Home / Browse projects / NYATI ELYSIA I

Completed No litigation declared Residential / Group Housing project

NYATI ELYSIA I

By NITIN DWARKADAS NYATI

RG-MH-09467 · RERA P52100000860 · Last updated on MahaRERA portal: 18 Nov 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Mar 2022Possession promisedregistration recorded completed
18 of 55Construction stages doneacross 5 buildings; furthest along: Sanitary Fittings within the flats /..., 99%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

NYATI ELYSIA I is a Residential / Group Housing project by NITIN DWARKADAS NYATI in KHARADI, 411014, registered with MahaRERA as P52100000860 on 23 Jul 2017. The registration is recorded completed; possession was promised by 30 Mar 2022.

At a glance

Project

  • NameNYATI ELYSIA I
  • TypeResidential / Group Housing
  • Location
    • KHARADI BY PASS
    • KHARADI
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000860
  • ReraGenie IDRG-MH-09467

Builder

  • NameNITIN DWARKADAS NYATI
  • Entity typeIndividual
  • Other registrations11 more →
  • Completed10 of 12
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects11 →

Key dates

this monthRegisteredJul 2017PromisedMar 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jul 2017
  • Promised completion30 Mar 2022
  • Revised completionNone
  • Buildings5 building records
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A2NA360000
B1NA360000
B2NA360000
C1NA360000
D1NA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 18 Nov 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 99%.

A283%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)86%
Plinth100%
Stilt Floor0%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.93%
B187%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)83%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises94%
Sanitary Fittings within the flats / premises99%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.93%
B285%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)83%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks88%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.81%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.93%
C186%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)83%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises94%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.93%
D171%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities22

As on 18 Nov 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes75%
Street LightingYes70%
Community BuildingsYes85%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes75%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes75%
Open ParkingYes45%
SWIMMING POOLYes85%
SOCIETY OFFICEYes55%
Outside PremisesYes90%
MULTIPURPOSE HALLYes85%
Main Gate Security CabinYes75%
GAS NETWORKING ONLYYes30%
FOUNTAINYes0%

Parking filed63

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots63
Closed/Covered63
BuildingClosed/CoveredTotal
A21616
B11212
B21212
C11313
D11010

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area19,533 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
NYATI BUILDERS PRIVATE LIMITEDPune (M Corp.)Pune

Approvals and building plan

Permissible FSI36989.8
Proposed, not sanctioned36,911 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCamp Pune 411001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShirish Dasnurkar & Associates
ArchitectSanjeev Mukund Mehta
EngineerJW Consultant LLP
Chartered AccountantVipin Gujarathi & Associates
Chartered AccountantChirag P. Shah & Co
PartnerRole in project
NITIN DWARKADAS NYATI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Sep 2021

