Home / Browse projects / Satara, Maharashtra / RutuGandh Mahabaleshwar-1
RutuGandh Mahabaleshwar-1
RG-MH-14684 · RERA P52700023105 · Last updated on MahaRERA portal: 12 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 66 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RutuGandh Mahabaleshwar-1 is a Residential / Group Housing project by Hi-Tek Vyas Developers LLP in Satara, Maharashtra, registered with MahaRERA as P52700023105 on 2 Dec 2019. Possession is promised by 30 Jun 2028. The completion date has moved by 66 months from the original filing. 0 of the 9 units on this registration are recorded sold or booked, and 28 of 99 construction stages are filed complete.
At a glance
Project
- NameRutuGandh Mahabaleshwar-1
- TypeResidential / Group Housing
- Location
- Main Dist. Road 26
- Near Govind Ban
- Gogave
- Mahabaleshwar
- Satara
- 412806
- Pincode412806
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700023105
- ReraGenie IDRG-MH-14684
Builder
- NameHi-Tek Vyas Developers LLP
- Entity typePartnership
- Authorized SignatoryShripad Murlidhar Vyas
- PartnerMahesh Pundalik Nevarekar
- Other registrations2 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Dec 2019
- Promised completion30 Jun 2028
- Revised completionRevised to 30 Jun 2028 (originally 30 Dec 2022)
- Buildings9 building records
- Documents filed82 files
Current status
Figures as on 12 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 09 | NA | 3 | 2 | 1 | 0 | 1 |
| 01 | NA | 3 | 2 | 1 | 0 | 1 |
| 02 | NA | 3 | 2 | 1 | 0 | 1 |
| 03 | NA | 3 | 2 | 1 | 0 | 1 |
| 04 | NA | 3 | 2 | 1 | 0 | 1 |
| 05 | NA | 3 | 2 | 1 | 0 | 1 |
| 06 | NA | 3 | 2 | 1 | 0 | 1 |
| 07 | NA | 3 | 2 | 1 | 0 | 1 |
| 08 | NA | 3 | 2 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building9
As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
28 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Internal walls, at 80%.
090%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
0134%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
0234%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
0334%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
0434%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
0560%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
0653%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
0753%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
0860%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 20% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 75% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed45
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| 09 | 5 | 5 |
| 01 | 5 | 5 |
| 02 | 5 | 5 |
| 03 | 5 | 5 |
| 04 | 5 | 5 |
| 05 | 5 | 5 |
| 06 | 5 | 5 |
| 07 | 5 | 5 |
| 08 | 5 | 5 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Hi-Tek Vyas Developers LLP | Peth | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 8.27 cr | Rs 2.96 cr |
| 04 | NA | Rs 1.05 cr | Rs 36.78 lakh |
| 05 | NA | Rs 1.05 cr | Rs 71.30 lakh |
| 06 | NA | Rs 99.58 lakh | Rs 67.73 lakh |
| 07 | NA | Rs 99.58 lakh | Rs 67.73 lakh |
| 02 | NA | Rs 89.03 lakh | Rs 31.16 lakh |
| 03 | NA | Rs 89.03 lakh | Rs 31.16 lakh |
| 01 | NA | Rs 88.19 lakh | Rs 30.87 lakh |
| 08 | NA | Rs 88.19 lakh | Rs 60.33 lakh |
| 09 | NA | Rs 62.44 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar D S Joglekar Joglekar |
| Engineer | Er Rakesh Jain |
| Engineer | DEVASHISH B PATIL |
| Chartered Accountant | Abhijit Kolapkar |
| Chartered Accountant | Jayant Kolapkar |
| Partner | Role in project |
|---|---|
| Hi-Tek Vyas Developers LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNON AVAILABILITY OF RAW MATERIAL AND LABOUR DUE TO COVID 19 PANDEMIC.
