ELYSIA D-4
By VIHANG INFRASTRUCTURE PVT LTD
RG-MH-31766 · RERA P51700080101 · Last updated on MahaRERA portal: 6 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 6 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ELYSIA D-4 is a Residential / Group Housing project by VIHANG INFRASTRUCTURE PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700080101 on 29 Apr 2025. Possession is promised by 31 Dec 2031. 0 of the 317 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameELYSIA D-4
- TypeResidential / Group Housing
- Location
- GB CROSS ROAD THANE
- VILLAGE OVALE
- Thane (M Corp.)
- Thane
- 400615
- Pincode400615
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700080101
- ReraGenie IDRG-MH-31766
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Apr 2025
- Promised completion31 Dec 2031
- Revised completionNone
- Buildings1 building record
- Documents filed61 files
Current status
Figures as on 6 May 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building no 7 ELYSIA D 4 | NA | 51 | 40 | 317 | 0 | 317 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Building no 7 ELYSIA D 4: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed166
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAAKAAR ARCHITECTS |
| Architect | AJAY RAMESH MANE |
| Architect | ABHIJEET JAGTAP |
| Engineer | R C Tipnis |
| Engineer | TUKARAM HAMRASKAR |
| Chartered Accountant | R C Jain Associates LLP |
| Chartered Accountant | Lilani & Co |
| Chartered Accountant | Lilani & co. |
| Chartered Accountant | LILANI AND CO |
| Partner | Role in project |
|---|---|
| VIHANG INFRASTRUCTURE PVT LTD | - |
Litigation declared6
| Case | Court | Status |
|---|---|---|
| 1119/2022 | civil court thane | exhibit hearing |
| 698/2010 | civil court thane | exhibit hearing |
| 342/2008 | civil court thane | evidence |
| restoration application of revision against order/2013 | REVENUE MINISTER OF STATE | pending for argument |
| revision /2016 | REVENUE MINISTER OF STATE | CLOSE FOR ORDER |
| 88/2015 | civil court thane | exhibit hearing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2031
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Proforma of Allotment letterFile: allotment letter final.pdf | 6 May 2025 |
| Other - LegalFile: ANNEXURE A.pdf | 28 Apr 2025 |
| Other - LegalFile: DECLARATION FOR PLOT AREA CALCULATION.pdf | 28 Apr 2025 |
| Layout approvalFile: VALLEY LAYOUT - D4.pdf | 25 Apr 2025 |
| Building plan approvalFile: D4 Basement AND Ground Floor.pdf | 25 Apr 2025 |
| Building plan approvalFile: D4 Refuge 41st AND terrace.pdf | 25 Apr 2025 |
| Building plan approvalFile: D4 Typical floor.pdf | 25 Apr 2025 |
| Building plan approvalFile: sections.pdf | 25 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: VALLEY LAYOUT - D4.pdf | 25 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: D4 CC UPTO 41 FLOOR 23 04 2025.pdf | 25 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: sections.pdf | 25 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: D4 Typical floor.pdf | 25 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: D4 Basement AND Ground Floor.pdf | 25 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: D4 Refuge 41st AND terrace.pdf | 25 Apr 2025 |
| Other - TechnicalFile: ANNEXURE(A)DECLARATION-CUM-UNDERTAKING.pdf | 25 Apr 2025 |
| Other - TechnicalFile: DECLARATION FOR PLOT AREA CALCULATION ELYSIA D4.pdf | 25 Apr 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B cosmos bank opening rera designated bank account.pdf | 25 Apr 2025 |
| Layout approvalFile: D4 Layout.pdf | 24 Apr 2025 |
| Layout approvalFile: D4 Basement AND Ground Floor.pdf | 24 Apr 2025 |
| Layout approvalFile: D4 Typical floor.pdf | 24 Apr 2025 |
| Layout approvalFile: sections.pdf | 24 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Signed noN encumberance certificate- finance.pdf | 24 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Signed noN encumberance certificate- legal.pdf | 24 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: sections.pdf | 24 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: D4 Typical floor.pdf | 24 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: D4 Basement AND Ground Floor.pdf | 24 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: D4 Layout.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE DATE 23-04-2025_compressed.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 2 2.pdf | 24 Apr 2025 |
| Other - LegalFile: FORM B AFFIDAVIT - CUM DECLARATION 24-04-2025.pdf | 24 Apr 2025 |
| Details of encumbrances concerned to LegalFile: Signed noN encumberance certificate- finance.pdf | 24 Apr 2025 |
| Details of encumbrances concerned to LegalFile: Signed noN encumberance certificate- legal.pdf | 24 Apr 2025 |
| Proforma of Agreement for saleFile: DRAFT OF FSA-ELYSIA - with parking 24-04-2025.pdf | 24 Apr 2025 |
