 2231.pdf24 Apr 2026
Building plan approvalFile: 07-51 - Podium Floor Plan - B1 to B4 -2231_compressed.pdf24 Apr 2026
Building plan approvalFile: 08-51 - 1st Floor - B1 - 2231_compressed.pdf24 Apr 2026
Building plan approvalFile: 09-51 - B1 Building Plan - 2231.pdf24 Apr 2026
Building plan approvalFile: 10-51 - B1 Refuge Floor Plan - 2231.pdf24 Apr 2026
Building plan approvalFile: 14-51 - 1st Floor Plan - B2 -2231.pdf24 Apr 2026
Building plan approvalFile: 15-51 - Building Plan - B2 - 2231.pdf24 Apr 2026
Building plan approvalFile: 16-51 - Refuge Floor Plan - B2 -2231.pdf24 Apr 2026
Building plan approvalFile: 20-51 - 1st Floor - B3 - 2231.pdf24 Apr 2026
Building plan approvalFile: 21-51 - Building Plans - B3 - 2231.pdf24 Apr 2026
Building plan approvalFile: 22-21 - Refuge Floor Plan - B3 - 2231.pdf24 Apr 2026
Building plan approvalFile: 24-51 - 1st Floor - B4 - 2231_compressed.pdf24 Apr 2026
Building plan approvalFile: 25-51 - Building Plan - B4 - 2231.pdf24 Apr 2026
Building plan approvalFile: 26-51 - Refuge Floor Plan - B4 - 2231.pdf24 Apr 2026
Building plan approvalFile: 28-51 - Section Plan - B1toB4 - 2231.pdf24 Apr 2026
Building plan approvalFile: 29-51 - Section Plan Grand - 2231.pdf24 Apr 2026
Commencement certificateFile: CC - 15Sep2025.pdf21 Apr 2026
Layout approvalFile: 01-51 - Layout - 2231.pdf21 Apr 2026
Commencement certificateFile: CC-2053-2024 17Oct2024.pdf16 Apr 2026
Withdrawal Update Form 1File: 12 Form 1 - Riverdale Grand - Dec 2025.pdf16 Apr 2026
Withdrawal Update Form 1File: 12 Form 1 - Riverdale Grand - Dec 2025.pdf16 Apr 2026
Withdrawal Update Form 2File: Grand Form 2 Dec 2025.pdf16 Apr 2026
Withdrawal Update Form 2File: Grand Form 2 Dec 2025.pdf16 Apr 2026
Withdrawal Update Form 3File: FORM 3-Grand Dec2025.pdf16 Apr 2026
Withdrawal Update Form 3File: FORM 3-Grand Dec2025.pdf16 Apr 2026
Form 1File: 1 Form 1 - Riverdale Grand - Jul 2022 - Signed.pdf6 Mar 2026
Form 2File: 1 Form 2 - Riverdale Grand - Jul 2022 - Signed.pdf6 Mar 2026
Form 3File: Form 3 - R Grand - July 2022.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Details - Jun 2022.pdf6 Mar 2026
Form 1File: 2 Form 1 - Riverdale Grand - Sep 2022 - Signed.pdf6 Mar 2026
Form 2File: 2 Form 2 - Riverdale Grand - Sep 2022 - Signed.pdf6 Mar 2026
Form 3File: Form 3 - R Grand - Sep 2022.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Details - Sep 2022.pdf6 Mar 2026
Form 5 (FY 2023-2024)File: Form 5 - Riverdale Grand - FY 2023-24.pdf6 Mar 2026
Form 5 (FY 2022-2023)File: Form 5 - Riverdale Grand - FY 2022-23.pdf6 Mar 2026
Form 1File: 11 Form 1 - Riverdale Grand - Sep 2025.pdf10 Nov 2025
Form 2File: 9 Form 2 - Riverdale Grand - Sep 2025.pdf10 Nov 2025
Form 3File: Form 3 - R Grand - Sep 2025_compressed.pdf10 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory Details - 30Sep2025.pdf10 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 - Riverdale Grand.pdf30 Sep 2025
Form 1File: Form 1 - Riverdale Grand - Sep 2023.pdf17 Sep 2025
Form 2File: Form 2 - Riverdale Grand - Sep 2023.pdf17 Sep 2025
Form 3File: Form-3 - R Grand - Sep 2023.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: Grand Sales Data Sep 2023.pdf17 Sep 2025
Form 1File: Form 1 - Riverdale Grand - Jun 2023.pdf17 Sep 2025
Form 2File: Form 2 - Riverdale Grand - Jun 2023.pdf17 Sep 2025
Form 3File: Form-3 - R Grand - June 2023.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: Grand Sales Data June 2023.pdf17 Sep 2025
Form 1File: Form 1 - Riverdale Grand - Mar 2023.pdf17 Sep 2025
Form 2File: Form 2 - Riverdale Grand - Mar 2023.pdf17 Sep 2025
Form 3File: Form 3 - R Grand - Mar 2023.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: Grand Sales Data March 2023.pdf17 Sep 2025
Form 1File: Form 1 - Riverdale Grand - Dec 2022 - signed.pdf17 Sep 2025
Form 2File: Form 2 - Riverdalr Grand - Dec 2022.pdf17 Sep 2025
Form 3File: Form 3 - R Grand - Dec 2022.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: Grand - Sales Data Dec 2022.pdf17 Sep 2025
Form 1File: Grand Form 1 June24.pdf12 Sep 2025
Form 2File: Grand Form 2 June 2024.pdf12 Sep 2025
Form 3File: Form 3 Grand June 2024.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Grand Sales Data June 2024.pdf12 Sep 2025
Form 1File: Riverdale Grand Form 1 March 2024.pdf12 Sep 2025
Form 2File: Form 2 Grand March 2024.pdf12 Sep 2025
Form 3File: Form 3 Grand March 2024.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Grand Sales Data March 2024.pdf12 Sep 2025
Form 1File: Form 1 Grand Dec 2023.pdf12 Sep 2025
Form 2File: Form 2 - Riverdale Grand - Dec 2023.pdf12 Sep 2025
Form 3File: Form-3 - R Grand - Dec 2023.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Grand Sales Data Dec 2023.pdf12 Sep 2025
Form 1File: Form 1 Riverdale Grand September 2024.pdf11 Sep 2025
Form 2File: Grand Form 2 September 2024.pdf11 Sep 2025
Form 3File: Grand Form 3 September 24.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Grand Sales Data Sep 2024.pdf11 Sep 2025
Form 1File: RERA Form 1 - Riverdale Grand - 30-06-2025.pdf10 Sep 2025
Form 2File: Form 2 - Riverdale Grand June 2025.pdf10 Sep 2025
Form 3File: Grand - Form 3 - June 2025.pdf10 Sep 2025
Disclosure of Sold and Booked InventoryFile: Grand Sales Data - June 2025.pdf10 Sep 2025
Form 1File: Form 1 Riverdale Grand March 2025.pdf22 Jul 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Riverdale Residences-IP52100004692KHARADI-Aug 2017CompletedOct 2023Registered original: Oct 2022Late, Feb 2024
Riverdale HeightsKharadi Shivane Road Village Kharadi Talukar Haveli Pune557-CompletedFeb 2021Late, Feb 2022

Keep RIVERDALE GRAND on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near New Kharadi Behind Zenser IT Park

2 kmRIVERDALE GRANDCompleted 5Lapsed / revoked 1Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: DUVILLE ESTATES PRIVATE LIMITED

Duville Estates Private Limited has 8 registrations on MahaRERA, including Riverdale Heights and Riverdale Residences-I. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if RIVERDALE GRAND is delayed beyond 30 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RIVERDALE GRAND?

The registered promoter entity is DUVILLE ESTATES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RIVERDALE GRAND?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RIVERDALE GRAND?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RIVERDALE GRAND?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RIVERDALE GRAND?

The professionals named in the filing: Architect: Pinnac AECL Consultancy Pvt Ltd; Engineer: JW Consultants; Engineer: Jones Lang LaSalle; Chartered Accountant: Dhirubhai Shah & Co LLP; Chartered Accountant: Kalyaniwalla & Mistry LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RIVERDALE GRAND?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RIVERDALE GRAND. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RIVERDALE GRAND to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.