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 5)File: Nyati Elysia I.pdf18 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate Part 1.pdf20 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate Part 2.pdf20 Sep 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf20 Sep 2021
Proforma of Allotment letterFile: ELYSIA I REVISED UNIT AGREE ON FULL OC 170921 clean.pdf17 Sep 2021
PAN CardFile: PAN NITIN NYATI.pdf13 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Nyati Elysia I A2 Hera.pdf13 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Nyati Elysia I B1 Helios.pdf13 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Nyati Elysia I B2 Selene.pdf13 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Nyati Elysia I C1 Artemis.pdf13 Jul 2021
Certificates of CA (Form 5)File: Nyati Elysia I.pdf30 Sep 2020
Proforma of Allotment letterFile: NYATI ELYSIA I - REVISED UNIT AGREE 08072020 (CLEAN).pdf9 Jul 2020
Proforma of Allotment letterFile: NYATI ELYSIA I UNIT AGREE RERA 280918 REVISED 241219.pdf26 Dec 2019
Layout approvalFile: Sanction Layout.pdf21 Nov 2019
Copy of Layout Approval (in case of layout)File: Sanction Layout.pdf21 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencment Certificate.pdf21 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nyati Elysia I.pdf20 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nyati Elysia I.pdf20 Nov 2019
Certificates of CA (Form 5)File: Elysia I_opt.pdf19 Sep 2019
Proforma of Allotment letterFile: NYATI ELYSIA I UNIT AGREE RERA.pdf23 Jan 2019
Certificates of CA (Form 5)File: Nyati Elysia I.pdf6 Dec 2018
Certificates of CA (Form 5)File: Nyati Elysia I.pdf6 Dec 2018
Details of encumbrancesFile: Index II - Deed of Mortgage - 13857-2018.pdf13 Nov 2018
Copy of the legal title reportFile: Title Certificate Plot A Nyati Elysia.pdf8 Oct 2018
Copy of the legal title reportFile: Addendum.pdf8 Oct 2018
OtherFile: INDEX II Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 1-10 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 11-20 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 21-30 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 31-40 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 41-50 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 51-60 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 61-70 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 71-80 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 81-90 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 91-100 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 101-110 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 111-120 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 121-130 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 131-141 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 141-150 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 151-160 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 161-170 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 171-180 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Page 181-192 Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
OtherFile: Pavati Deed of Mortgage Cum Loan Agreement 13857 - 2018.pdf26 Sep 2018
Proforma of Allotment letterFile: NYATI ELYSIA I - UNIT AGREEMENT UNDER RERA REVISED ON SANCTION OF ALL FLOORS 190518.pdf22 May 2018
Layout approvalFile: Sanction Layout.pdf21 May 2018
Copy of Layout Approval (in case of layout)File: Sanction Layout.pdf21 May 2018
Commencement Certificates / NA Order for plotted developmentFile: Commenecment Certificate.pdf21 May 2018
Proforma of Allotment letterFile: NYATI ELYSIA I - UNIT AGREEMENT UNDER RERA 190518.pdf21 May 2018
Layout approvalFile: sanction layout111.pdf13 Apr 2018
Copy of Layout Approval (in case of layout)File: sanction layout111.pdf13 Apr 2018
Layout approvalFile: Nyati Elysia I Revised sanction.pdf11 Oct 2017
Copy of Layout Approval (in case of layout)File: Nyati Elysia I Revised sanction.pdf11 Oct 2017
Proforma of Allotment letterFile: NYATI ELYSIA I - REVISED ALLOTMENT LETTER AND UNIT AGREEMENT.pdf13 Sep 2017
Certificates of CA (Form 3)File: CA Certificate-Elysia I.pdf31 Jul 2017
Building plan approvalFile: Sanction DP layout Elysia.pdf17 Jul 2017
Copy of the legal title reportFile: TITLE REPORT.pdf17 Jul 2017
Building Plan Approval (IOD)File: Sanction DP layout Elysia.pdf17 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nyati Elysia I Arch Certificate.pdf17 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Elysia - Engineer Certificate.pdf17 Jul 2017
Proforma of Allotment letterFile: NYATI ELYSIA I - ALLOTMENT LETTER UNIT AGREEMENT UNDER RERA-min.pdf17 Jul 2017
Layout approvalFile: Sanction DP Layout Elysia.pdf16 Jul 2017
Layout approvalFile: Revised Submission Layout Elysia.pdf16 Jul 2017
Copy of Layout Approval (in case of layout)File: Sanction DP Layout Elysia.pdf16 Jul 2017
Copy of Layout Approval (in case of layout)File: Revised Submission Layout Elysia.pdf16 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: document 1.pdf16 Jul 2017
Certificates of CA (Form 3)File: Form-3 Nyati Elysia.pdf16 Jul 2017
Details of encumbrancesFile: RTS Apeal No 767-2016.pdf15 Jul 2017
Declaration in FORM BFile: FORM `B` NYATI HOUSING.pdf15 Jul 2017

Promoter's earlier projects10

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
NYATI ELITEP52100045651UNDRI VILLAGE, Pune-May 2022Certificate SignedJun 2024Jun 2024
NYATI ELYSIA VP52100027025KHARADI-Nov 2020Certificate SignedSep 2023Sep 2023
NYATI ELYSIA IVP52100021738KHARADI-Jul 2019Certificate SignedSep 2023Sep 2023
NYATI ELYSIA IIIP52100021737KHARADI-Jul 2019Certificate SignedMar 2023Mar 2023
NYATI ELYSIA IIP52100018643KHARADI-Nov 2018Certificate SignedMar 2023Mar 2023
NYATI KALEIDOSCOPE IIP52100018178KHARADI-Oct 2018Certificate SignedMar 2019Mar 2019
NYATI KALEIDOSCOPE IP52100017920KHARADI-Sep 2018Certificate SignedMar 2019Mar 2019
Nyati Eternity IVUNDRI PUNE104-CompletedJan 2018Jan 2017
Nyati Eternity IIUNDRI PUNE195-CompletedDec 2016Late, Jan 2017
Nyati Eternity IUNDRI PUNE184-CompletedJun 2016Oct 2015

Keep NYATI ELYSIA I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHARADI

2 kmNYATI ELYSIA ICompleted 36Lapsed / revoked 25Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 98 registered projects within 2 km.

Builder: NITIN DWARKADAS NYATI

NITIN DWARKADAS NYATI has 12 registrations on MahaRERA, including NYATI ELYSIA I and NYATI ETERNITY COMMERCIAL I. Its filings disclose 11 earlier MahaRERA projects: declares 10 of 11 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if NYATI ELYSIA I is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NYATI ELYSIA I?

The registered promoter entity is NITIN DWARKADAS NYATI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NYATI ELYSIA I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NYATI ELYSIA I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NYATI ELYSIA I?

The professionals named in the filing: Architect: Shirish Dasnurkar & Associates; Architect: Sanjeev Mukund Mehta; Engineer: JW Consultant LLP; Chartered Accountant: Vipin Gujarathi & Associates; Chartered Accountant: Chirag P. Shah & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NYATI ELYSIA I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NYATI ELYSIA I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NYATI ELYSIA I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.