Registered No litigation declared Plotted project

Nivaan Medows

By VISHAL CHUGERA PROPERTIES PRIVATE LIMITED

RG-MH-04832 · RERA P52100020464 · Last updated on MahaRERA portal: 1 Jan 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 86 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 86 months from the original
0 of 141Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 168 documents Report an error

Nivaan Medows is a Plotted project by VISHAL CHUGERA PROPERTIES PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100020464 on 15 Apr 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 86 months from the original filing. 141 of the 141 units on this registration are recorded sold or booked. 3 complaints are on record with the regulator.

At a glance

Project

  • NameNivaan Medows
  • TypePlotted
  • Location
    • Kesnand Road
    • Kesnand Pune
    • Kesnand
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100020464
  • ReraGenie IDRG-MH-04832

Builder

  • NameVISHAL CHUGERA PROPERTIES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45500PN2018PTC178488
  • DirectorsVISHAL ASHOK CHUGERA, MUSKAN VISHAL CHUGERA
  • Other registrations1 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2019First promiseOct 2019Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Apr 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Oct 2019)
  • BuildingsNot stated in filing
  • Documents filed168 files

Current status

100%141 of 141 units booked
90.1%Work done, per cost certificate

Figures as on 1 Jan 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 1 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area30,871 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Sep 2024

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Developement Authority

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFatimanagar Near Vishal Mega Mart
Estimated costRs 19.77 cr
Cost incurredRs 17.81 cr
Work done90.06%
BuildingWingEstimatedIncurred
-NARs 19.77 crRs 17.81 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAditya Associates
ArchitectVedika Bharat Kadu
EngineerAbodh Apte
EngineerNawab Kalal
Chartered AccountantAjay Rander and Co
Chartered AccountantCA Priyesh Prakash Jain
Chartered Accountantnilesh raut
Chartered AccountantGurunath Salagonde
PartnerRole in project
VISHAL CHUGERA PROPERTIES INDIA PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019756Oct 2019 → Dec 2026

Reason as filed by the promoterI, hereby apply for extension As per Order No. 40 Dated 27/12/2022 without majority consents of the allottees. We have also received the Order for the same from MahaRERA

EXT52100010921Oct 2019 → Jun 2022

Reason as filed by the promoterDue to Covid-19, we are facing difficulty in material procurement and labour / Manpower availability, I hereby request you to kindly accept my extensionrequest to 30/06/2022.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC005000000106522aNANDVISHAL CHUGERA PROPERTIES PRIVATE LIMITED14/02/2022
CC005000000310393shekhar rautVISHAL CHUGERA12/02/2024
CC005000000310543Nilesh Ashok BoradkarVISHAL CHUGERA03/03/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Oct 2019

Documents filed168

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 168 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2019-2020)File: Form-2A Quality Assurance Certificate FY 2019-20 Phase-I.pdf1 Jan 2026
Form 2A (FY 2023-2024)File: Form-2A Quality Assurance Certificate FY 2023-24 Phase-I.pdf1 Jan 2026
Form 2A (FY 2022-2023)File: Form-2A Quality Assurance Certificate FY 2022-23 Phase-I.pdf1 Jan 2026
Form 2A (FY 2021-2022)File: Form-2A Quality Assurance Certificate FY 2021-22 Phase-I.pdf1 Jan 2026
Form 2A (FY 2020-2021)File: Form-2A Quality Assurance Certificate FY 2020-21 Phase-I.pdf1 Jan 2026
Form 1File: Form-1 Architect Certificate 30092025.pdf29 Dec 2025
Form 2File: Form-2.pdf29 Dec 2025
Form 3File: Form-3_compressed.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf29 Dec 2025
Form 5 (FY 2020-2021)File: Form-5 RERA Audit FY 2020-21.pdf25 Nov 2025
Form 5 (FY 2024-2025)File: Form-5 RERA Audit FY 2024-25.pdf24 Nov 2025
Form 5 (FY 2023-2024)File: Form-5 RERA Audit FY 2023-24.pdf24 Nov 2025
Form 5 (FY 2022-2023)File: Form-5 RERA Audit FY 2022-23.pdf24 Nov 2025
Form 5 (FY 2021-2022)File: Form-5 RERA Audit FY 2021-22.pdf24 Nov 2025
Form 2A (FY 2024-2025)File: Form-2A Engineer Certificate For Quality Assurance FY 2024-25.pdf8 Sep 2025
Form 1File: Form-1 Architect Certificate 30062025.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 30062025.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 30062025.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062025.pdf31 Jul 2025
Form 1File: Form-1 Architct certificate 31122024.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 31122024.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 31122024.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122024.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 30092024.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 30092024.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 30092024.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092024.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 30062024.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 30062024.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 30062024.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062024.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 31032025.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 31032025.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 31032025.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032025.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 31032024 Nivaan Meadows-I.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 31032024 Nivaan Meadows-I.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 31032024.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory 31032024 Nivaan Meadows-I.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 31122023 Phase-I.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 31122023 Phase-I.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 31122023.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122023 Phase-I.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 30092023 Phase-I.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 30092023 Phase-I.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 30092023.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092023.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 30062023 Phase-I.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 30062023 Phase-I.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 30062023.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062023.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 31032023 Phase-I.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 31032023 Phase-I.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 31032023.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032023.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 31122022 Phase-I.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 31122022 Phase-I.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 31122022.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122022.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 30092022 Phase-I.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 30092022 Phase-I.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 30092022.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092022.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 30062022 Phase-I.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 30062022 Phase-I.pdf31 Jul 2025
Form 3File: Form-2 Engineer Certificate 30062022 Phase-I.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062022.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 31032022 Phase-I.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 31032022 Phase-I.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 31032022.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032022.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 31122021 Phase-I.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 31122021 Phase-I.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 31122021.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122021.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 31032021 Phase-I.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate 31032021 Phase-I.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate 31032021.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032021.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 31032020 Phase-I.pdf31 Jul 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
NIVAAN MEADOWSP52100023936KESNAND, Pune253Jan 2020OngoingDec 2026Registered original: Dec 2022Not due yet
Shanti ConstructionGat No 1637 Sai Shanti Fase 1 Ramdara Road Loni Kalbhor Pune 412201152-CompletedAug 2015Aug 2015

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 86 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nivaan Medows on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kesnand Pune13,700+ in Pune

2 kmNivaan MedowsCompleted 64Lapsed / revoked 31Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 129 registered projects within 2 km.

Builder: VISHAL CHUGERA PROPERTIES PRIVATE LIMITED

VISHAL CHUGERA PROPERTIES PRIVATE LIMITED has 2 registrations on MahaRERA, including Nivaan Medows and NIVAAN MEADOWS. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Nivaan Medows is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nivaan Medows?

The registered promoter entity is VISHAL CHUGERA PROPERTIES PRIVATE LIMITED, a company as per the filing. Its CIN U45500PN2018PTC178488 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nivaan Medows?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Nivaan Medows?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Nivaan Medows?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nivaan Medows?

The professionals named in the filing: Architect: Aditya Associates; Architect: Vedika Bharat Kadu; Engineer: Abodh Apte; Engineer: Nawab Kalal; Chartered Accountant: Ajay Rander and Co; Chartered Accountant: CA Priyesh Prakash Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nivaan Medows?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nivaan Medows. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nivaan Medows to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.