Home / Browse projects / Satara, Maharashtra / NIVAAN HILLS
NIVAAN HILLS
RG-MH-49193 · RERA P52700045650 · Last updated on MahaRERA portal: 30 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 26 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NIVAAN HILLS is a Plotted project by Vishal Ashok Chugera in Satara, Maharashtra, registered with MahaRERA as P52700045650 on 26 May 2022. Possession is promised by 30 Jun 2027. The completion date has moved by 26 months from the original filing. 27 of the 35 units on this registration are recorded sold or booked. 2 complaints are on record with the regulator.
At a glance
Project
- NameNIVAAN HILLS
- TypePlotted
- Location
- Kuroshi
- Mahabaleshwar
- Satara
- 412806
- Pincode412806
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700045650
- ReraGenie IDRG-MH-49193
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 May 2022
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 30 Apr 2025)
- BuildingsNot stated in filing
- Documents filed80 files
Current status
Figures as on 30 Dec 2025, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 30 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 40% |
| Street Lighting | Yes | 35% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 35% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 6.00 cr | Rs 4.83 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Prashant Kadam Kadam |
| Architect | Nilesh Chorghade |
| Architect | Mohd Abu Bakkar |
| Engineer | Vikas Phadtare |
| Engineer | Vishal Hole |
| Chartered Accountant | CA Priyesh Jain Jain |
| Chartered Accountant | CA Chetan Chaudhary |
| Chartered Accountant | nilesh raut |
| Partner | Role in project |
|---|---|
| Vishal Ashok Chugera | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe delay in the completion of the real estate project has been primarily caused by: • Non-cooperation and constant hindrance to development work of common amenities by individual buyers. • Constant increase in demand for increase/rework of common amenities by buyers by forming groups and stopping development work. • Constant damage to common amenities which is caused due to negligence while constructing bungalow/row house on the individual plots by the buyers. Hence, compelling us to do multiple re-work/repairs of the same. For the Further Course of Action, we are going to: • Repair and renov
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000290211 | Kedar Ashok Bhat | Vishal Chugera | 27/01/2024 |
| CC12504198 | Rajesh Shet | Vishal Ashok Chugera | 27/11/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architect Certificate 30092025.pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 -Engineer Certificate 30062025.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: Form-3 CA Certificate 30092025.pdf | 30 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate 30062025.pdf | 8 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 -Engineer Certificate 30062025.pdf | 8 Oct 2025 |
| Withdrawal Update Form 3File: Form-3 CA Certificate 30062025.pdf | 8 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 30062022.pdf | 6 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate 30062022.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 30062022.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062022.pdf | 6 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 30092022.pdf | 6 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate 30092022.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 30092022.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092022.pdf | 6 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 31122022.pdf | 6 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate 31122022.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 31122022.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122022.pdf | 6 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 31032023.pdf | 6 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate 31032023.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 31032023.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032023.pdf | 6 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 30062023.pdf | 6 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate 30062023.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 30062023.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062023.pdf | 6 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 30092023.pdf | 6 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate 30092023.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 30092023.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092023.pdf | 6 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 31122023.pdf | 6 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate 31122023.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 31122023.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122023.pdf | 6 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 31032024.pdf | 6 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate 31032024.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 31032024.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032024.pdf | 6 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 30062024.pdf | 6 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate 30062024.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 30062024.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062024.pdf | 6 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 30092024.pdf | 6 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate 30092024.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 30092024.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092024.pdf | 6 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 31122024.pdf | 6 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate 31122024.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 31122024.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122024.pdf | 6 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 31032025.pdf | 6 Oct 2025 |