Reason as filed by the promoterDue to in sufficiency and constraints of funds, we need extended time for completion of project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Oct 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Oct 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Oct 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2028
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 12 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 12 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 12 Aug 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 16 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 16 May 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 16 May 2026 |
| Withdrawal Update Form 1File: FORM-1 Arch certificate Rutu-1.pdf | 23 Jan 2026 |
| Withdrawal Update Form 2File: FORM-2 Engineer.pdf | 23 Jan 2026 |
| Withdrawal Update Form 3File: CA form 3 Rutu-1.pdf | 23 Jan 2026 |
| Withdrawal Update Form 1File: Archi certificate Rutu 1 updated.pdf | 6 Dec 2025 |
| Withdrawal Update Form 2File: Engineer certificate 1.pdf | 6 Dec 2025 |
| Withdrawal Update Form 3File: form 3- rutuganda mghabaleshwar-1.pdf | 6 Dec 2025 |
| Layout approvalFile: Layout 01_11zon.pdf | 1 Oct 2025 |
| Building plan approvalFile: Plan 02.pdf | 1 Oct 2025 |
| Building plan approvalFile: Plan 03.pdf | 1 Oct 2025 |
| Building plan approvalFile: Plan 04.pdf | 1 Oct 2025 |
| Withdrawal Update Form 1File: Architects certificate.pdf | 17 Sep 2025 |
| Withdrawal Update Form 2File: Engineeru0027s certificate.pdf | 17 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 Rutu 01.pdf | 17 Sep 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Rutu 1.pdf | 18 Jun 2025 |
| Form 1File: Form 1 Rutu 1.pdf | 9 Jun 2025 |
| Form 2File: Form 2 Rutu 1.pdf | 9 Jun 2025 |
| Form 3File: Form 3 Rutu 1.pdf | 9 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Rutu 1.pdf | 9 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Form 1 Rutu 1.pdf | 9 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate Rutu Maha 1.pdf | 4 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate rutu maha 1.pdf | 4 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Rutu Maha 1.pdf | 4 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rutugandh 01.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Cert-Rutu Mah-1.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate rutugandh maha 1.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold inventory-Rutu Mah-1.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: RUTUGANDH MAHABALESHWAR - 1 (4).pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RUTUGANDH MAHABALESHWAR - 1 (1).pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Phase 1.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cerficate ph 1.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE PHASE 1.pdf | 16 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: engineers cert from 2a.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase 1 Arch Certificate.pdf | 15 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DOC006.PDF | 29 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch cert rutu maha-1.pdf | 11 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engr cert rutu maha-1.pdf | 11 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory rutu maha -1.pdf | 11 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: rutugandh 1 20240121031630.pdf | 29 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 1sep.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 1sep.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: sold 1sep.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1_1 .pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory.pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-2023 Project 1.pdf | 12 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2023 Project 1.pdf | 12 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Rutugandh Mahabaleshwar - 1_removed.pdf | 12 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Rutugandh Mahabaleshwar - 1_removed.pdf | 12 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-06-2023 Project 1_compressed.pdf | 12 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-2023 Project -1.pdf | 12 Sep 2023 |
| Declaration about Commencement CertificateFile: Commencement declaration FORM-D.pdf | 29 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate.pdf | 29 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Egineer certificate_compressed.pdf | 29 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A quality assurance 2019-2020 RM1_compressed.pdf | 29 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality assurance 2020-2021 RM 1_compressed.pdf | 29 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Quality assurance 2021-2022 RM 1_compressed.pdf | 29 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Discolsure Of Inventory-RM 1.pdf | 29 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate 30-11-2022_compressed.pdf | 29 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-2021_compressed.pdf | 29 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-2022_compressed.pdf | 29 Dec 2022 |
| Layout approvalFile: 4a (104) Approved Layout NA.PDF | 7 Nov 2019 |
| Layout approvalFile: 4b (104) Approved NA Dwg with stamp.pdf | 7 Nov 2019 |
| Details of encumbrancesFile: 3 Encumbrances NA (104).pdf | 7 Nov 2019 |
| Copy of Layout Approval (in case of layout)File: 4a (104) Approved Layout NA.PDF | 7 Nov 2019 |
| Copy of Layout Approval (in case of layout)File: 4b (104) Approved NA Dwg with stamp.pdf | 7 Nov 2019 |
| Declaration in FORM BFile: 7 (104-1) Form B Signed Diclaration.pdf | 7 Nov 2019 |
| Building plan approvalFile: 5 (104) Approved NA Dwg with stamp.pdf | 31 Oct 2019 |
| PAN CardFile: 1 Hi-Tek Vyas Dev LLP PanCard.pdf | 31 Oct 2019 |
| Copy of the legal title reportFile: 2a (104) Title Report.pdf | 31 Oct 2019 |
| Copy of the legal title reportFile: 2b (104) Title Certificate.pdf | 31 Oct 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 (104) Approved NA Dwg with stamp.pdf | 31 Oct 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: 6 (104) Approved NA Order (6 Pages).pdf | 31 Oct 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 RERA Form-1 Architect Certificate 104-1.pdf | 31 Oct 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 RERA Form-2 Engineer Certificate 104-1.pdf | 31 Oct 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 RERA Form-3 CA Certificate 104-1.pdf | 31 Oct 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RutuGandh Mahabaleshwar-1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near Govind Ban1,100+ in Satara
Filed coordinates, straight-line distance. 40 registered projects within 2 km.
Mango Lakefront Tapola Phase 1
MV TAPOLA PRIVATE LIMITED
Mango Lakefront Tapola Phase 2
MV TAPOLA PRIVATE LIMITED
MAHARAJA VALLEY
NITIN BALKRISHNA BALKRISHNA GYANU BABAR
NIVAAN HILLS
Vishal Ashok Chugera
Strawberry Hills
Navnath Developers
RutuGandh Mahabaleshwar-2
Hi-Tek Vyas Developers LLP
See every Satara project, with the district possession charts
Builder: Hi-Tek Vyas Developers LLP
Hi-Tek Vyas Developers LLP has 3 registrations on MahaRERA, including RutuGandh Mahabaleshwar-1 and RutuGandh Mahabaleshwar-2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if RutuGandh Mahabaleshwar-1 is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RutuGandh Mahabaleshwar-1?
The registered promoter entity is Hi-Tek Vyas Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RutuGandh Mahabaleshwar-1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RutuGandh Mahabaleshwar-1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RutuGandh Mahabaleshwar-1?
The professionals named in the filing: Architect: Ar D S Joglekar Joglekar; Engineer: Er Rakesh Jain; Engineer: DEVASHISH B PATIL; Chartered Accountant: Abhijit Kolapkar; Chartered Accountant: Jayant Kolapkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RutuGandh Mahabaleshwar-1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback