Home / Browse projects / Satara, Maharashtra / Mango Lakefront Tapola Phase 2

Registered No litigation declared Residential / Group Housing project

Mango Lakefront Tapola Phase 2

By MV TAPOLA PRIVATE LIMITED

RG-MH-23757 · RERA P52700079069 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Oct 2034Possession promisedno revision filed
13 of 462Construction stages doneacross 42 buildings; furthest along: Plinth, 70%
41 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Mango Lakefront Tapola Phase 2 is a Residential / Group Housing project by MV TAPOLA PRIVATE LIMITED in Satara, Maharashtra, registered with MahaRERA as P52700079069 on 3 Feb 2025. Possession is promised by 31 Oct 2034. 1 of the 42 units on this registration are recorded sold or booked, and 13 of 462 construction stages are filed complete.

At a glance

Project

  • NameMango Lakefront Tapola Phase 2
  • TypeResidential / Group Housing
  • Location
    • MDR 138 km 40/120
    • Village Walne
    • Walne
    • Mahabaleshwar
    • Satara
    • 412806
  • Pincode412806
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700079069
  • ReraGenie IDRG-MH-23757

Builder

  • NameMV TAPOLA PRIVATE LIMITED
  • Entity typeCompany
  • DirectorSamir Shrinivas Kale
  • Other registrations1 more →

Key dates

this monthRegisteredFeb 2025PromisedOct 2034

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2025
  • Promised completion31 Oct 2034
  • Revised completionNone
  • Buildings42 building records
  • Documents filed74 files

Current status

2%1 of 42 units booked
16.1%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bungalow No 19BNA11101
Bungalow No 20BNA11101
Bungalow No 21BNA11101
Bungalow No 22BNA11101
Bungalow No 23BNA11101
Bungalow No 24BNA11101
Bungalow No 25DNA11101
Bungalow No 26CNA11101
Bungalow No 27CNA11101
Bungalow No 28CNA11101
Bungalow No 29CNA11101
Bungalow No 30DNA11101
Bungalow No 31CNA11101
Bungalow No 32CNA11101
Bungalow No 33CNA11101
Bungalow No 34CNA11101
Bungalow No 35CNA11101
Bungalow No 36DNA11101
Bungalow No 37DNA11101
Bungalow No 38CNA11101
Bungalow No 39CNA11101
Bungalow No 40CNA11101
Bungalow No 41CNA11101
Bungalow No 42CNA11101
Bungalow No 1ANA22101
Bungalow No 2ANA22101
Bungalow No 3ANA22101
Bungalow No 4ANA22101
Bungalow No 5BNA11101
Bungalow No 6BNA11101
Bungalow No 7BNA11101
Bungalow No 8BNA11101
Bungalow No 9BNA11101
Bungalow No 10DNA11101
Bungalow No 11BNA11101
Bungalow No 12BNA11101
Bungalow No 13BNA11101
Bungalow No 14BNA11101
Bungalow No 15CNA11101
Bungalow No 16CNA11101
Bungalow No 17DNA11101
Bungalow No 18BNA11101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 42 buildings; the table lists the first 20.

13 of 462 construction stages are filed complete across 42 buildings. The stage furthest along is Plinth, at 70%.

Bungalow No 19B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 20B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 21B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 22B18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 23B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 24B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 25D15%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth70%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 26C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 27C18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 28C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 29C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 30D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 31C9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 32C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 33C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 34C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 35C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 36D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 37D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 38C14%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Open Space42
BuildingOpen SpaceTotal
Bungalow No 19B11
Bungalow No 20B11
Bungalow No 21B11
Bungalow No 22B11
Bungalow No 23B11
Bungalow No 24B11
Bungalow No 25D11
Bungalow No 26C11
Bungalow No 27C11
Bungalow No 28C11
Bungalow No 29C11
Bungalow No 30D11
Bungalow No 31C11
Bungalow No 32C11
Bungalow No 33C11
Bungalow No 34C11
Bungalow No 35C11
Bungalow No 36D11
Bungalow No 37D11
Bungalow No 38C11
Bungalow No 39C11
Bungalow No 40C11
Bungalow No 41C11
Bungalow No 42C11
Bungalow No 1A11
Bungalow No 2A11
Bungalow No 3A11
Bungalow No 4A11
Bungalow No 5B11
Bungalow No 6B11
Bungalow No 7B11
Bungalow No 8B11
Bungalow No 9B11
Bungalow No 10D11
Bungalow No 11B11
Bungalow No 12B11
Bungalow No 13B11
Bungalow No 14B11
Bungalow No 15C11
Bungalow No 16C11
Bungalow No 17D11
Bungalow No 18B11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area32,200 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jun 2025

