Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2030Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
192 of 192Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

RUSTOMJEE VERDANT VISTAS WING A is a Residential / Group Housing project by Kapstone Constructions Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700077136 on 23 Jul 2024. Possession is promised by 18 Jan 2030. 0 of the 192 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameRUSTOMJEE VERDANT VISTAS WING A
  • TypeResidential / Group Housing
  • Location
    • Majiwade
    • Majiwade Thane West
    • Thane (M Corp.)
    • Thane
    • 400601
  • Pincode400601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700077136
  • ReraGenie IDRG-MH-18562

Builder

  • NameKapstone Constructions Private Limited
  • Entity typeCompany
  • CINU45200MH2003PTC140091
  • GSTIN27AACCK3513FIZW
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsPercy Chowdhry, Boman Irani
  • Other registrations19 more →
  • Completed10 of 20
  • Declared earlier projects21 →

Key dates

this monthRegisteredJul 2024PromisedJan 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jul 2024
  • Promised completion18 Jan 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

0%0 of 192 units booked

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA53531920192

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Wing A: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities29

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Letter box areaYes0%
Lift lobby and staircasesYes0%
U.G + O.H Tank and pump roomYes0%
Terrace with amenitiesYes0%
Society officeYes0%
Recreational Floor with amenitiesYes0%
One Fire liftYes0%
Multipurpose courtYes0%
Common toilet for utility staffYes0%
Lap pool with pool deck & kids pool & Silhouette poolYes0%
BMS roomYes0%
DG Set for common area lighting and firefighting pumpsYes0%
Elevators for Passenger and ServiceYes0%
Entrance LobbyYes0%

Parking filed596

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots596
Closed/Covered596

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,239 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jun 2026
LandownerVillageDistrict
Transcon Sheth Creators Pvt. Ltd.AndheriMumbai Suburban
KMD EnterprisesKurlaMumbai Suburban
Manish ShahMumbai CityMumbai City
Vijaysingh Rajasingh VarmaAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityTMC
Permissible FSI43513.5
Proposed, not sanctioned43,514 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCrescenzo Building, Bandra Kurla Complex, Bandra East Mumbai 400 051

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManish Savant
EngineerMehul Shah
Chartered AccountantV A Shimpi
PartnerRole in project
Kapstone Constructions Private Limited-

Litigation declared2

CaseCourtStatus
Misc Civil Application No 491 0f 2017/2017Thane Civil CourtOngoing
491/2017Thane Civil CourtOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 18 Jan 2030

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Verdant Vista Wing A.pdf28 Apr 2026
Form 2File: Verdant Vista A.pdf28 Apr 2026
Form 3File: Verdant Vista A.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Verdant Vista A.pdf28 Apr 2026
Form 1File: Verdant Vista A.pdf4 Feb 2026
Form 2File: Verdant Vista A.pdf4 Feb 2026
Form 3File: Verdant Vista Wing A.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: Verdant Vista A.pdf4 Feb 2026
Form 1File: Verdant Vistas Wing A.pdf24 Dec 2025
Form 2File: Verdant Vistas Wing A.pdf24 Dec 2025
Form 3File: Verdant Vistas A.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Verdant Vista A.pdf24 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 Verdant Vistas A Wing.pdf28 Sep 2025
Form 1File: Form 1 - Verdant Vistas wing A.pdf12 Sep 2025
Form 2File: Form 2 - Verdant Vistas A.pdf12 Sep 2025
Form 3File: Form 3 - Verdant Vistas A.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory - Verdant Vista A Wing.pdf12 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Verdant Vistas Wing A.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Verdant Vistas A.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Verdant Vistas Wing A.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Verdant Vistas Wing A_11zon.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate january 2025.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate V V WING A September 2024.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate January 2025.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vardant Vistas A.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Verdant Vistas_Wing A.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vardant Vistas A.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Verdant Vistas Wing A Form 3.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Verdant Vistas Wing A Form 2.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclsoure requirment.pdf5 Jul 2024
Other - TechnicalFile: basement 1.pdf5 Jul 2024
Other - TechnicalFile: basement 2.pdf5 Jul 2024
Other - TechnicalFile: basement 3.pdf5 Jul 2024
Other - TechnicalFile: basement 4.pdf5 Jul 2024
Other - TechnicalFile: basement Section.pdf5 Jul 2024
Other - TechnicalFile: 1 Other - Legal.pdf4 Jul 2024
Proforma of Agreement for saleFile: AFS Wing A (Higlighted Revised Copy) Final rera upload.pdf30 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Verdant Vistas Wing A-1-12.pdf30 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Verdant Vistas Wing A-13-24.pdf30 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Verdant Vistas Wing A-25-36.pdf30 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Verdant Vistas Wing A-37-48.pdf30 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Verdant Vistas Wing A-49-58.pdf30 Jun 2024
Layout approvalFile: Layout approval wing A - highlighted.pdf29 Jun 2024
Building plan approvalFile: 06.pdf29 Jun 2024
Building plan approvalFile: 07.pdf29 Jun 2024
Building plan approvalFile: 08.pdf29 Jun 2024
Building plan approvalFile: 09.pdf29 Jun 2024
Building plan approvalFile: 10.pdf29 Jun 2024
Building plan approvalFile: 11.pdf29 Jun 2024
Layout approvalFile: Layout-01_rotated.pdf29 Jun 2024
Copy of the legal title reportFile: Format A La Felicita Wing A.pdf29 Jun 2024
Copy of the legal title reportFile: Title Report La Frelicita.pdf29 Jun 2024
Copy of Layout Approval (in case of layout)File: Layout approval wing A - highlighted.pdf29 Jun 2024
Copy of Layout Approval (in case of layout)File: Layout-01_rotated.pdf29 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 06.pdf29 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 07.pdf29 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 08.pdf29 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 09.pdf29 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf29 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf29 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Copy of CC.pdf29 Jun 2024
Declaration about Commencement CertificateFile: CC Declaration of Wing A.pdf29 Jun 2024
Declaration in FORM BFile: FORM B - Kapstone constructions - verdant vistas Wing A.pdf29 Jun 2024
CERSAI detailsFile: CERSAI_Search_Report_Wing A.pdf29 Jun 2024
CERSAI detailsFile: Verdant Wing A.pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1.pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2.pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3.pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: KCPL.pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Untitled_20240617_053210.pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: doc07278020240618154512.pdf29 Jun 2024
Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER - Verdant Vistas Wing A (revised).pdf29 Jun 2024
PAN CardFile: 1 PAN Card.pdf28 Jun 2024
Details of encumbrances concerned to FinanceFile: Verdant Finance Wing A.pdf28 Jun 2024
Details of encumbrances concerned to FinanceFile: Verdant Legal Wing A.pdf28 Jun 2024
Details of encumbrances concerned to LegalFile: Verdant Finance Wing A.pdf28 Jun 2024
Details of encumbrances concerned to LegalFile: Verdant Legal Wing A.pdf28 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Verdant Vistas Wing A.pdf28 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Verdant WING A Format.pdf28 Jun 2024
Deviation Report with respect to Allotment letterFile: Verdant WING A Deviation.pdf28 Jun 2024

Promoter's earlier projects20

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

11 delivered on promise2 delivered late7 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RUSTOMJEE VERDANT VISTAS WING BP51700077134Majiwade, Thane West, Thane288Jul 2024OngoingFeb 2030Not due yet
RUSTOMJEE LA VIE WING CP51700053109Majiwade Thane West, Thane318Oct 2023OngoingFeb 2029Not due yet
RUSTOMJEE LA VIE WING BP51700053110Majiwade Thane West, Thane-Oct 2023OngoingFeb 2029Not due yet
RUSTOMJEE LA VIE WING AP51700050803Majiwade Thane West, Thane-May 2023OngoingDec 2028Not due yet
RUSTOMJEE LA FAMILIA- WING CP51700046128RUSTOMJEE URBANIA, Thane-Jun 2022OngoingJun 2027Not due yet
RUSTOMJEE LA FAMILIA - WING BP51700032205MAJIWADE, Thane-Dec 2021OngoingDec 2026Not due yet
RUSTOMJEE LA FAMILIA - WING AP51700032262MAJIWADE, Thane-Dec 2021OngoingDec 2026Not due yet
Rustomjee Azziano Wing LP51700018621Thane west, Thane-Nov 2018CompletedMar 2025Mar 2025
Rustomjee Azziano Wing DP51700019544THANE WEST, Thane-Feb 2019CompletedMar 2025Mar 2025
RUSTOMJEE AZZIANO WING EP51700015260THANE WEST, Thane-Feb 2018CompletedFeb 2023Feb 2023
Rustomjee Azziano Wing KP51700013649Thane West, Thane-Oct 2017CompletedSep 2022Sep 2022
Rustomjee Azziano Wing IP51700001093Thane West, Thane-Jul 2017CompletedDec 2020Dec 2020
Rustomjee Azziano Wing HP51700001453Thane West, Thane-Jul 2017CompletedMay 2019May 2019
Rustomjee Azziano Wing JP51700000950Thane West, Thane-Jul 2017CompletedMar 2019Mar 2019
Rustomjee Azziano Wing GP51700001060Thane West, Thane-Jul 2017CompletedMar 2019Mar 2019
Rustomjee Azziano Wing FP51700001021Thane west, Thane-Jul 2017CompletedMar 2019Mar 2019
Rustomjee Azziano ABCRustomjee Urbania Eastern Express Hwy Majiwada Junction Thane West - 400601431-CompletedDec 2016Mar 2016
Rustomjee AtelierRustomjee Urbania Eastern Express Hwy Majiwada Junction Thane West - 400601310-CompletedJun 2016Mar 2016
Rustomjee AcuraRustomjee Urbania Eastern Express Hwy Majiwada Junction Thane West - 400601600-CompletedDec 2013Late, Oct 2014
Rustomjee AstraeaRustomjee Urbania Eastern Express Hwy Majiwada Junction Thane West - 400601106-CompletedDec 2009Late, Jan 2014

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RUSTOMJEE VERDANT VISTAS WING A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Majiwade Thane West7,600+ in Thane

2 kmRUSTOMJEE VERDANT VISTASCompleted 126Lapsed / revoked 59Other 113Dot size: filed unitsN

Filed coordinates, straight-line distance. 298 registered projects within 2 km.

Builder: Kapstone Constructions Private Limited

Kapstone Constructions Private Limited has 20 registrations on MahaRERA, including Rustomjee Azziano Wing F and Rustomjee Azziano Wing G. Its filings disclose 21 earlier MahaRERA projects: declares 11 of 13 past projects completed on time. Litigation is declared on 10 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if RUSTOMJEE VERDANT VISTAS WING A is delayed beyond 18 Jan 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUSTOMJEE VERDANT VISTAS WING A?

The registered promoter entity is Kapstone Constructions Private Limited, a company as per the filing. Its CIN U45200MH2003PTC140091 and GSTIN 27AACCK3513FIZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUSTOMJEE VERDANT VISTAS WING A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RUSTOMJEE VERDANT VISTAS WING A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUSTOMJEE VERDANT VISTAS WING A?

The professionals named in the filing: Architect: Manish Savant; Engineer: Mehul Shah; Chartered Accountant: V A Shimpi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUSTOMJEE VERDANT VISTAS WING A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUSTOMJEE VERDANT VISTAS WING A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUSTOMJEE VERDANT VISTAS WING A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.