Bliss
RG-MH-85934 · RERA PR1330002601615 · Last updated on MahaRERA portal: 3 Aug 2026
Source: official MahaRERA filing
Red flags
- Litigation declared, 1 case
- Encumbrance declared on the project land
- Allotment letter deviates from the model form
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 19 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 9 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Bliss is a Residential / Group Housing project by Kapstone Constructions Private Limited in Thane, Maharashtra, registered with MahaRERA as PR1330002601615 on 21 Aug 2026. Possession is promised by 31 Mar 2029.
At a glance
Project
- NameBliss
- TypeResidential / Group Housing
- Location
- Majiwada
- Majiwada Thane West
- Majiwade
- Thane
- 400601
- Pincode400601
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR1330002601615
- ReraGenie IDRG-MH-85934
Builder
- NameKapstone Constructions Private Limited
- Entity typeCompany
- CINU45200MH2003PTC140091
- GSTIN27AACCK3513FIZW
- Track record21 past projects →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Aug 2026
- Promised completion31 Mar 2029
- Revised completionNone
- Buildings1 building record
- Documents filed9 files
Current status
Figures as on 3 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SOCIAL HOUSING BLDG WING A | NA | 44 | 42 | 558 | 0 | 558 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing.
SOCIAL HOUSING BLDG WING A: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | 0% |
Parking filed548
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details.
| Landowner | Village | District |
|---|---|---|
| Vijay Rajasingh Varma | Mumbai City | Mumbai City |
| Manish Shah | - | Mumbai City |
| KDM Enterprises | Ghatkopar | Mumbai Suburban |
| JSK Private Trust | Juhu | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANISH SAVANT |
| Engineer | Paresh Patil |
| Chartered Accountant | V A Shimpi |
| Partner | Role in project |
|---|---|
| Kapstone Constructions Private Limited | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| Misc Civil Application No 491 /2017 | Civil Court Senior Division, Thane | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
Documents filed9
As listed on the registration. The files themselves are on the MahaRERA portal.
| Document | Uploaded |
|---|---|
| Annexure A - Declaration cum Undertaking of Promoter | 3 Aug 2026 |
| 01_Layout | 1 Aug 2026 |
| 02_Layout Social Houing | 1 Aug 2026 |
| 03_Basement SH-A | 1 Aug 2026 |
| 04_Stilt SH-A | 1 Aug 2026 |
| 05_Typical Floor Plan SH A | 1 Aug 2026 |
| 06_Typical Floor Plan - 1_SH-A | 1 Aug 2026 |
| 07 Plan | 1 Aug 2026 |
| 08_Section plan SH-A | 1 Aug 2026 |
Promoter's earlier projects21
As disclosed by the promoter in this filing.
| Project | Status | Promised | Delivered | Litigation |
|---|---|---|---|---|
| Rustomjee Azziano ABC | Completed | Dec 2016 | Mar 2016 | No |
| Rustomjee Atelier | Completed | Jun 2016 | Mar 2016 | No |
| Rustomjee Acura | Completed | Dec 2013 | Late, Oct 2014 | No |
| Rustomjee Astraea | Completed | Dec 2009 | Late, Jan 2014 | No |
| RUSTOMJEE LA FAMILIA - WING A | Ongoing | Dec 2026 | Not delivered | No |
| RUSTOMJEE LA FAMILIA - WING B | Ongoing | Dec 2026 | Not delivered | No |
| RUSTOMJEE LA FAMILIA- WING C | Ongoing | Jun 2027 | Not delivered | No |
| RUSTOMJEE LA VIE WING A | Ongoing | Dec 2028 | Not delivered | No |
| RUSTOMJEE LA VIE WING B | Ongoing | Feb 2029 | Not delivered | No |
| RUSTOMJEE LA VIE WING C | Ongoing | Feb 2029 | Not delivered | No |
| RUSTOMJEE VERDANT VISTAS WING A | Ongoing | Jan 2030 | Not delivered | No |
| RUSTOMJEE VERDANT VISTAS WING B | Ongoing | Feb 2030 | Not delivered | No |
| Rustomjee Azziano Wing D | Completed | Mar 2025 | Mar 2025 | No |
| RUSTOMJEE AZZIANO WING E | Completed | Feb 2023 | Feb 2023 | No |
| Rustomjee Azziano Wing F | Completed | Mar 2019 | Mar 2019 | No |
| Rustomjee Azziano Wing G | Completed | Mar 2019 | Mar 2019 | No |
| Rustomjee Azziano Wing H | Completed | May 2019 | May 2019 | No |
| Rustomjee Azziano Wing I | Completed | Dec 2020 | Dec 2020 | No |
| Rustomjee Azziano Wing J | Completed | Mar 2019 | Mar 2019 | No |
| Rustomjee Azziano Wing K | Completed | Sep 2022 | Sep 2022 | No |
| Rustomjee Azziano Wing L | Completed | Mar 2025 | Mar 2025 | No |
How this compares with Thane
Computed across the 7,552 Thane projects on ReraGenie, from their own filings.
Track Bliss
Save this project to your account and get an email when its filing changes: status, dates, complaints, new documents. Free during the pilot beta.
Other projects near Majiwada Thane West7,552 in Thane
ASHAR PULSE
Ms ASHAR VENTURES
SHETH ZURI
Sheth Developers Private Limited
Jagdale Edge
JAGDALE INFRASTRUCTURE PVT. LTD.
RUSTOMJEE LA VIE Wing D
Kapstone Constructions Private Limited
Thane Project
LODHA DEVELOPERS LIMITED
Embassy One Thane - 1A 1B 1C
Tapir Constructions Limited
See every Thane project, with the district possession charts
Builder: Kapstone Constructions Private Limited
Kapstone Constructions Private Limited has 20 registrations on MahaRERA, including Rustomjee Azziano Wing F and Rustomjee Azziano Wing G. Its filings disclose 21 earlier MahaRERA projects: 11 of 13 past projects completed on time. Litigation is declared on 10 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Bliss is delayed beyond 31 Mar 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Bliss?
The registered promoter entity is Kapstone Constructions Private Limited, a company as per the filing. Its CIN U45200MH2003PTC140091 and GSTIN 27AACCK3513FIZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Bliss?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Bliss?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Bliss?
The professionals named in the filing: Architect: MANISH SAVANT; Engineer: Paresh Patil; Chartered Accountant: V A Shimpi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Bliss?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.