Approvals and building plan

Sanctioning authoritySPECIAL PLANNING AUTHORITY - MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LIMITED
Permissible FSI13855.14
Proposed, not sanctioned4,299 sq m
Buildings approved42
Buildings sanctioned42

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHESH DARSHAN, NEAR MAKHALI TALAO, OLD MUMBAI-AGRA ROAD, THANE 400601
Estimated costRs 10.71 cr
Cost incurredRs 1.72 cr
Work done16.06%
BuildingWingEstimatedIncurred
-NARs 1.80 crRs 1.09 cr
Bungalow No 1ANARs 46.93 lakh-
Bungalow No 2ANARs 46.93 lakh-
Bungalow No 3ANARs 46.93 lakh-
Bungalow No 4ANARs 46.93 lakhRs 6.00 lakh
Bungalow No 19BNARs 22.98 lakh-
Bungalow No 20BNARs 22.98 lakh-
Bungalow No 21BNARs 22.98 lakh-
Bungalow No 22BNARs 22.98 lakhRs 7.00 lakh
Bungalow No 23BNARs 22.98 lakh-
Bungalow No 24BNARs 22.98 lakh-
Bungalow No 5BNARs 22.98 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay Kulkarni
EngineerR C Tipnis
Chartered AccountantKamdar Desai Patel Chartered Accountants
Chartered AccountantKamdar Desai & Patel LLP Chartered Accountants
PartnerRole in project
MV TAPOLA PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2034