| Copy of the legal title reportFile: 1 TITLE REPORT DT 23-04-2025_compressed_Part1.pdf | 23 Apr 2025 |
| Copy of the legal title reportFile: 9 TITLE REPORT DT 23-04-2025_compressed_Part9.pdf | 23 Apr 2025 |
| Copy of the legal title reportFile: 8 TITLE REPORT DT 23-04-2025_compressed_Part8.pdf | 23 Apr 2025 |
| Copy of the legal title reportFile: 7 TITLE REPORT DT 23-04-2025_compressed_Part7.pdf | 23 Apr 2025 |
| Copy of the legal title reportFile: 6 TITLE REPORT DT 23-04-2025_compressed_Part6.pdf | 23 Apr 2025 |
| Copy of the legal title reportFile: 4 TITLE REPORT DT 23-04-2025_compressed_Part4.pdf | 23 Apr 2025 |
| Copy of the legal title reportFile: 3 TITLE REPORT DT 23-04-2025_compressed_Part3.pdf | 23 Apr 2025 |
| Copy of the legal title reportFile: 2 TITLE REPORT DT 23-04-2025_compressed_Part2.pdf | 23 Apr 2025 |
| Copy of the legal title reportFile: 5 TITLE REPORT DT 23-04-2025_compressed_Part5.pdf | 23 Apr 2025 |
| CERSAI detailsFile: CERSAI REPORT Elysia.pdf | 23 Apr 2025 |
| CERSAI detailsFile: Signed undertaking cersai (2).pdf | 23 Apr 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Signed disclosure for secured-unsecured finance availed for the project 23-04-25.pdf | 23 Apr 2025 |
| Other - LegalFile: Vihang Valley ELYSIA- D- 4 - OWNERS Satbara -17 April 2025.pdf | 19 Apr 2025 |
| Other - LegalFile: Deed of Conveyance 69-3A-2, 78-3B Dated-7-8-2019 Reg-13374_compressed.pdf | 19 Apr 2025 |
| Other - LegalFile: 80 Deed of Conveyance Dated-6-7-2012 Reg- 5333_compressed -0_Part1.pdf | 19 Apr 2025 |
| Other - LegalFile: 80 Deed of Conveyance Dated-6-7-2012 Reg- 5333_compressed -0_Part2.pdf | 19 Apr 2025 |
| Other - LegalFile: SURVEY 69-1-1 AND 69-3-A2.pdf | 19 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: deviation report elysia D-4 Date 17-04-2025_compressed_Part1.pdf | 19 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: deviation report elysia D-4 Date 17-04-2025_compressed_Part2.pdf | 19 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: PURVESH SIR- DISCLOUSER IN OTHER ESTATE PROJECT.pdf | 19 Apr 2025 |
| PAN CardFile: vihang insrastructure pvt ltd- PAN CARD.pdf | 8 Apr 2025 |
| Proforma of Allotment letterFile: allotment letter-08-04-2025.pdf | 8 Apr 2025 |
| Declaration in FORM BFile: FORM B - Affidavit cum Declaration - Maharera D-4_compressed.pdf | 8 Apr 2025 |
| Declaration about Commencement CertificateFile: Signed declaration about commencement certificate format-D 23-04-25.pdf | 8 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A ELYSIA.pdf | 8 Apr 2025 |
| Deviation Report with respect to Allotment letterFile: deviation report letter 08-04-2025 digital sign.pdf | 8 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGNIZATION.pdf | 8 Apr 2025 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| ELITA D3P51700034754 | OWALE, Thane | 324 | Apr 2022 | Ongoing | Dec 2030Registered original: Dec 2029 | Not due yet |
| Evana D-2P51700034145 | THANE, Thane | 326 | Mar 2022 | Ongoing | Dec 2029 | Not due yet |
| vihang valleyP51700007077 | owale, Thane | - | Aug 2017 | Completed | Dec 2026 | Dec 2019 |
| METRO HIVE D-1P51700020335 | OVALE, Thane | 180 | Apr 2019 | Ongoing | Dec 2026 | Not due yet |
| COMMERCIAL BUILDING 10P51700046036 | OVALE VILLAGE, Thane | 2 | Jun 2022 | Ongoing | Dec 2025Registered original: Dec 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 61 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ELYSIA D-4 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VILLAGE OVALE7,600+ in Thane
Filed coordinates, straight-line distance. 149 registered projects within 2 km.
Godrej Emerald Thane
Godrej Greenview Housing Private Limited
NORTH IMPERIAL GREENS -TOWER 2
Skylark Buildspace Private Limited
VIHANG MARINA
BALAJI ENTERPRISES
Puranik City Reserva Phase 1
Puranik Builders Limited
NORTH IMPERIAL GREENS - TOWER 1
Skylark Buildspace Private Limited
RAUNAK 108
UNNATHI ASSOCIATES
See every Thane project, with the district possession charts
Builder: VIHANG INFRASTRUCTURE PVT LTD
VIHANG INFRASTRUCTURE PVT LTD has 6 registrations on MahaRERA, including vihang valley and METRO HIVE D-1. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if ELYSIA D-4 is delayed beyond 31 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ELYSIA D-4?
The registered promoter entity is VIHANG INFRASTRUCTURE PVT LTD, a company as per the filing. Its CIN U45201MH2008PTC177865 and GSTIN 27AACCV9897P1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ELYSIA D-4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ELYSIA D-4?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ELYSIA D-4?
The professionals named in the filing: Architect: SAAKAAR ARCHITECTS; Architect: AJAY RAMESH MANE; Architect: ABHIJEET JAGTAP; Engineer: R C Tipnis; Engineer: TUKARAM HAMRASKAR; Chartered Accountant: R C Jain Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ELYSIA D-4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.