NYATI ELITE
RG-MH-71794 · RERA P52100045651 · Last updated on MahaRERA portal: 7 Oct 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NYATI ELITE is a Residential / Group Housing project by NITIN DWARKADAS NYATI in Pune, Maharashtra, registered with MahaRERA as P52100045651 on 26 May 2022. The registration is recorded completed; possession was promised by 30 Jun 2024.
At a glance
Project
- NameNYATI ELITE
- TypeResidential / Group Housing
- Location
- MOHAMMADWADI UNDRI ROAD
- UNDRI VILLAGE
- UNDRI
- Haveli
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045651
- ReraGenie IDRG-MH-71794
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on26 May 2022
- Promised completion30 Jun 2024
- Revised completionNone
- Buildings7 building records
- Documents filed61 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 8 | 0 | 0 | 0 | 0 |
| WING B | NA | 8 | 0 | 0 | 0 | 0 |
| WING C | NA | 8 | 0 | 0 | 0 | 0 |
| WING D | NA | 8 | 0 | 0 | 0 | 0 |
| WING E | NA | 8 | 0 | 0 | 0 | 0 |
| WING F | NA | 8 | 0 | 0 | 0 | 0 |
| WING G | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
35 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Staircases, at 95%.
WING A84%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 82% |
| Sanitary Fittings within the flats / premises | 72% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 92% |
WING B83%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 83% |
| Sanitary Fittings within the flats / premises | 79% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 86% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
WING C84%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 87% |
| Sanitary Fittings within the flats / premises | 81% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 91% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 88% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 82% |
WING D85%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 82% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 93% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
WING E85%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 91% |
| Sanitary Fittings within the flats / premises | 82% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
WING F85%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 87% |
| Sanitary Fittings within the flats / premises | 81% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 93% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 94% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
WING G83%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 83% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 89% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 84% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 92% |
Progress on shared amenities15
As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 63% |
| Water Supply | Yes | 66% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 46% |
| Landscaping & Tree Planting | Yes | 83% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 58% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 32% |
| Water conservation /Rain water harvesting | Yes | 76% |
| Energy managemcnt | Yes | 95% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed134
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 22 | 22 |
| WING B | 20 | 20 |
| WING C | 21 | 21 |
| WING D | 21 | 21 |
| WING E | 18 | 18 |
| WING F | 12 | 12 |
| WING G | 20 | 20 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shirish Dasnurkar & Associates |
| Architect | Sanjeev Mukund Mehta |
| Engineer | JW Consultant LLP |
| Chartered Accountant | Kushal D Jain |
| Partner | Role in project |
|---|---|
| NITIN DWARKADAS NYATI | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 105/2019 | NATIONAL GREEN TRIBUNAL WESTERN ZONE BENCH PUNE | HEARING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Jun 2024
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Elite - Form 5.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Elite - Form 5.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.PDF | 17 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 12 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 12 Jul 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 29 Jun 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Completion Certificate.pdf | 28 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 18 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 11 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nyati Housing Form 3 - Elite_11zon.pdf | 11 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 8 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 3 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVERTORY.pdf | 16 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Nyati Elite.pdf | 30 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 5 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 25 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 25 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 28 Oct 2022 |