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form No 1 Mango Lakefront Tapola Phase 2 240426.pdf28 Apr 2026
Withdrawal Update Form 2File: Form No 2 Mango Lakefront Tapola Phase 2 250426.pdf28 Apr 2026
Withdrawal Update Form 3File: Form No 3 Mango Lakefront Tapola Phase 2 270426.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1 - 311225.pdf14 Jan 2026
Withdrawal Update Form 2File: Form 2 - 311225.pdf14 Jan 2026
Withdrawal Update Form 3File: Form 3 311225.pdf14 Jan 2026
Withdrawal Update Form 1File: Form 1 300925.pdf12 Dec 2025
Withdrawal Update Form 2File: Form 2 300925.pdf12 Dec 2025
Withdrawal Update Form 3File: Form 3 300925.pdf12 Dec 2025
Form 1File: Form 1 310325.pdf21 Jul 2025
Form 2File: Form 2 310325.pdf21 Jul 2025
Form 3File: Form 3 310325.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold, Unsold, Booked Inventary 310325.pdf21 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Apr 2025
Other - LegalFile: Declaration of Allotment of Bungalows to Land Owners.pdf24 Jan 2025
Other - LegalFile: POA - Walne.pdf23 Jan 2025
Other - TechnicalFile: Competent authority email -Screenshot.pdf10 Jan 2025
Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf20 Dec 2024
Proforma of Agreement for saleFile: Proforma of AFS.pdf20 Dec 2024
Other - LegalFile: Legal Title Report - Format A.pdf19 Dec 2024
Other - TechnicalFile: Authenticity of CC from competent authority.pdf18 Dec 2024
Other - LegalFile: AFS - Mango Lakefront Tapola Phase 2.pdf10 Dec 2024
Copy of the legal title reportFile: Legal Title Report - Format A.pdf5 Dec 2024
Proforma of Agreement for saleFile: Proforma of AFS.pdf5 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest In Other Real Estate Projects - Annexure A.pdf4 Dec 2024
Other - FinanceFile: Clarification in table G - Form 3.pdf30 Nov 2024
Other - TechnicalFile: Clarification in table G - Form 3.pdf30 Nov 2024
Other - TechnicalFile: Screenshot of email from compepative authority.pdf26 Nov 2024
Other - TechnicalFile: Declaration cum Undertaking - Annexure A.pdf26 Nov 2024
Other - TechnicalFile: Walne Approved Plan 1-6 BUA Highlighted.pdf26 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Opening of RERA designated bank account.pdf25 Nov 2024
Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf23 Nov 2024
Deviation Report with respect to Allotment letterFile: Proforma of Allotment Letter - Deviation report.pdf23 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Proforma of AFS - Deviation report.pdf23 Nov 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate - Format D.pdf22 Nov 2024
Building plan approvalFile: Walne Approved Plan 6-6.pdf21 Nov 2024
Building plan approvalFile: Walne Approved Plan 5-6.pdf21 Nov 2024
Building plan approvalFile: Walne Approved Plan 4-6.pdf21 Nov 2024
Building plan approvalFile: Walne Approved Plan 3-6.pdf21 Nov 2024
Building plan approvalFile: Walne Approved Plan 2-6.pdf21 Nov 2024
Building plan approvalFile: Walne Approved Plan 1-6.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Walne Approved Plan 6-6.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Walne Approved Plan 1-6.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Walne Approved Plan 2-6.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Walne Approved Plan 3-6.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Walne Approved Plan 4-6.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Walne Approved Plan 5-6.pdf21 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed.pdf21 Nov 2024
Layout approvalFile: Walne Approved Plan 6-6.pdf19 Nov 2024
Layout approvalFile: Walne Approved Plan 5-6.pdf19 Nov 2024
Layout approvalFile: Walne Approved Plan 4-6.pdf19 Nov 2024
Layout approvalFile: Walne Approved Plan 3-6.pdf19 Nov 2024
Layout approvalFile: Walne Approved Plan 2-6.pdf19 Nov 2024
Layout approvalFile: Walne Approved Plan 1-6.pdf19 Nov 2024
PAN CardFile: MV tapola Pan card.pdf19 Nov 2024
PAN CardFile: Samir PAN.pdf19 Nov 2024
Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances - Finance.pdf19 Nov 2024
Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances - Legal.pdf19 Nov 2024
Copy of Layout Approval (in case of layout)File: Walne Approved Plan 1-6.pdf19 Nov 2024
Copy of Layout Approval (in case of layout)File: Walne Approved Plan 2-6.pdf19 Nov 2024
Copy of Layout Approval (in case of layout)File: Walne Approved Plan 3-6.pdf19 Nov 2024
Copy of Layout Approval (in case of layout)File: Walne Approved Plan 4-6.pdf19 Nov 2024
Copy of Layout Approval (in case of layout)File: Walne Approved Plan 5-6.pdf19 Nov 2024
Copy of Layout Approval (in case of layout)File: Walne Approved Plan 6-6.pdf19 Nov 2024
Declaration in FORM BFile: Form B.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-walne.pdf19 Nov 2024
CERSAI detailsFile: CERSAI Undertaking.pdf19 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about RERA designated Bank Account.pdf19 Nov 2024
Details of encumbrances concerned to LegalFile: Declaration of Encumbrances - Finance.pdf19 Nov 2024
Details of encumbrances concerned to LegalFile: Declaration of Encumbrances - Legal.pdf19 Nov 2024

How this compares with Satara

2%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep Mango Lakefront Tapola Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Walne1,100+ in Satara

Builder: MV TAPOLA PRIVATE LIMITED

MV TAPOLA PRIVATE LIMITED has 2 registrations on MahaRERA, including Mango Lakefront Tapola Phase 1 and Mango Lakefront Tapola Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if Mango Lakefront Tapola Phase 2 is delayed beyond 31 Oct 2034?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mango Lakefront Tapola Phase 2?

The registered promoter entity is MV TAPOLA PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mango Lakefront Tapola Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mango Lakefront Tapola Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mango Lakefront Tapola Phase 2?

The professionals named in the filing: Architect: Sanjay Kulkarni; Engineer: R C Tipnis; Chartered Accountant: Kamdar Desai Patel Chartered Accountants; Chartered Accountant: Kamdar Desai & Patel LLP Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mango Lakefront Tapola Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mango Lakefront Tapola Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mango Lakefront Tapola Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.