Home / Browse projects / Pune, Maharashtra / Nivaan Sparsh Phase-1

Registered No litigation declared Plotted project

Nivaan Sparsh Phase-1

By Vishal Ashok Chugera

RG-MH-97002 · RERA P52100052594 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
150 of 150Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Nivaan Sparsh Phase-1 is a Plotted project by Vishal Ashok Chugera in Pune, Maharashtra, registered with MahaRERA as P52100052594 on 11 Sep 2023. Possession is promised by 15 Jun 2027. 0 of the 150 units on this registration are recorded sold or booked.

At a glance

Project

  • NameNivaan Sparsh Phase-1
  • TypePlotted
  • Location
    • Theur
    • Mauje Theur
    • Haveli
    • Pune
    • 412110
  • Pincode412110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052594
  • ReraGenie IDRG-MH-97002

Builder

  • NameVishal Ashok Chugera
  • Entity typeIndividual
  • Other registrations9 more →
  • Completed1 of 10
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects13 →

Key dates

this monthRegisteredSep 2023PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Sep 2023
  • Promised completion15 Jun 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed92 files

Current status

0%0 of 150 units booked

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes5%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area26,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Oct 2025

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI26000.0

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFatima Nagar Pune

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNilesh Chorghade
EngineerNawab Mahamad Kalal
Chartered Accountantpriyesh Prakash Jain
Chartered Accountantnilesh raut
Chartered AccountantGurunath Salagonde

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Jun 2027

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 Architect Certificate 30092023_11zon.pdf11 Jun 2026
Form 2File: Form-2 Engineer Certificate 30092023.pdf11 Jun 2026
Form 3File: Form-3 CA Certificate 30092023_7_11zon.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory 30092023.pdf11 Jun 2026
Form 1File: Form-1 Architect Certificate 31122023.pdf11 Jun 2026
Form 2File: Form-2 Engineer Certificate 31122023.pdf11 Jun 2026
Form 3File: Form-3 CA Certificate 31122023_3_11zon.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory 31122023.pdf11 Jun 2026
Form 1File: Form-1 Architect Certificate 31032024.pdf11 Jun 2026
Form 2File: Form-2 Engineer Certificate 31032024.pdf11 Jun 2026
Form 3File: Form-3 CA Certificate 31032024_2_11zon.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory 31032024.pdf11 Jun 2026
Form 1File: Form-1 Architect Certificate 30062024.pdf11 Jun 2026
Form 2File: Form-2 Engineer Certificate 30062024.pdf11 Jun 2026
Form 3File: Form-3 CA Certificate 30062024_6_11zon.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory 30062024.pdf11 Jun 2026
Form 1File: Form-1 Architect Certificate 30092024.pdf11 Jun 2026
Form 2File: Form-2 Engineer Certificate 30092024.pdf11 Jun 2026
Form 3File: Form-3 CA Certificate 30092024_1_11zon.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory 30092024.pdf11 Jun 2026
Form 1File: Form-1 Architect Certificate 31122024.pdf11 Jun 2026
Form 2File: Form-2 Engineer Certificate 31122024.pdf11 Jun 2026
Form 3File: Form-3 CA Certificate 31122024_4_11zon.pdf11 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory 31122024.pdf11 Jun 2026
Form 5 (FY 2023-2024)File: FORM 5 FY 2023-24 Nivaan Sparsh Phase-1.pdf11 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31122023.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31122023.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31032024.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30062024.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30092024.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31122024.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30092023_compressed.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30092023_compressed.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31122023_compressed.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31032024_compressed.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30062024_compressed.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30092024_compressed.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31122024_compressed.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30092023.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 31122024.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30092024.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30062024.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 31032024.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 31122023.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory 30092023_compressed.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory 31122023_compressed.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory 31032024_compressed.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory 30062024_compressed.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory 30092024.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory 31122024_compressed.pdf18 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A Quality Assurance Certificate FY 2023-24.pdf18 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 RERA Audit Report FY 2023-24_compressed.pdf18 Mar 2025
Layout approvalFile: Sanctioned Plan 10072024 1-2.pdf31 Jul 2024
Layout approvalFile: Sanctioned Plan 10072024 2-2.pdf31 Jul 2024
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 10072024 1-2.pdf31 Jul 2024
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 10072024 2-2.pdf31 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 10072024.pdf31 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: NIvaan Sparsh CC Verification.pdf1 Sep 2023
Other - TechnicalFile: NIvaan Sparsh CC Verification.pdf1 Sep 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Finance 12062023 (Gat No) Nivaan Sparsh Ph-1.pdf31 Aug 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Legal 17072023 (Gat No) Nivaan Sparsh Ph-1.pdf31 Aug 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Finance 12062023 (Gat No) Nivaan Sparsh Ph-1.pdf31 Aug 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Legal 17072023 (Gat No) Nivaan Sparsh Ph-1.pdf31 Aug 2023
CERSAI detailsFile: 1 CERSAI details (7).pdf31 Aug 2023
Other - TechnicalFile: Index II.pdf28 Aug 2023
Other - TechnicalFile: Declaration on landownership.pdf28 Aug 2023
Other - TechnicalFile: Declaration regarding Plot Area.pdf28 Aug 2023
CERSAI detailsFile: CERSAI_Search_Report_200278970907_For_Asset_Based_Search_31_08_2023_13_03_45_978.pdf10 Jul 2023
Building plan approval or NA orderFile: GetUserDocumentFileContent.pdf9 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: GetUserDocumentFileContent.pdf9 Jul 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate 08072023 Nivaan Sparsh 1 - Done.pdf9 Jul 2023
Other - LegalFile: Sale Deed 19032023 Part-1.pdf5 Jul 2023
Other - LegalFile: Sale Deed 19032023 Part-2.pdf5 Jul 2023
Proforma of Agreement for saleFile: Agreement For Sale-Draft Nivaan Sparsh-1.pdf30 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement For Sale 30062023.pdf30 Jun 2023
Declaration in FORM BFile: Form-B Affidavit Vishal Chugera 24062023.pdf26 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architects Certificate 24062023.pdf26 Jun 2023
Proforma of Allotment letterFile: Performa of Allotment Letter Nivaan Sparsh Ph 1.pdf26 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 22062023.pdf24 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank AC 13062023 Nivaan Sparsh Ph 1.pdf24 Jun 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationStatusPromisedDelivered
Nivaan HillsKuroshi Satara Pune 412806OngoingApr 2025Apr 2025
Nivaan MedowsKesnand Pune 412207CompletedDec 2022Dec 2022
NIVAAN MEADOWSKesnand Pune 412207CompletedDec 2022Dec 2022

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nivaan Sparsh Phase-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mauje Theur13,700+ in Pune

2 kmNivaan Sparsh Phase-1Lapsed / revoked 4Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: Vishal Ashok Chugera

VISHAL ASHOK CHUGERA has 10 registrations on MahaRERA, including Fire Fly and KRISH VILLAS. Its filings disclose 13 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Nivaan Sparsh Phase-1 is delayed beyond 15 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nivaan Sparsh Phase-1?

The registered promoter entity is Vishal Ashok Chugera, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nivaan Sparsh Phase-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nivaan Sparsh Phase-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nivaan Sparsh Phase-1?

The professionals named in the filing: Architect: Nilesh Chorghade; Engineer: Nawab Mahamad Kalal; Chartered Accountant: priyesh Prakash Jain; Chartered Accountant: nilesh raut; Chartered Accountant: Gurunath Salagonde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nivaan Sparsh Phase-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nivaan Sparsh Phase-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nivaan Sparsh Phase-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.