| Proforma of Allotment letterFile: ELITE UNIT AGREEMENT 300522 revised 130722.pdf | 14 Jul 2022 |
| Proforma of Allotment letterFile: ELITE UNIT AGREEMENT UPLOAD REVISED 300522 FINAL FOR EXECUTION.pdf | 15 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: BP CC.pdf | 21 May 2022 |
| Layout approvalFile: BP Phase Layout.pdf | 13 May 2022 |
| Layout approvalFile: DP Phase Layout.pdf | 13 May 2022 |
| Building plan approvalFile: Wing A.pdf | 13 May 2022 |
| Building plan approvalFile: Wing B.pdf | 13 May 2022 |
| Building plan approvalFile: Wing C.pdf | 13 May 2022 |
| Building plan approvalFile: Wing D.pdf | 13 May 2022 |
| Building plan approvalFile: Wing E.pdf | 13 May 2022 |
| Building plan approvalFile: Wing F.pdf | 13 May 2022 |
| Building plan approvalFile: Wing G.pdf | 13 May 2022 |
| Building plan approvalFile: Club House.pdf | 13 May 2022 |
| PAN CardFile: PAN NITIN NYATI.pdf | 13 May 2022 |
| Details of encumbrancesFile: Encumbrance Details.pdf | 13 May 2022 |
| Copy of Layout Approval (in case of layout)File: BP Phase Layout.pdf | 13 May 2022 |
| Copy of Layout Approval (in case of layout)File: DP Phase Layout.pdf | 13 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing A.pdf | 13 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing B.pdf | 13 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing C.pdf | 13 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing D.pdf | 13 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing E.pdf | 13 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing F.pdf | 13 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing G.pdf | 13 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Club House.pdf | 13 May 2022 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 13 May 2022 |
| Declaration in FORM BFile: Form B.pdf | 13 May 2022 |
| CERSAI detailsFile: Cersai Undertaking.pdf | 13 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 13 May 2022 |
| Proforma of Allotment letterFile: DRAFT NYATI ELITE UNIT AGREEMENT 13052022.pdf | 13 May 2022 |
| Copy of the legal title reportFile: Legal Title Report 25042022.pdf | 12 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certficate.pdf | 12 May 2022 |
| CERSAI detailsFile: CERSAI Report.pdf | 12 May 2022 |
Promoter's earlier projects10
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| NYATI ELYSIA VP52100027025 | KHARADI | - | Nov 2020 | Certificate Signed | Sep 2023 | Sep 2023 |
| NYATI ELYSIA IVP52100021738 | KHARADI | - | Jul 2019 | Certificate Signed | Sep 2023 | Sep 2023 |
| NYATI ELYSIA IIIP52100021737 | KHARADI | - | Jul 2019 | Certificate Signed | Mar 2023 | Mar 2023 |
| NYATI ELYSIA IIP52100018643 | KHARADI | - | Nov 2018 | Certificate Signed | Mar 2023 | Mar 2023 |
| NYATI ELYSIA IP52100000860 | KHARADI | - | Jul 2017 | Certificate Signed | Mar 2022 | Mar 2022 |
| NYATI KALEIDOSCOPE IIP52100018178 | KHARADI | - | Oct 2018 | Certificate Signed | Mar 2019 | Mar 2019 |
| NYATI KALEIDOSCOPE IP52100017920 | KHARADI | - | Sep 2018 | Certificate Signed | Mar 2019 | Mar 2019 |
| Nyati Eternity IV | UNDRI PUNE | 104 | - | Completed | Jan 2018 | Jan 2017 |
| Nyati Eternity II | UNDRI PUNE | 195 | - | Completed | Dec 2016 | Late, Jan 2017 |
| Nyati Eternity I | UNDRI PUNE | 184 | - | Completed | Jun 2016 | Oct 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 11 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 61 filed documents as one ZIP, foldered, with a manifest
Keep NYATI ELITE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near UNDRI VILLAGE13,700+ in Pune
Filed coordinates, straight-line distance. 177 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: NITIN DWARKADAS NYATI
NITIN DWARKADAS NYATI has 12 registrations on MahaRERA, including NYATI ELYSIA I and NYATI ETERNITY COMMERCIAL I. Its filings disclose 11 earlier MahaRERA projects: declares 10 of 11 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if NYATI ELITE is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NYATI ELITE?
The registered promoter entity is NITIN DWARKADAS NYATI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NYATI ELITE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NYATI ELITE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NYATI ELITE?
The professionals named in the filing: Architect: Shirish Dasnurkar & Associates; Architect: Sanjeev Mukund Mehta; Engineer: JW Consultant LLP; Chartered Accountant: Kushal D Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NYATI ELITE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.