ELITA D3

By VIHANG INFRASTRUCTURE PVT LTD

RG-MH-45275 · RERA P51700034754 · Last updated on MahaRERA portal: 27 Jun 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 9 cases
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 12 months from the original
0 of 11Construction stages donefurthest along: Excavation, 0%
92 of 324Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

ELITA D3 is a Others project by VIHANG INFRASTRUCTURE PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700034754 on 28 Apr 2022. Possession is promised by 31 Dec 2030. The completion date has moved by 12 months from the original filing. 232 of the 324 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameELITA D3
  • TypeOthers
  • Location
    • GB CROSS ROAD THANE
    • OWALE
    • Thane (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700034754
  • ReraGenie IDRG-MH-45275

Builder

  • NameVIHANG INFRASTRUCTURE PVT LTD
  • Entity typeCompany
  • CINU45201MH2008PTC177865
  • GSTIN27AACCV9897P1Z1
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorVIHANG PRATAP SARNAIK
  • Other registrations5 more →
  • Completed1 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredApr 2022First promiseDec 2029Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2022
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 31 Dec 2029)
  • Buildings1 building record
  • Documents filed86 files

Current status

72%232 of 324 units booked

Figures as on 27 Jun 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ELITA D-3NA46413186324

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

ELITA D-3: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed160

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots160
Closed/Covered160

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,425 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI25202.48
Proposed, not sanctioned24,048 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNaupada Thane

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY RAMESH MANE
ArchitectABHIJEET JAGTAP
EngineerTUKARAM HAMRASKAR
Chartered AccountantLilani & co.
Chartered AccountantLILANI AND CO
PartnerRole in project
VIHANG INFRASTRUCTURE PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018956Dec 2029 → Dec 2030

Reason as filed by the promoterOriginally we have registered project for commercial six shop premises and project completion date was 31/12/2029 We have received the commencement certificate on 20/10/2023 for the building which is for 40th floor hence it is necessary for one year extension to the project. The commercial shops are sold and consent is taken by all shop-owners(purchasers) and till the date neither any flat is sold to any prospective purchaser not allotment letter is issued to any prospective purchaser in respect of any flat premises of the residential building Elita D-3. we have uploaded the list of sold / uns

