Home / Browse projects / Aurangabad, Maharashtra / VIYAAN ANANTA PHASE II
VIYAAN ANANTA PHASE II
RG-MH-33940 · RERA P51500035035 · Last updated on MahaRERA portal: 20 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VIYAAN ANANTA PHASE II is a Residential / Group Housing project by RIDDHI VIYAAN VENTURES in Aurangabad, Maharashtra, registered with MahaRERA as P51500035035 on 29 Apr 2022. Possession is promised by 31 Mar 2027. 61 of the 120 units on this registration are recorded sold or booked, and 30 of 55 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameVIYAAN ANANTA PHASE II
- TypeResidential / Group Housing
- Location
- BEED BY PASS
- SATARA
- Aurangabad (M Corp.)
- Aurangabad
- 431002
- Pincode431002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500035035
- ReraGenie IDRG-MH-33940
Builder
- NameRIDDHI VIYAAN VENTURES
- Entity typePartnership
- PartnersVISHAL JAWAHARLAL BOHRA, LAVINESH MOHAN DAYALANI
- Other registrations2 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Apr 2022
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings5 building records
- Documents filed72 files
Current status
Figures as on 20 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ROW BUNGLOW TYPE I | NA | 4 | 3 | 13 | 0 | 13 |
| ROW BUNGLOW TYPE J | NA | 4 | 3 | 9 | 0 | 9 |
| BUILDING K1 WING | NA | 9 | 7 | 28 | 0 | 28 |
| BUILDING K2 WING | NA | 9 | 7 | 42 | 0 | 42 |
| BUILDING H WING | NA | 9 | 7 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
ROW BUNGLOW TYPE I81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
ROW BUNGLOW TYPE J74%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
BUILDING K1 WING73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
BUILDING K2 WING73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
BUILDING H WING67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed5
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| ROW BUNGLOW TYPE I | 1 | 1 |
| ROW BUNGLOW TYPE J | 1 | 1 |
| BUILDING K1 WING | 1 | 1 |
| BUILDING K2 WING | 1 | 1 |
| BUILDING H WING | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANOJ KALA AND ASSOCIATES |
| Architect | ARCH MANOJ KALA |
| Engineer | CORE CONSULTANT |
| Engineer | ER BALASAHEB DEVKATE |
| Chartered Accountant | Bangad Parjane and Co |
| Chartered Accountant | R D PATHAN & ASSOCIATES |
| Chartered Accountant | JAIN and GANGWAL |
| Partner | Role in project |
|---|---|
| RIDDHI VIYAAN VENTURES | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600100 | Mrinal Katkar | RIDDHI VIYAAN VENTURES | 28/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form-1 March 26.pdf | 20 Jun 2026 |
| Form 2File: Form-2 March 26.pdf | 20 Jun 2026 |
| Form 3File: Form-3 March 26.pdf | 20 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold March 26.pdf | 20 Jun 2026 |
| Form 2A (FY 2022-2023)File: Form-2A 22-23.pdf | 13 May 2026 |
| Form 2A (FY 2023-2024)File: Form-2A 23-24.pdf | 13 May 2026 |
| Form 2A (FY 2024-2025)File: Form-2A 24-25.pdf | 13 May 2026 |
| Form 2A (FY 2025-2026)File: Form-2A 25-26.pdf | 13 May 2026 |
| Form 1File: Ananta Ph-II Form-1 Sep 25.pdf | 26 Feb 2026 |
| Form 2File: Ananta Ph-II Form-2 Sep 25.pdf | 26 Feb 2026 |
| Form 3File: Ananta Ph-II Form-3 Sep 25.pdf | 26 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Ananta Ph-II Sold Sep 25.pdf | 26 Feb 2026 |
| Form 1File: Form-1 Dec 25.pdf | 20 Jan 2026 |
| Form 2File: Form-2 Dec 25.pdf | 20 Jan 2026 |
| Form 3File: Form-3 Declaration Dec 25.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Dec 25.pdf | 20 Jan 2026 |
| Form 1File: Form-1 June 25.pdf | 23 Aug 2025 |
| Form 2File: Form-2 June 25.pdf | 23 Aug 2025 |
| Form 3File: Form-3 Declaration June 25.pdf | 23 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold June 25.pdf | 23 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Viyaan Ananta Phase-2 Form-1 March 25.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 VIYAAN ANANTA PHASE- 2.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTI - P-2 Q-4 FY 24-25.pdf | 21 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - FY 23-24 PHASE II- 219022025.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form-1 mar 24.pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form-1 Jun 24.pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form-1 Sep 24.pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form-1 Dec 24.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form-3 Mar 24.pdf | 1 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form-3 Jun 24.pdf | 1 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form-3 Sep 24.pdf | 1 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form-3 Dec 24.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form-2 Sep 24.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form-2 Dec 24.pdf | 1 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A 23-24.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form-2 Mar 24.pdf | 30 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form-2 Jun 24.pdf | 30 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM - 5 (PHASE -2 (NEW)02052024.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Viyaan Ananta Form-1 Phase-2 11-oct-23.pdf | 17 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Viyaan Ananta Form-1 Phase-2 12-jan-24.pdf | 17 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Viyaan Ananta Form-2 phase-2 11-oct-23.pdf | 17 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Viyaan Ananta Form-2 Phase-2 14-Jan-24.pdf | 17 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Viyaan Ananta Discolser 31-dec-23 Phase-2.pdf | 17 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Viyaan Ananta Form-3 phase-2 10-Jan-24.pdf | 17 Feb 2024 |
| Details of encumbrancesFile: FIN ENC Ananta (P-2).pdf | 26 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CER Phase II MARCH.pdf | 25 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CER PHASE II JUNE 2023.pdf | 25 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Phase-II ( 10-07-2023 ).pdf | 25 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 ( 10-07-2023 ).pdf | 25 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PHASE II ( 2022-23 ).pdf | 25 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate ( Phase II )_compressed.pdf | 25 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Discloser Ananta P-2 31-03-2023.pdf | 28 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Discloser Ananta P-2 31-07-2023.pdf | 28 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Account PHASE 2.pdf | 18 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 RIDDHI.pdf | 27 Apr 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200235808127_For_Asset_Based_Search_25_04_2022_16_19_30_326.pdf | 25 Apr 2022 |
| Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf | 25 Apr 2022 |
| Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf | 25 Apr 2022 |
| Layout approvalFile: Sacntion Plan-1_compressed.pdf | 20 Apr 2022 |
| Building plan approvalFile: Sacntion Plan-3_compressed.pdf | 20 Apr 2022 |
| Building plan approvalFile: Sacntion Plan-4_compressed.pdf | 20 Apr 2022 |
| Building plan approvalFile: Sacntion Plan-5_compressed.pdf | 20 Apr 2022 |
| PAN CardFile: 1 PAN Card.pdf | 20 Apr 2022 |
| Copy of the legal title reportFile: SEARCH REPORT PHASE II_compressed.pdf | 20 Apr 2022 |
| Details of encumbrancesFile: Riddhi Viyaan Ventures Letterhead.pdf | 20 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: Sacntion Plan-1_compressed.pdf | 20 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sacntion Plan-3_compressed.pdf | 20 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sacntion Plan-4_compressed.pdf | 20 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sacntion Plan-5_compressed.pdf | 20 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMM CERT_compressed.pdf | 20 Apr 2022 |
| Declaration about Commencement CertificateFile: Riddhi Viyaan Ventures Format D.pdf | 20 Apr 2022 |
| Declaration in FORM BFile: Riddhi Viyaan Ventures Form B_compressed.pdf | 20 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VIYAAN ANANTA PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SATARA1,400+ in Aurangabad
Filed coordinates, straight-line distance. 59 registered projects within 2 km.
Construction of 1056 EWS Tenements on Gut No 9
AURANGABAD HOUSING AND AREA DEVELOPMENT BO
PMAY U PADEGAON
M/s Laxmi JV
Khinvasara City
Ravindra Champalal Khinvasara
SHRI GOVINDAM HEIGHTS
SHREE VYANKATESHA INFRA
GANGOTRI VIHAR PHASE I
INSPIRA REALTY LLP
SARA SAPHIRE PH - I
APEX PROPERTIES
See every Aurangabad project, with the district possession charts
Builder: RIDDHI VIYAAN VENTURES
RIDDHI VIYAAN VENTURES has 3 registrations on MahaRERA, including VIYAAN ANANTA and VIYAAN ANANTA PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if VIYAAN ANANTA PHASE II is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VIYAAN ANANTA PHASE II?
The registered promoter entity is RIDDHI VIYAAN VENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VIYAAN ANANTA PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VIYAAN ANANTA PHASE II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VIYAAN ANANTA PHASE II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VIYAAN ANANTA PHASE II?
The professionals named in the filing: Architect: MANOJ KALA AND ASSOCIATES; Architect: ARCH MANOJ KALA; Engineer: CORE CONSULTANT; Engineer: ER BALASAHEB DEVKATE; Chartered Accountant: Bangad Parjane and Co; Chartered Accountant: R D PATHAN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VIYAAN ANANTA PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.