Home / Browse projects / VJ Central Avenue
VJ Central Avenue
RG-MH-87420 · RERA P52100050364 · Last updated on MahaRERA portal: 11 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- 1 complaint at MahaRERA
- Rs 70.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 8 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VJ Central Avenue is a Others project by Vilas Javdekar Eco Homes in Kharadi, 411014, registered with MahaRERA as P52100050364 on 5 Apr 2023. Possession is promised by 31 Dec 2026. 674 of the 778 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameVJ Central Avenue
- TypeOthers
- Location
- Kharadi
- 411014
- Pincode411014
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100050364
- ReraGenie IDRG-MH-87420
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Apr 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed181 files
Current status
Figures as on 11 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing T5 | NA | 15 | 11 | 208 | 20 | 228 |
| Wing T6 | NA | 25 | 22 | 550 | 0 | 550 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.
Wing T588%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Wing T684%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 65% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 40% |
| Aggregate area of recreational Open Space | Yes | 20% |
| Open Parking | Yes | 0% |
Parking filed816
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Wing T5 | 223 | 0 | 223 |
| Wing T6 | 589 | 4 | 593 |
Land and ownership9
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Nagpal Landmarks | Hadapsar | Pune |
| Shrihari Ganpat Pathare | - | Pune |
| Prakash Shrihari Pathare | - | Pune |
| Arun Shrihari Pathare | - | Pune |
| Omkar Rajendra Pathare | - | Pune |
| Usha Rajendra Pathare | - | Pune |
| Atul Ratikant Pathare | - | Pune |
| Pritam Ratikant Pathare | - | Pune |
| Nagapal Landmark | Hadapsar | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing T6 | NA | Rs 61.13 cr | Rs 42.43 cr |
| Wing T5 | NA | Rs 28.48 cr | Rs 22.65 cr |
| - | NA | Rs 13.01 cr | Rs 11.34 cr |
Certifying professionals and partners10
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Surendra Gade |
| Architect | Deepali Patidar |
| Architect | AR Priya Honmute |
| Architect | Mukta Nachare |
| Architect | Sameer Murari Valimbe |
| Architect | Anuja Joshi |
| Engineer | Sagar Kale |
| Chartered Accountant | Sunil Shamrao Nimbalkar |
| Chartered Accountant | Patki & Soman |
| Chartered Accountant | Abhijit Mundada |
| Partner | Role in project |
|---|---|
| Vilas Javdekar Eco Homes | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1711/2024 | Civil Court Senior Division Pune | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000269666 | Rupali Meshram | Shreyas Kulkarni | 29/10/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed181
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 181 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate VJCA 30-06-2026.pdf | 11 Jul 2026 |
| Withdrawal Update Form 2File: Engineer Certificate VJCA 30-06-26.pdf | 11 Jul 2026 |
| Withdrawal Update Form 3File: CA certificate _VJCA_30-06-2026 - Updated.pdf | 11 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2 A VJCA Signed .pdf | 30 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate VJCA 1 31-03-26.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Engg certi_VJCA_31032026 Signed.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate VJCA 31-03-2026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Architect certificate VJCA 10-02-26.pdf | 6 Mar 2026 |
| Withdrawal Update Form 2File: Enginner certificate VJCA 10-02-26 .pdf | 6 Mar 2026 |
| Withdrawal Update Form 3File: CA Certificate VJCA 11-02-26compressed.pdf | 6 Mar 2026 |
| Withdrawal Update Form 1File: Architect Certificate VJCA 23-01-26.pdf | 25 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Certiifcate VJCA 23-01-26.pdf | 25 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate VJCA 24-01-26 Signed .pdf | 25 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate VJCA 31-12-25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate VJCA 31-12-25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: CA Certiifcate VJCA 31-12-25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate VJCA08-12-2025.pdf | 17 Dec 2025 |
| Withdrawal Update Form 2File: Engineer certificate VJCA 08-12-25.pdf | 17 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate VJCA 09-12-2025.pdf | 17 Dec 2025 |
| Withdrawal Update Form 1File: Architect Certificate VJCA 01-12-25.pdf | 16 Dec 2025 |
| Withdrawal Update Form 2File: Engineer Certificate VJCA 01-12-25.pdf | 16 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate VJ CA 01-12-25.pdf | 16 Dec 2025 |
| Withdrawal Update Form 1File: Architect Certificate VJCA 13-11-25.pdf | 12 Dec 2025 |
| Withdrawal Update Form 2File: Engineer Certificate VJCA 13-11-25.pdf | 12 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate VJCA 14-11-25.pdf | 12 Dec 2025 |
| Withdrawal Update Form 1File: Architect certificate VJCA 30-09-25.pdf | 11 Oct 2025 |
| Withdrawal Update Form 2File: Engineer certificate VJCA 30-09-25.pdf | 11 Oct 2025 |
| Withdrawal Update Form 3File: CA Certificate VJCA 30-09-25.pdf | 11 Oct 2025 |
| Form 5 (FY 2024-2025)File: VJEH_VJCA_SIGN.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: Architect certificate VJCA 16-09-25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 2File: Engineer certificate VJCA 15-09-25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 3File: CA Certificate VJCA 16-09-25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 1File: Architech certificate VJCA 24-08-25.pdf | 3 Sep 2025 |
| Withdrawal Update Form 2File: Engineer certificate VJCA 24-08-25.pdf | 3 Sep 2025 |
| Withdrawal Update Form 3File: CA certificate (Form 3)_VJCA_ Stamp u0026 Signed.pdf | 3 Sep 2025 |
| Withdrawal Update Form 1File: Architech certificate VJCA 16-07-25.pdf | 5 Aug 2025 |
