Completed No litigation declared Residential / Group Housing project

RUSTOMJEE AZZIANO WING E

By Kapstone Constructions Private Limited

RG-MH-40147 · RERA P51700015260 · Last updated on MahaRERA portal: 26 Apr 2021

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Feb 2023Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Internal walls, 99%
1Complaints at MahaRERAon this registration
Jump to the 18 documents Report an error

RUSTOMJEE AZZIANO WING E is a Residential / Group Housing project by Kapstone Constructions Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700015260 on 12 Feb 2018. The registration is recorded completed; possession was promised by 28 Feb 2023. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRUSTOMJEE AZZIANO WING E
  • TypeResidential / Group Housing
  • Location
    • Eastern Express Highway Majiwade
    • THANE WEST
    • Thane (M Corp.)
    • Thane
    • 400601
  • Pincode400601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700015260
  • ReraGenie IDRG-MH-40147

Builder

  • NameKapstone Constructions Private Limited
  • Entity typeCompany
  • CINU45200MH2003PTC140091
  • GSTIN27AACCK3513FIZW
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsPercy Chowdhry, Boman Irani
  • Other registrations19 more →
  • Completed10 of 20
  • Declared earlier projects21 →

Key dates

this monthRegisteredFeb 2018PromisedFeb 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Feb 2018
  • Promised completion28 Feb 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed18 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RUSTOMJEE AZZINO WING ENA360000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Apr 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

RUSTOMJEE AZZINO WING E: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises91%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities52

As on 26 Apr 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes35%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes22%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Café Airconditioned cafe for 20 to 25 seating , with a service pantry.Yes30%
NANoNot applicable
kids Pool Shallow Pool for Kids 600 mm deepthYes80%
Dry fountain Fun activity .Yes80%
Box Cricket / Basket ball Court 14.5 x15.5 m designed for multisport activities.Yes0%
Leons World Enclosed Kids Activity AreaYes0%
Senior citizens relaxation area Semi Covered with resting benches / reclinersYes0%
Barbeque Corner Open Air Barbeque PodYes0%
Business center / Meeting rooms (2 nos)Yes0%
Party hall Capacity 100-120 pax, A.C. , with service pantry facility light & sound arrangementYes0%
Jumping Garden Varing Level Lawn Patches for Kids to enjoy JumpingYes0%
Changing rooms with ShowersYes50%
Feature Deck Pavilion Landscape Feature with Outdoor SeatingYes0%
Hammocks Pavilion Hammocks places below Tree ShadeYes0%
Puzzle Path Puzzle Pathway created with ShrubsYes0%
Meditation POD Deck Area in Building Footprint for MeditationYes0%
Climbing wall Deigned in Building FootprintYes0%
Squash Court Standard Size Squash CourtYes0%
Guest Rooms Twin Sharing Guest Rooms 6 nosYes0%
Amphitheatre Designed Space for 20 25 pax gatheringsYes0%
Childrens Play Area Kids play activity zone.Yes0%
Kid's play area Semi-Open Kids Play AreaYes0%
Prefunction area Guests Welcome Lounge for party hallYes0%
Spa Air conditioned spa with two treatment rooms and attached restroom.Yes25%
Festive Plaza and Multiputpose Play GroundYes100%
Indoor Games zone Airconditioned space for pool, table tennis and board games like chess & carroYes0%
Mini Golf Semiopen Golf practice area in buiding foot printYes0%
Tennis court Flood Lit size 24 X 11 mtsYes0%
Mini theatre Air conditioned preview theatre for 12-16 seating.Yes0%
Yoga Hall Deck Air Conditioned Space for Yoga ActivityYes0%
Resting cabanas Outdoor furniture for resting & relaxationYes0%
Alfresco dining Out door dining area for informal get together.Yes0%
Library / Reading Room Airconditioned space provided for reading & interaction .Yes0%
Swimming pool 49 x 11.3 m x 1.2 m deepYes85%
Party Spill out area Capacity 100 to 120 pax open to skyYes0%
Cooling mist pod Located near rampYes0%
Gymnasium Air conditioned work out space with cardio & strength equipmentsYes0%

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area568 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
Transcon - Seth Realtors Pvt LtdKurlaMumbai Suburban
KMD ENTEPRISESThane (M Corp.)Thane
MNP ASSOCIATEAndheriMumbai Suburban
VIJAY SINGH VERMAKurlaMumbai Suburban
MANISH D SHAHMumbai CityMumbai City

Approvals and building plan

Permissible FSI13698.04
Proposed, not sanctioned13,698 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch349 BUSINESS POINT BLDG ANDHERI EAST MUMBAI 400069

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Ar Hafeez Contactor
PartnerRole in project
Kapstone Constructions Private Limited-

Litigation declared4

CaseCourtStatus
491 of 2017/2018Thane Civil Courtsummons report awaited
MNL Appeal No 60/2017/2017Sub Divisional OfficerSDO passed an order directing the Promoter to pay royalty amount of rupees one crore fifty two thous
9948/2018BOMBAY HIGH COURTthe promoter has challenged the order of SDO directing to pay Royalty to Government High court grant
892/2016Addl Chief Metropolitan Magistrate Court At Andheripolice to file report

