Home / Browse projects / Satara, Maharashtra / Mango Lakefront Tapola Phase 1

Registered No litigation declared Residential / Group Housing project

Mango Lakefront Tapola Phase 1

By MV TAPOLA PRIVATE LIMITED

RG-MH-23698 · RERA P52700079010 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Oct 2034Possession promisedno revision filed
24 of 528Construction stages doneacross 48 buildings; furthest along: Slabs of Super Structure, 50%
45 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Mango Lakefront Tapola Phase 1 is a Residential / Group Housing project by MV TAPOLA PRIVATE LIMITED in Satara, Maharashtra, registered with MahaRERA as P52700079010 on 31 Jan 2025. Possession is promised by 31 Oct 2034. 3 of the 48 units on this registration are recorded sold or booked, and 24 of 528 construction stages are filed complete.

At a glance

Project

  • NameMango Lakefront Tapola Phase 1
  • TypeResidential / Group Housing
  • Location
    • MDR 138 KM 40/120
    • Village Ahir
    • Ahire
    • Mahabaleshwar
    • Satara
    • 412806
  • Pincode412806
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700079010
  • ReraGenie IDRG-MH-23698

Builder

  • NameMV TAPOLA PRIVATE LIMITED
  • Entity typeCompany
  • DirectorSamir Shrinivas Kale
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2025PromisedOct 2034

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jan 2025
  • Promised completion31 Oct 2034
  • Revised completionNone
  • Buildings48 building records
  • Documents filed64 files

Current status

6%3 of 48 units booked
15.5%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bungalow No 43CNA11101
Bungalow No 44CNA11101
Bungalow No 45CNA11101
Bungalow No 46CNA11101
Bungalow No 47DNA11101
Bungalow No 48DNA11101
Bungalow No 49DNA11101
Bungalow No 50CNA11101
Bungalow No 51CNA11101
Bungalow No 52CNA11101
Bungalow No 53CNA11101
Bungalow No 54CNA11101
Bungalow No 55DNA11101
Bungalow No 56DNA11101
Bungalow No 57CNA11101
Bungalow No 58CNA11101
Bungalow No 59CNA11101
Bungalow No 60CNA11101
Bungalow No 61DNA11101
Bungalow No 62DNA11101
Bungalow No 63CNA11101
Bungalow No 64CNA11101
Bungalow No 65CNA11101
Bungalow No 66CNA11101
Bungalow No 67DNA11101
Bungalow No 68DNA11101
Bungalow No 69DNA11101
Bungalow No 70CNA11101
Bungalow No 71CNA11101
Bungalow No 72CNA11101
Bungalow No 73CNA11101
Bungalow No 74CNA11101
Bungalow No 75BNA11101
Bungalow No 76CNA11101
Bungalow No 77CNA11101
Bungalow No 78CNA11101
Bungalow No 79CNA11101
Bungalow No 80CNA11101
Bungalow No 81CNA11101
Bungalow No 82CNA11101
Bungalow No 83DNA11101
Bungalow No 84ANA22101
Bungalow No 85ANA22101
Bungalow No 86ANA22101
Bungalow No 87ANA22101
Bungalow No 88ANA22101
Bungalow No 89BNA11101
Bungalow No 90DNA11101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 48 buildings; the table lists the first 20.

24 of 528 construction stages are filed complete across 48 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

Bungalow No 43C23%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 44C23%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 45C14%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 46C14%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 47D9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 48D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 49D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 50C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 51C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 52C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 53C23%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 54C14%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 55D23%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 56D23%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 57C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 58C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 59C23%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 60C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 61D9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 62D18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Open Space48
BuildingOpen SpaceTotal
Bungalow No 43C11
Bungalow No 44C11
Bungalow No 45C11
Bungalow No 46C11
Bungalow No 47D11
Bungalow No 48D11
Bungalow No 49D11
Bungalow No 50C11
Bungalow No 51C11
Bungalow No 52C11
Bungalow No 53C11
Bungalow No 54C11
Bungalow No 55D11
Bungalow No 56D11
Bungalow No 57C11
Bungalow No 58C11
Bungalow No 59C11
Bungalow No 60C11
Bungalow No 61D11
Bungalow No 62D11
Bungalow No 63C11
Bungalow No 64C11
Bungalow No 65C11
Bungalow No 66C11
Bungalow No 67D11
Bungalow No 68D11
Bungalow No 69D11
Bungalow No 70C11
Bungalow No 71C11
Bungalow No 72C11
Bungalow No 73C11
Bungalow No 74C11
Bungalow No 75B11
Bungalow No 76C11
Bungalow No 77C11
Bungalow No 78C11
Bungalow No 79C11
Bungalow No 80C11
Bungalow No 81C11
Bungalow No 82C11
Bungalow No 83D11
Bungalow No 84A11
Bungalow No 85A11
Bungalow No 86A11
Bungalow No 87A11
Bungalow No 88A11
Bungalow No 89B11
Bungalow No 90D11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area32,670 sq m
Land owned byThe promoter, with other names on the file
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Jun 2025

Approvals and building plan

Sanctioning authoritySPECIAL PLANNING AUTHORITY - MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LIMITED
Permissible FSI13772.28
Proposed, not sanctioned4,506 sq m
Buildings approved48
Buildings sanctioned48

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHESH DARSHAN, NEAR MAKHALI TALAO, OLD MUMBAI-AGRA ROAD, THANE 400601
Estimated costRs 11.11 cr
Cost incurredRs 1.72 cr
Work done15.48%
BuildingWingEstimatedIncurred
-NARs 1.80 crRs 1.09 cr
Bungalow No 84ANARs 46.86 lakh-
Bungalow No 85ANARs 46.86 lakh-
Bungalow No 86ANARs 46.86 lakh-
Bungalow No 87ANARs 46.86 lakh-
Bungalow No 88ANARs 46.86 lakh-
Bungalow No 75BNARs 22.94 lakh-
Bungalow No 89BNARs 22.94 lakh-
Bungalow No 43CNARs 18.51 lakhRs 6.00 lakh
Bungalow No 44CNARs 18.51 lakhRs 6.00 lakh
Bungalow No 45CNARs 18.51 lakhRs 4.60 lakh
Bungalow No 46CNARs 18.51 lakhRs 4.60 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay Kulkarni
EngineerR C Tipnis
Chartered AccountantKamdar Desai Patel Chartered Accounts
Chartered AccountantKamdar Desai and Patel LLP Chartered Accountants
PartnerRole in project
MV TAPOLA PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2034