| Withdrawal Update Form 2File: Engineer certificate VJCA 27-07-25.pdf | 5 Aug 2025 |
| Withdrawal Update Form 3File: CA Certificate VJCA 28-07-25.pdf | 5 Aug 2025 |
| Withdrawal Update Form 1File: Architech certificate VJCA 23-06-25.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: Engineer certificate VJCA 23-06-25.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: CA certificate-VJCA updated (1).pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: Architech certificate VJCA 23-06-25.pdf | 11 Jul 2025 |
| Withdrawal Update Form 2File: Engineer certificate VJCA 23-06-25.pdf | 11 Jul 2025 |
| Withdrawal Update Form 3File: CA certificate (Form 3)_VJCA_23062025_Signed.pdf | 11 Jul 2025 |
| Withdrawal Update Form 1File: Architech certificate VJCA 23-06-25.pdf | 30 Jun 2025 |
| Withdrawal Update Form 2File: Engineer certificate VJCA 23-06-25.pdf | 30 Jun 2025 |
| Withdrawal Update Form 3File: CA certificate (Form 3)_VJCA_23062025_Signed.pdf | 30 Jun 2025 |
| Form 2A (FY 2024-2025)File: VJCA_Form2A_31032025_Signed.pdf | 25 Jun 2025 |
| Proforma of Agreement for saleFile: ATS_T5_revised.pdf | 6 May 2025 |
| Proforma of Agreement for saleFile: ATS_T6_revised.pdf | 6 May 2025 |
| Form 1File: Architech certificate VJCA 31-3-25_Signed.pdf | 6 May 2025 |
| Form 2File: Engineer certificate VJCA 31-3-25- (1).pdf | 6 May 2025 |
| Form 3File: VJCA_CA_ 31032025_Signed.pdf | 6 May 2025 |
| Disclosure of Sold and Booked InventoryFile: VJCA_Sold Inventory_31032025_Signed.pdf | 6 May 2025 |
| OthersFile: VJCA_Form2A_31032025_Signed.pdf | 6 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: VJCA_Form2A_31032025_Signed.pdf | 26 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: VJCA_Sold Inventory_31032025_Signed.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate VJCA 31-3-25_Signed.pdf | 9 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate VJCA 31-3-25-.pdf | 4 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (Form 3)_VJCA_ Signed-.pdf | 3 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CA certificate VJCAsigned.pdf | 21 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate VJCA 20-03-25_signed.pdf | 21 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate VJCAsigned.pdf | 21 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate VJCA 20-03-25_signed.pdf | 21 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate VJCA.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate VJCA 24-02-25_signed.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner certificate VJCA 17-02-25_signed.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate VJCA.pdf | 18 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Encumberance letter Legal VJCA_signed.pdf | 14 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Encumberance letter Legal VJCA_signed.pdf | 14 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate -VJ Central Avenue_signed.pdf | 30 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate VJCA 28-01-25_signed.pdf | 30 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_VJCA_23-1-25signed.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate VJCA 21-01-25_signed.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate VJCA 12-01-25_signed.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - VJCA_signed13-01-25.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate VJCA 12-01-25_signed.pdf | 17 Jan 2025 |
| Declaration about Commencement CertificateFile: Declaration about cc VJCA 07022024_signed.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory VJCA_signed.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate VJCA 31-12-24_signed.pdf | 10 Jan 2025 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| YASH101P52100016807 | Sus, Pune | 101 | Jun 2018 | Completed | Mar 2021 | Jan 1970 |
| YashONE Phase - IP52100014585 | Pirangut Valley, Pune | 275 | Dec 2017 | Completed | Dec 2020 | Jan 1970 |
| Yashwin AP52100013149 | Sus, Pune | 100 | Sep 2017 | Completed | Sep 2020 | Jan 1970 |
| Yashwin E,F,GP52100000775 | Sus, Pune | 168 | Jul 2017 | Completed | Dec 2018 | Jan 1970 |
| Yashwin B, C, D | Village Sus Taluka Mulshi District Pune 411021 | 256 | - | Completed | Dec 2016 | Sep 2016 |
| Shivalaya | S no 22 1A City Survey no 664 Kothrud Pune | 8 | - | Completed | Jan 2015 | Jan 2015 |
| Palash | Wakad Taluka Mulshi District - Pune | 319 | - | Completed | Jun 2013 | Jun 2013 |
| Palash Plus | 200 2 200 2 1 Wakad Taluka - Mulshi District - Pune | 155 | - | Completed | Jan 2013 | Dec 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 181 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VJ Central Avenue on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kharadi
Filed coordinates, straight-line distance. 112 registered projects within 2 km.
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Unique Youtopia Phase III
Unique Associates
Builder: Vilas Javdekar Eco Homes
Vilas Javdekar Eco Homes has 11 registrations on MahaRERA, including Yashwin E,F,G and Yashwin A. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if VJ Central Avenue is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VJ Central Avenue?
The registered promoter entity is Vilas Javdekar Eco Homes, a partnership as per the filing. Its GSTIN 27AAEFV4570G1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VJ Central Avenue?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VJ Central Avenue?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VJ Central Avenue?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VJ Central Avenue?
The professionals named in the filing: Architect: Ar. Surendra Gade; Architect: Deepali Patidar; Architect: AR Priya Honmute; Architect: Mukta Nachare; Architect: Sameer Murari Valimbe; Architect: Anuja Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VJ Central Avenue?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback