Home / Browse projects / Thane, Maharashtra / vihang valley

Completed No litigation declared Residential / Group Housing project

vihang valley

By VIHANG INFRASTRUCTURE PVT LTD

RG-MH-20241 · RERA P51700007077 · Last updated on MahaRERA portal: 8 Apr 2025

Source: official MahaRERA filing

Red flags

  • 49 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
43 of 88Construction stages doneacross 8 buildings; furthest along: Podiums (if any), 90%
49Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

vihang valley is a Residential / Group Housing project by VIHANG INFRASTRUCTURE PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700007077 on 17 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2026. 49 complaints are on record with the regulator.

At a glance

Project

  • Namevihang valley
  • TypeResidential / Group Housing
  • Location
    • ghodbunder cross road
    • owale
    • Thane (M Corp.)
    • Thane
    • 400601
  • Pincode400601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700007077
  • ReraGenie IDRG-MH-20241

Builder

  • NameVIHANG INFRASTRUCTURE PVT LTD
  • Entity typeCompany
  • CINU45201MH2008PTC177865
  • GSTIN27AACCV9897P1Z1
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorVIHANG PRATAP SARNAIK
  • Other registrations5 more →
  • Completed1 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2017PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings8 building records
  • Documents filed44 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
H-1NA240000
H-2NA240000
H-3NA240000
H-4NA240000
D-1NA130000
D-2NA60000
D-3NA120000
D-4NA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 8 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

43 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Podiums (if any), at 90%.

H-1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H-2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H-399%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)90%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H-4100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D-10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D-20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D-30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D-40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed332

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots332
Closed/Covered332
BuildingClosed/CoveredTotal
H-13636
H-21111
H-33232
H-43737
D-16262
D-24646
D-34646
D-46262

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area72,895 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI57097.35
Proposed, not sanctioned21,176 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchshop no 1,2,3 vihang garden, opposite raymond, vartak nagar, thane

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIL JAGWANI TEN FOLDS
ArchitectKAUSTUBH JAGDISH SATAM
ArchitectSaakaar Architects
EngineerRCTIPNIS
PartnerRole in project
VIHANG INFRASTRUCTURE PVT LTD-

Litigation declared10

CaseCourtStatus
386/2011CIVIL COURT THANEDISMISSED FOR DEFAULT
1119/2012Thane CJSDfor filing of written statement
698/2010Thane CJSD Thaneexhibit hearing
699/2010Thane CJSD ThaneSUIT WITHDRAWN
Special civil Suit no 342 /2008Thane CJSD Thaneexhibit hearing
SPECIAL CIVIL SUIT no 88/2015Thane CJSD Thaneexhibit hearing
RCS 2141/2012Thane CJSD Thaneargument
RCS 323/2005Thane CJSD Thaneproject survey numbers are deleted from the suit
restoration applicaiton against order passed in revision against order 2713P-K121- J4/2013restoration application of revision before revenue minister state of maharashtrapending for argument
REVISION FILING DATE 11/03/016 BY JANARDAN BAMA KINI/2016revision before revenue minister against the order of RTS REVISION applicationFOR ORDER

Complaints filed with MahaRERA49

Case no.ComplainantRespondentFiled
CC006000000089524ASHOK RADHESHYAM AGARWALVIHANG INFRASTRUCTURE PVT LTD29/05/2019
CC006000000195709Rupali GiriVihang Infrastucture Pvt ltd21/01/2021
CC006000000196433Mahesh Patil Rajani PatilVihang Infrastructure pvt.ltd.22/03/2021
CC006000000196595Meghraj Jayant DesaiVihang Infrastructure Private Limited02/04/2021
CC006000000196811Sandeep Dashrath KorgaonkarVihang Infrastructure Private Limited24/04/2021
CC006000000196828Supriya Mandar SawantVihang Infrastructure Private Limited26/04/2021
CC006000000196837Sagar Shankar PatilVihang Infrastructure Private Limited27/04/2021
CC006000000196868Hemantkumar Sadashiv ChavanVihang Infrastructure Private Limited30/04/2021
CC006000000197255Mrs. Kiran Nilesh Hingu and Mr. Nilesh Amubhai HinguYogesh Kishore Chandegala, Company Director19/06/2021
CC006000000197278Dr. Sandesh Ravindra Kene and Dr. Mrs. Vaishali Sandesh KeneVihang Infrastructure Pvt. Ltd22/06/2021
CC006000000197283Mr. Prashant Prakash Joshi and Mrs. Preeti Prashant JoshiVihang Infrastructure Pvt. Ltd23/06/2021
CC006000000197286RAJAT KUMAR MOHANTY AND MRS. LEENA PALVIHANG INFRASTRUCTURE PVT LTD21/06/2021
CC006000000197302MR. SURESH LALJI MANANI AND MRS. JAYSHREE SURESH MANANIYOGESH CHADEGALA21/06/2021
CC006000000197315MR. PRABHAKAR DATTATRAY KANOJEYOGESH CHADEGALA19/06/2021
CC006000000197338MR. DILIP YADAV AND MRS SONAL YADAVVIHANG INFRASTRUCTURE PVT LTD21/06/2021
CC006000000197343RAMESH DIVAKARAN NAIR AND MRS. SINI K. GOPALAKRISHAN PILLAIVIHANG INFRASTRUCTURE PVT LTD22/06/2021
CC006000000197346MR. MANOJ GODERAM THORAT AND MRS. BHARTI MANOJ THORATVIHANG INFRASTRUCTURE PVT LTD21/06/2021
CC006000000197347MRS. BHAKTI DINESH RANE AND UDAY GANPAT HADKARVIHANG INFRASTRUCTURE PVT LTD21/06/2021
CC006000000197361RAMESH CHANDER JAGATRAM SHARMA AND MEENA RAMESH CHANDERVIHANG INFRASTRUCTURE PVT LTD22/06/2021
CC006000000197365Mrs. Sunanda Pratap Shewate and Mr. Pratap Narayan ShewateVihang Valley Infrastructure Pvt. Ltd29/06/2021
CC006000000197367Mr. Chetan Bhaskar Ghangrekar and Mrs. Pranjala Chetan GhangrekarVIHANG INFRASTRUCTURE PVT LTD23/06/2021
CC006000000197368MR. SUDEEP SHRAVAN SHARMA AND MRS. PRIYANKA SUDEEP SHARMAVIHANG INFRASTRUCTURE PVT LTD06/07/2021
CC006000000197374PRATIKSHA VILAS SHENDE AND MR. VILAS SHENDEVIHANG INFRASTRUCTURE PVT LTD23/06/2021
CC006000000197377MR. PRAKASH APPA NAIK AND MRS. PRAJAKTA PRAKASH NAIKVIHANG INFRASTRUCTURE PVT LTD24/06/2021
CC006000000197379MR. RAJESH VADHAN PILLAI AND HEMA RAJESH PILLAIVIHANG INFRASTRUCTURE PVT LTD25/06/2021
CC006000000197394MR. RAM KRISHNA MISHRA AND MRS. CHITRA MISHRAVIHANG INFRASTRUCTURE PVT LTD25/06/2021
CC006000000197427MR. THORAT NILESH RAGHUNATH AND MRS. THORAT SUVARNA NILESHVIHANG INFRASTRUCTURE PVT LTD29/06/2021
CC006000000197437ATUL PRABHAKAR PATILVIHANG INFRASTRUCTURE PVT LTD02/07/2021
CC006000000197444SACHIN SADASHIVRAO BALLALVIHANG INFRASTRUCTURE PVT LTD03/07/2021
CC006000000197460MR. RINKESH MEHTA AND MRS. DEEPMALA MEHTAVIHANG INFRASTRUCTURE PVT LTD17/07/2021
CC006000000197466ALKA MANOHAR KACHANE AND PARAG MANOHAR KACHANEVIHANG INFRASTRUCTURE PVT LTD03/07/2021
CC006000000197473MR. SACHIN MORE AND MRS. KARTIKI SACHIN MOREVIHANG INFRASTRUCTURE PVT LTD06/07/2021
CC006000000197474ANURAG SONPALIVIHANG INFRASTRUCTURE PVT LTD27/07/2021
CC006000000197481MR. JOHN PRAKASH DSOUZA AND MRS. JULIANA D SOUZAVIHANG INFRASTRUCTURE PVT LTD23/07/2021
CC006000000197563MRS. SARALA YOGARAJ PATIL MR. YOGRAJ JANARDAN PATIL MRS. MEENAL TEJAS GHONGADI MS. GAYATRI YOGARAJVIHANG INFRASTRUCTURE PVT LTD12/07/2021
CC006000000197602MR. RAHUL SURANA AND MRS. ADITI SURANAVIHANG INFRASTRUCTURE PVT LTD16/07/2021
CC006000000198018MR. MORTAPPA S. KUDARIVIHANG INFRASTRUCTURE PVT LTD08/09/2021
CC006000000198209MR. BORSE VINOD SAHEBRAO AND MRS. KAVITA VINOD BORSEVIHANG INFRASTRUCTURE PVT LTD10/09/2021
CC006000000198212Mr. Dinesh Hargovind Panchal and Mrs. Jyotsna Dinesh PanchalVIHANG INFRASTRUCTURE PVT LTD27/09/2021
CC006000000198291MRS. SHALAKA PRITESH GOKHALE AND MR. PRITESH ASHOK GOKHALEVIHANG INFRASTRUCTURE PVT LTD20/09/2021
CC006000000198472MRS. KAMAKSHI HARSHAL BADHE AND MR. HARSHAL SURESH BADHEVIHANG INFRASTRUCTURE PVT LTD04/10/2021
CC006000000198484MR. CHITTARANJAN SAHOOVIHANG INFRASTRUCTURE PVT LTD04/10/2021
CC006000000198777VIKAS G. MALI AND MRS. NIRMALA VIKAS MALIVIHANG INFRASTRUCTURE PVT LTD27/01/2022
CC006000000198915MR. DEEPAK SHIVAJI JADHAVVIHANG INFRASTRUCTURE PVT LTD09/11/2021
CC006000000209958MR. SANJAY PANGERKAR AND MRS. NETRA SANJAY PANGERKARVIHANG INFRASTRUCTURE PVT LTD09/02/2022
CC006000000197413ANISH GAURIHAR POREVIHANG INFRASTRUCTURE PVT LTD25/06/2021
CC006000000197485Rahul WalawalkarVihang Infrastructure Pvt Ltd18/07/2021
CC006000000209863Vinayak Devdas KamathVihang Infrastructure Pvt Ltd21/04/2022
CC006000000231249rupak kumar dandpatVihang infrastructure pvt ltd23/05/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 May 2022

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Vihang Valley 19-20.pdf8 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5- Vihang Valley 20-21.pdf8 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5- Vihang Valley 21-22.pdf8 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Vihang Valley 22-23.pdf8 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- Vihang Valley 23-24.pdf8 Apr 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 VALLEY.pdf13 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC CERTIFICATE - 20TH FLOORS -Dated-20-5-2022.pdf20 May 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certifcate VALLEY 3.pdf11 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Valley Phase 3 Occupation Certificate.pdf11 Feb 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation - Undertaking- valley -3- upload_compressed.pdf21 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM -2A- Valley eng certi.pdf5 Sep 2020
OtherFile: disclosure for building D-1 To D-4.pdf2 Apr 2019
Certificates of CA (Form 5)File: FORM 5 VIHANG VALLEY.pdf23 Mar 2019
Certificates of CA (Form 5)File: FORM 5 VIHANG VALLEY-2018.pdf23 Mar 2019
OtherFile: EXHIBIT 264 ORDER.pdf8 Jun 2018
OtherFile: SEVEN TWELVE EXTRACTS.pdf8 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: V VALLEY C C.pdf11 May 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: VALLEY- 3 - Letter calling for Compliance for Society formation.pdf11 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certifcate Dated-26-7-2017 -valley.pdf17 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certifcate Dated-05-11-2017 -valley.pdf17 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engi Certificate 24-07-17.pdf15 Sep 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Achitect R-1 date 14-09-17-R1.pdf14 Sep 2017
OtherFile: area certificate acrchitect.pdf14 Sep 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Valley Engineers Certificate.pdf29 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER-VIHANG VALLEY.pdf29 Jul 2017
Proforma of Allotment letterFile: FSA-VIHANG VALLEY - DRAFT.pdf29 Jul 2017
OtherFile: S P ENTERPRISES VALLEY CERTIFICATE.pdf29 Jul 2017
OtherFile: Valley Engineers Certificate.pdf29 Jul 2017
OtherFile: VALLEY LAYOUT PROPOSED.pdf29 Jul 2017
OtherFile: EXIBIT 5 PART 1.pdf29 Jul 2017
OtherFile: EXIBIT 5 PART 2.pdf29 Jul 2017
Copy of the legal title reportFile: suppli of Title.pdf28 Jul 2017
Copy of the legal title reportFile: Title Certifiate Vihang Valley_Part1.pdf28 Jul 2017
Copy of the legal title reportFile: Title Certifiate Vihang Valley_Part2.pdf28 Jul 2017
OtherFile: EXH 246 Modification appli of Exh 5 Order 323 IN 2005.pdf28 Jul 2017
Certificates of CA (Form 3)File: RERA - CA CERTIFICATE VALLEY.pdf27 Jul 2017
Details of encumbrancesFile: valley- non encumberance certificate.pdf26 Jul 2017
Declaration in FORM BFile: Form-B - VIHANG VALLEY-.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate-valley.pdf26 Jul 2017
Building plan approvalFile: V VALLEY IOD.pdf25 Jul 2017
Layout approvalFile: VALLEY - LAYOUT- UPLOAD.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: VALLEY - LAYOUT- UPLOAD.pdf25 Jul 2017
Building Plan Approval (IOD)File: V VALLEY IOD.pdf25 Jul 2017
PAN CardFile: vihang infra- pan card.pdf24 Jul 2017

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
ELYSIA D-4P51700080101VILLAGE OVALE, Thane317Apr 2025Certificate SignedDec 2031Not due yet
ELITA D3P51700034754OWALE, Thane324Apr 2022OngoingDec 2030Registered original: Dec 2029Not due yet
Evana D-2P51700034145THANE, Thane326Mar 2022OngoingDec 2029Not due yet
METRO HIVE D-1P51700020335OVALE, Thane180Apr 2019OngoingDec 2026Not due yet
COMMERCIAL BUILDING 10P51700046036OVALE VILLAGE, Thane2Jun 2022OngoingDec 2025Registered original: Dec 2024Not delivered

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep vihang valley on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near owale7,600+ in Thane

2 kmvihang valleyCompleted 74Lapsed / revoked 25Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 148 registered projects within 2 km.

Builder: VIHANG INFRASTRUCTURE PVT LTD

VIHANG INFRASTRUCTURE PVT LTD has 6 registrations on MahaRERA, including vihang valley and METRO HIVE D-1. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if vihang valley is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of vihang valley?

The registered promoter entity is VIHANG INFRASTRUCTURE PVT LTD, a company as per the filing. Its CIN U45201MH2008PTC177865 and GSTIN 27AACCV9897P1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in vihang valley?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against vihang valley?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for vihang valley?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at vihang valley?

The professionals named in the filing: Architect: ANIL JAGWANI TEN FOLDS; Architect: KAUSTUBH JAGDISH SATAM; Architect: Saakaar Architects; Engineer: RCTIPNIS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in vihang valley?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About vihang valley. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save vihang valley to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.