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form No 1 Mango Lakefront Tapola Phase 1 240426.pdf28 Apr 2026
Withdrawal Update Form 2File: Form No 2 Mango Lakefront Tapola Phase 1 250426.pdf28 Apr 2026
Withdrawal Update Form 3File: Form No 3 Mango Lakefront Tapola Phase 1 280426.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1 - 311225.pdf14 Jan 2026
Withdrawal Update Form 2File: Form 2 - 311225.pdf14 Jan 2026
Withdrawal Update Form 3File: Form 3 - 311225.pdf14 Jan 2026
Withdrawal Update Form 1File: Form 1 300925.pdf12 Dec 2025
Withdrawal Update Form 2File: Form 2 300925.pdf12 Dec 2025
Withdrawal Update Form 3File: Form 3 300925.pdf12 Dec 2025
Form 1File: Form 1 310325.pdf21 Jul 2025
Form 2File: Form 2 310325.pdf21 Jul 2025
Form 3File: Form 3 310325.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold, Unsold, Booked Inventary 310325.pdf21 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Apr 2025
Other - LegalFile: POA - Ahir.pdf24 Jan 2025
Other - LegalFile: Declaration of Allotment of Bungalows to Land Owners.pdf24 Jan 2025
Other - LegalFile: Legal Title Report - Format A.pdf24 Jan 2025
Other - TechnicalFile: Competent authority email -Screenshot.pdf10 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Proforma of AFS - Deviation_Report.pdf13 Dec 2024
Proforma of Agreement for saleFile: Proforma of AFS.pdf13 Dec 2024
Other - LegalFile: AFS - Mango Lakefront Tapola Phase 1.pdf10 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in any other real estate organisation.pdf10 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Opening of RERA designated bank account.pdf25 Nov 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate - Format D.pdf22 Nov 2024
Other - TechnicalFile: Declaration cum Undertaking - Annexure A.pdf22 Nov 2024
Other - TechnicalFile: Screen shot of email with attached CC from MSRDC.pdf22 Nov 2024
Building plan approvalFile: Ahir Approved Plan 5-5.pdf21 Nov 2024
Building plan approvalFile: Ahir Approved Plan 4-5.pdf21 Nov 2024
Building plan approvalFile: Ahir Approved Plan 3-5.pdf21 Nov 2024
Building plan approvalFile: Ahir Approved Plan 2-5.pdf21 Nov 2024
Building plan approvalFile: Ahir Approved Plan 1-5.pdf21 Nov 2024
Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Ahir Approved Plan 4-5.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Ahir Approved Plan 1-5.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Ahir Approved Plan 2-5.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Ahir Approved Plan 3-5.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Ahir Approved Plan 5-5.pdf21 Nov 2024
Deviation Report with respect to Allotment letterFile: Proforma of Allotment Letter - Deviation report.pdf21 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed.pdf21 Nov 2024
Layout approvalFile: Ahir Approved Plan 5-5.pdf20 Nov 2024
Layout approvalFile: Ahir Approved Plan 4-5.pdf20 Nov 2024
Layout approvalFile: Ahir Approved Plan 3-5.pdf20 Nov 2024
Layout approvalFile: Ahir Approved Plan 2-5.pdf20 Nov 2024
Layout approvalFile: Ahir Approved Plan 1-5.pdf20 Nov 2024
PAN CardFile: MV tapola Pan card.pdf20 Nov 2024
PAN CardFile: Samir PAN.pdf20 Nov 2024
Copy of the legal title reportFile: Legal Title Report.pdf20 Nov 2024
Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances - Finance.pdf20 Nov 2024
Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances - Legal.pdf20 Nov 2024
Copy of Layout Approval (in case of layout)File: Ahir Approved Plan 5-5.pdf20 Nov 2024
Copy of Layout Approval (in case of layout)File: Ahir Approved Plan 4-5.pdf20 Nov 2024
Copy of Layout Approval (in case of layout)File: Ahir Approved Plan 3-5.pdf20 Nov 2024
Copy of Layout Approval (in case of layout)File: Ahir Approved Plan 2-5.pdf20 Nov 2024
Copy of Layout Approval (in case of layout)File: Ahir Approved Plan 1-5.pdf20 Nov 2024
Declaration in FORM BFile: Form B.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-Ahir.pdf20 Nov 2024
CERSAI detailsFile: CERSAI Undertaking.pdf20 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about RERA designated Bank Account.pdf20 Nov 2024
Details of encumbrances concerned to LegalFile: Declaration of Encumbrances - Finance.pdf20 Nov 2024
Details of encumbrances concerned to LegalFile: Declaration of Encumbrances - Legal.pdf20 Nov 2024

How this compares with Satara

6%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep Mango Lakefront Tapola Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Ahir1,100+ in Satara

Builder: MV TAPOLA PRIVATE LIMITED

MV TAPOLA PRIVATE LIMITED has 2 registrations on MahaRERA, including Mango Lakefront Tapola Phase 1 and Mango Lakefront Tapola Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if Mango Lakefront Tapola Phase 1 is delayed beyond 31 Oct 2034?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mango Lakefront Tapola Phase 1?

The registered promoter entity is MV TAPOLA PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mango Lakefront Tapola Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mango Lakefront Tapola Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mango Lakefront Tapola Phase 1?

The professionals named in the filing: Architect: Sanjay Kulkarni; Engineer: R C Tipnis; Chartered Accountant: Kamdar Desai Patel Chartered Accounts; Chartered Accountant: Kamdar Desai and Patel LLP Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mango Lakefront Tapola Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mango Lakefront Tapola Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mango Lakefront Tapola Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.