ReraGenieLog inGet a buyer report

Home / Browse projects / NYATI ELYSIA IV

Completed No litigation declared Residential / Group Housing project

NYATI ELYSIA IV

By NITIN DWARKADAS NYATI

RG-MH-12842 · RERA P52100021738 · Last updated on MahaRERA portal: 7 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Sep 2023Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 142 documents Report an error

NYATI ELYSIA IV is a Residential / Group Housing project by NITIN DWARKADAS NYATI in KHARADI, 411014, registered with MahaRERA as P52100021738 on 22 Jul 2019. The registration is recorded completed; possession was promised by 30 Sep 2023.

At a glance

Project

  • NameNYATI ELYSIA IV
  • TypeResidential / Group Housing
  • Location
    • KHARADI
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100021738
  • ReraGenie IDRG-MH-12842

Builder

  • NameNITIN DWARKADAS NYATI
  • Entity typeIndividual
  • Other registrations11 more →
  • Completed10 of 12
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects11 →

Key dates

this monthRegisteredJul 2019PromisedSep 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Jul 2019
  • Promised completion30 Sep 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed142 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA360000
B3NA300000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

A1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28
BuildingClosed/CoveredTotal
A11616
B31212

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,423 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
NYATI BUILDERS PVT LTDPune (M Corp.)Pune

Approvals and building plan

Permissible FSI16598.67
Proposed, not sanctioned9,724 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWTC KHARADI PUNE

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShirish Dasnurkar and Associates
ArchitectSanjeev Mukund Mehta
EngineerJW Consultant LLP
Chartered AccountantChirag P. Shah & Co
Chartered AccountantVipin Gujarathi & Associates
PartnerRole in project
NITIN DWARKADAS NYATI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Apr 2023

Documents filed142

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 142 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Elysia IV - Form 5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Elysia IV - Form 5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf19 Mar 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Nyati Elysia IV.pdf20 Oct 2023
Proforma of Agreement for saleFile: Elysia IV Revised Unit Agreement 17042023.pdf17 Apr 2023
Proforma of Allotment letterFile: ELYSIA IV Allotment Letter 17042023.pdf17 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf4 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate.pdf4 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Nyati Elysia IV Form 5.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Elysia IV.pdf17 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 13 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 16 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 17 Form 1.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 001 Form 1.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 001 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 01 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 02 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 03 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 04 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 05 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 06 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 07 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 08 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 09 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 14 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 16 Engineer Certificate.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 17 Engineer Certificate.pdf16 Feb 2023
Certificates of CA (Form 3)File: 1 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 2 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 3 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 4 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 5 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 6 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 7 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 8 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 9 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 10 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 11 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 12 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 13 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 14 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 15 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 16 Form 3.pdf15 Feb 2023
Certificates of CA (Form 3)File: 17 Form 3.pdf15 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE ELYSIA IV Dec 2022.pdf30 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2A Engineer Certificate Dec 2022.pdf30 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Nyati Elysia IV.pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Nyati Elysia IV.pdf19 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Nyati Elysia IV.pdf17 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf25 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf25 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Elysia IV Form 2A.pdf7 Jan 2022
Layout approvalFile: Layout.pdf4 Jan 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf4 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf4 Jan 2022
Proforma of Allotment letterFile: ELYSIA IV UNIT AGREEON 22 FLOOR SANCT B3 BLDG (REVISED 29112021) CLEAN emailed.pdf29 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Nyati Elysia IV.pdf18 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf7 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf7 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf16 Jan 2021

Promoter's earlier projects10

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
NYATI ELITEP52100045651UNDRI VILLAGE, Pune-May 2022Certificate SignedJun 2024Jun 2024
NYATI ELYSIA VP52100027025KHARADI-Nov 2020Certificate SignedSep 2023Sep 2023
NYATI ELYSIA IIIP52100021737KHARADI-Jul 2019Certificate SignedMar 2023Mar 2023
NYATI ELYSIA IIP52100018643KHARADI-Nov 2018Certificate SignedMar 2023Mar 2023
NYATI ELYSIA IP52100000860KHARADI-Jul 2017Certificate SignedMar 2022Mar 2022
NYATI KALEIDOSCOPE IIP52100018178KHARADI-Oct 2018Certificate SignedMar 2019Mar 2019
NYATI KALEIDOSCOPE IP52100017920KHARADI-Sep 2018Certificate SignedMar 2019Mar 2019
Nyati Eternity IVUNDRI PUNE104-CompletedJan 2018Jan 2017
Nyati Eternity IIUNDRI PUNE195-CompletedDec 2016Late, Jan 2017
Nyati Eternity IUNDRI PUNE184-CompletedJun 2016Oct 2015

Keep NYATI ELYSIA IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHARADI

2 kmNYATI ELYSIA IVCompleted 4Lapsed / revoked 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: NITIN DWARKADAS NYATI

NITIN DWARKADAS NYATI has 12 registrations on MahaRERA, including NYATI ELYSIA I and NYATI ETERNITY COMMERCIAL I. Its filings disclose 11 earlier MahaRERA projects: declares 10 of 11 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if NYATI ELYSIA IV is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NYATI ELYSIA IV?

The registered promoter entity is NITIN DWARKADAS NYATI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NYATI ELYSIA IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NYATI ELYSIA IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NYATI ELYSIA IV?

The professionals named in the filing: Architect: Shirish Dasnurkar and Associates; Architect: Sanjeev Mukund Mehta; Engineer: JW Consultant LLP; Chartered Accountant: Chirag P. Shah & Co; Chartered Accountant: Vipin Gujarathi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NYATI ELYSIA IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NYATI ELYSIA IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NYATI ELYSIA IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.