Litigation declared9

CaseCourtStatus
1119/2012THANE CIVIL COURTfor writtenstatement
698/2010THANE CIVIL COURTexhibit hearing
699/2010THANE CIVIL COURTSUIT WITHDRAWN
342/2008THANE CIVIL COURTexhibit hearing
88/2015THANE CIVIL COURTexhibit hearing
2141/2012THANE CIVIL COURTexhibit hearing
restoration application of revision against Order 2713P-K121-J4/2013revenue ministerPENDING FOR ARGUMENT
Revision filing date 11/03/2016/2016revenue ministerCLOSE FOR ORDER
1119/2012Thane Civil CourtOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jun 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: june 2024 elita d3 form 3.pdf27 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sept 2024 elita d3 Form 3.pdf27 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: dec 2024 elita d3 form 3.pdf27 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: march 25 elita d3 form 3.pdf27 Jun 2025
Layout approvalFile: D4 Layout.pdf18 Jun 2025
Copy of Layout Approval (in case of layout)File: D4 Layout.pdf18 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ELITA FORM 2 SEPT 2024.pdf18 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ELITA FORM 2 DEC 2024.pdf18 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ELITA FORM 2 MARCH 2025.pdf18 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: D4 CC UPTO 41 FLOOR 23 04 2025.pdf18 Jun 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA FORMAT4 - COSMOS BANK .pdf13 Jun 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: RERA FORMAT B new.pdf12 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1 ELITA MARCH 25.pdf12 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ELITA FORM 1 DEC 2024.pdf6 Feb 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ELITA D-3 -Annexure -A -Separate designated account DATE 24-12-2024 .pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 24 ELITA D3.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SEPT 2024 ELITA D3.pdf23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Elita Form 2 Jun 24_compressed.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 TILL 31032024_compressed.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - Elita D-3.pdf17 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Elita D-3 annexure c.pdf17 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Elita d-3 Lilani AND co.pdf17 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Form -5 (2023).pdf1 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD- UNSOLD INVENTORY ELITA D3.pdf10 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf8 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - QUALITY ASSURANCE ENGINEEERS CERTIFICATE - 02-01-2024.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - HEMANT GOYAL.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 ANNUAL REPORT.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2A ENGINEER CERTIFICATE QUALITY ASSURANCE.pdf8 Jan 2024
Details of encumbrances concerned to FinanceFile: non encumberance certificate - LEGAL.pdf31 Dec 2023
Details of encumbrances concerned to LegalFile: non encumberance certificate - LEGAL.pdf31 Dec 2023
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf31 Dec 2023
CERSAI detailsFile: 1 CERSAI details.pdf31 Dec 2023
CERSAI detailsFile: 2 CERSAI details.pdf31 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate on Project Cost AND Fund withdrawal Form 3.pdf31 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf31 Dec 2023
Proforma of Allotment letterFile: Allotment Elita D3.pdf31 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow31 Dec 2023
Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER DEVIATION REPORT.pdf31 Dec 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT 29-12-2023.pdf31 Dec 2023
Other - LegalFile: 1 Other - Legal.pdf31 Dec 2023
Building plan approvalFile: 1.pdf30 Dec 2023
Building plan approvalFile: 2.pdf30 Dec 2023
Building plan approvalFile: 3.pdf30 Dec 2023
Building plan approvalFile: 4.pdf30 Dec 2023
Building plan approvalFile: 5.pdf30 Dec 2023
Layout approvalFile: 4 Copy of Layout Approval (in case of layout) (1).pdf30 Dec 2023
Layout approvalFile: 4 Copy of Layout Approval (in case of layout).pdf30 Dec 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT - FINAL PRINT_compressed_Part1.pdf30 Dec 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT - FINAL PRINT_compressed_Part2.pdf30 Dec 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT - FINAL PRINT_compressed_Part3.pdf30 Dec 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT - FINAL PRINT_compressed_Part4.pdf30 Dec 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT - FINAL PRINT_compressed_Part5.pdf30 Dec 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT - FINAL PRINT_compressed_Part7.pdf30 Dec 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT - FINAL PRINT_compressed_Part8.pdf30 Dec 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT - FINAL PRINT_compressed_Part9.pdf30 Dec 2023
Details of encumbrancesFile: LEGAL TITLE REPORT - FINAL PRINT_compressed_Part10.pdf30 Dec 2023
Copy of Layout Approval (in case of layout)File: 4 Copy of Layout Approval (in case of layout) (1).pdf30 Dec 2023
Copy of Layout Approval (in case of layout)File: 4 Copy of Layout Approval (in case of layout).pdf30 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf30 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf30 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf30 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf30 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf30 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE - VALLEY BUILDING D-3 DATE 20-10-2023 -.pdf30 Dec 2023
Proforma of Agreement for saleFile: DRAFT OF FSA-ELITA- RERA-30-12-2023.pdf30 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate - -ELITA Commercial D- 3 22-04-2022_compressed_compressed.pdf25 Apr 2022
Layout approvalFile: LAYOUT.pdf22 Apr 2022
Building plan approvalFile: BUILDING PLAN 1.pdf22 Apr 2022
Building plan approvalFile: BUILDING PLAN.pdf22 Apr 2022
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 1.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf22 Apr 2022
Declaration in FORM BFile: Declaration Elita.pdf22 Apr 2022
Proforma of Allotment letterFile: Undertaking Elita.pdf22 Apr 2022
PAN CardFile: PAN CARD VIHANG INFRA PVT LTD.pdf21 Apr 2022
Copy of the legal title reportFile: Title Certificate valley D-2 - Date 07-03-2022_Part 1.pdf21 Apr 2022
Copy of the legal title reportFile: Title Certificate valley D-2 - Date 07-03-2022_ Part2.pdf21 Apr 2022

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 not delivered by the promised date3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
ELYSIA D-4P51700080101VILLAGE OVALE, Thane317Apr 2025Certificate SignedDec 2031Not due yet
Evana D-2P51700034145THANE, Thane326Mar 2022OngoingDec 2029Not due yet
vihang valleyP51700007077owale, Thane-Aug 2017CompletedDec 2026Dec 2019
METRO HIVE D-1P51700020335OVALE, Thane180Apr 2019OngoingDec 2026Not due yet
COMMERCIAL BUILDING 10P51700046036OVALE VILLAGE, Thane2Jun 2022OngoingDec 2025Registered original: Dec 2024Not delivered

How this compares with Thane

72%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ELITA D3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OWALE7,600+ in Thane

2 kmELITA D3Completed 75Lapsed / revoked 25Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 148 registered projects within 2 km.

Builder: VIHANG INFRASTRUCTURE PVT LTD

VIHANG INFRASTRUCTURE PVT LTD has 6 registrations on MahaRERA, including vihang valley and METRO HIVE D-1. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ELITA D3 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ELITA D3?

The registered promoter entity is VIHANG INFRASTRUCTURE PVT LTD, a company as per the filing. Its CIN U45201MH2008PTC177865 and GSTIN 27AACCV9897P1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ELITA D3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ELITA D3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ELITA D3?

The professionals named in the filing: Architect: AJAY RAMESH MANE; Architect: ABHIJEET JAGTAP; Engineer: TUKARAM HAMRASKAR; Chartered Accountant: Lilani & co.; Chartered Accountant: LILANI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ELITA D3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ELITA D3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ELITA D3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.