| Form 2File: Form 2 Engineer Certificate 31032025.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 31032025.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032025.pdf | 6 Oct 2025 |
| Form 1File: Form 1 Architect Certificate 30062025.pdf | 6 Oct 2025 |
| Form 2File: Form 2 -Engineer Certificate 30062025.pdf | 6 Oct 2025 |
| Form 3File: Form-3 CA Certificate 30062025.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31062025.pdf | 6 Oct 2025 |
| Form 2A (FY 2022-2023)File: Form - 2A - 31032023.pdf | 6 Oct 2025 |
| Form 2A (FY 2023-2024)File: Form - 2A - 31032024.pdf | 6 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form - 2A - 31032025.pdf | 6 Oct 2025 |
| Form 5 (FY 2022-2023)File: Form 5 - 01042022 to 31032023.pdf | 6 Oct 2025 |
| Form 5 (FY 2023-2024)File: Form 5 - 01042023 to 31032024.pdf | 6 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - 01042024 to 31032025.pdf | 6 Oct 2025 |
| Proforma of Allotment letterFile: Agreement To Sale - Nivaan Hills.pdf | 20 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 19 May 2022 |
| Layout approvalFile: Layout Approval.pdf | 18 May 2022 |
| Building plan approval or NA orderFile: NA Order v1.pdf | 18 May 2022 |
| PAN CardFile: Vishal Chugera PAN Card.pdf | 18 May 2022 |
| Copy of the legal title reportFile: RERA Serach and Title v2.pdf | 18 May 2022 |
| Details of encumbrancesFile: No Encumbrance Certificate -Nivaan Hills.pdf | 18 May 2022 |
| Copy of Layout Approval (in case of layout)File: Layout Approval.pdf | 18 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: NA Order v1.pdf | 18 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order v1.pdf | 18 May 2022 |
| Declaration about Commencement CertificateFile: Declaration abt Commencement Certificate.pdf | 18 May 2022 |
| Declaration in FORM BFile: Form-B Promotor - 1 - Vishal Chugera Nivaan Hills.pdf | 18 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate NH 02052022.pdf | 18 May 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200237579057_For_Asset_Based_Search_18_05_2022_16_09_29_904.pdf | 18 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 18 May 2022 |
| Proforma of Allotment letterFile: Allotment Letter-Nivaan Hills.pdf | 18 May 2022 |
Promoter's earlier projects9
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Nivaan Water Edge Phase-IIP52100056090 | Wagholi, Pune | 16 | May 2024 | Ongoing | Mar 2029 | Not due yet |
| Nivaan Sparsh Phase-1P52100052594 | Mauje Theur, Pune | 150 | Sep 2023 | Ongoing | Jun 2027 | Not due yet |
| Nivaan LegacyP52100051661 | Bakori, Pune | 24 | Jun 2023 | Ongoing | May 2027 | Not due yet |
| Nivaan MedowsP52100020464 | Kesnand Pune, Pune | 141 | Apr 2019 | Ongoing | Dec 2026Registered original: Oct 2019 | Not due yet |
| NIVAAN NIRVANAP52100017866 | SASWAD SUPE KHURD, Pune | 253 | Sep 2018 | Ongoing | Dec 2026Registered original: Dec 2024 | Not due yet |
| NIVAAN MEADOWSP52100023936 | KESNAND, Pune | 253 | Jan 2020 | Ongoing | Dec 2026Registered original: Dec 2022 | Not due yet |
| Fire FlyP52100002615 | Shiraswadi, Pune | 96 | Aug 2017 | Ongoing | Sep 2025Registered original: Mar 2021 | Not delivered |
| Nivaan GrandeurP52100032610 | Bakori, Pune | 234 | Jan 2022 | Ongoing | May 2025 | Not delivered |
| Shanti Construction | GAT No 1637 Sai shanti phase 1 Ramdara Loni Kalbhor Pune 412201 | 152 | - | Completed | Sep 2015 | Aug 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NIVAAN HILLS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kuroshi1,100+ in Satara
Filed coordinates, straight-line distance. 122 registered projects within 2 km.
Mango Lakefront Tapola Phase 1
MV TAPOLA PRIVATE LIMITED
Mango Lakefront Tapola Phase 2
MV TAPOLA PRIVATE LIMITED
MAHARAJA VALLEY
NITIN BALKRISHNA BALKRISHNA GYANU BABAR
Strawberry Hills
Navnath Developers
RutuGandh Mahabaleshwar-1
Hi-Tek Vyas Developers LLP
RutuGandh Mahabaleshwar-2
Hi-Tek Vyas Developers LLP
See every Satara project, with the district possession charts
Builder: Vishal Ashok Chugera
VISHAL ASHOK CHUGERA has 10 registrations on MahaRERA, including Fire Fly and KRISH VILLAS. Its filings disclose 13 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if NIVAAN HILLS is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NIVAAN HILLS?
The registered promoter entity is Vishal Ashok Chugera, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NIVAAN HILLS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NIVAAN HILLS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NIVAAN HILLS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NIVAAN HILLS?
The professionals named in the filing: Architect: Prashant Kadam Kadam; Architect: Nilesh Chorghade; Architect: Mohd Abu Bakkar; Engineer: Vikas Phadtare; Engineer: Vishal Hole; Chartered Accountant: CA Priyesh Jain Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NIVAAN HILLS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.