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000197233Kapstone Constructions Pvt Ltd CompanyAshish Singh and Anr14/06/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Feb 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Feb 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Jan 2020

Documents filed18

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: society registration certificate AZZIANO E TO K.pdf26 Apr 2021
Certificates of CA (Form 5)File: Azziano Wing E.pdf30 Sep 2020
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4- AZZIANO E WING.pdf30 Jan 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AZZIANO E WING OC LETTER.pdf23 Jan 2020
Certificates of CA (Form 5)File: AZZINAO E WING.pdf30 Sep 2019
Proforma of Allotment letterFile: AZZIANO E wing AFS Draft(1).pdf11 Sep 2019
Certificates of CA (Form 5)File: FORM 5 AZZIANO E WING.pdf30 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: AZZIANO CC 11 JULY 2017.pdf29 Mar 2018
Building plan approvalFile: Permission CC.pdf6 Feb 2018
Layout approvalFile: Approved layout 11-07-17.pdf6 Feb 2018
PAN CardFile: PAN Copy.PDF6 Feb 2018
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf6 Feb 2018
Details of encumbrancesFile: Urbania- Encumbrance Certificate_300617.pdf6 Feb 2018
Copy of Layout Approval (in case of layout)File: Approved layout 11-07-17.pdf6 Feb 2018
Building Plan Approval (IOD)File: Permission CC.pdf6 Feb 2018
Declaration in FORM BFile: Promoter Decln.pdf6 Feb 2018
Certificates of CA (Form 3)File: Form 03 CA Certificate-v1.pdf6 Feb 2018
Proforma of Allotment letterFile: Performa Application Form.pdf6 Feb 2018

Promoter's earlier projects20

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise2 delivered late8 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RUSTOMJEE VERDANT VISTAS WING BP51700077134Majiwade, Thane West, Thane288Jul 2024OngoingFeb 2030Not due yet
RUSTOMJEE VERDANT VISTAS WING AP51700077136Majiwade Thane West, Thane192Jul 2024OngoingJan 2030Not due yet
RUSTOMJEE LA VIE WING CP51700053109Majiwade Thane West, Thane318Oct 2023OngoingFeb 2029Not due yet
RUSTOMJEE LA VIE WING BP51700053110Majiwade Thane West, Thane-Oct 2023OngoingFeb 2029Not due yet
RUSTOMJEE LA VIE WING AP51700050803Majiwade Thane West, Thane-May 2023OngoingDec 2028Not due yet
RUSTOMJEE LA FAMILIA- WING CP51700046128RUSTOMJEE URBANIA, Thane-Jun 2022OngoingJun 2027Not due yet
RUSTOMJEE LA FAMILIA - WING BP51700032205MAJIWADE, Thane-Dec 2021OngoingDec 2026Not due yet
RUSTOMJEE LA FAMILIA - WING AP51700032262MAJIWADE, Thane-Dec 2021OngoingDec 2026Not due yet
Rustomjee Azziano Wing LP51700018621Thane west, Thane-Nov 2018CompletedMar 2025Mar 2025
Rustomjee Azziano Wing DP51700019544THANE WEST, Thane-Feb 2019CompletedMar 2025Mar 2025
Rustomjee Azziano Wing KP51700013649Thane West, Thane-Oct 2017CompletedSep 2022Sep 2022
Rustomjee Azziano Wing IP51700001093Thane West, Thane-Jul 2017CompletedDec 2020Dec 2020
Rustomjee Azziano Wing HP51700001453Thane West, Thane-Jul 2017CompletedMay 2019May 2019
Rustomjee Azziano Wing JP51700000950Thane West, Thane-Jul 2017CompletedMar 2019Mar 2019
Rustomjee Azziano Wing GP51700001060Thane West, Thane-Jul 2017CompletedMar 2019Mar 2019
Rustomjee Azziano Wing FP51700001021Thane west, Thane-Jul 2017CompletedMar 2019Mar 2019
Rustomjee Azziano ABCRustomjee Urbania Eastern Express Hwy Majiwada Junction Thane West - 400601431-CompletedDec 2016Mar 2016
Rustomjee AtelierRustomjee Urbania Eastern Express Hwy Majiwada Junction Thane West - 400601310-CompletedJun 2016Mar 2016
Rustomjee AcuraRustomjee Urbania Eastern Express Hwy Majiwada Junction Thane West - 400601600-CompletedDec 2013Late, Oct 2014
Rustomjee AstraeaRustomjee Urbania Eastern Express Hwy Majiwada Junction Thane West - 400601106-CompletedDec 2009Late, Jan 2014

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RUSTOMJEE AZZIANO WING E on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THANE WEST7,600+ in Thane

2 kmRUSTOMJEE AZZIANO WING ECompleted 130Lapsed / revoked 62Other 132Dot size: filed unitsN

Filed coordinates, straight-line distance. 324 registered projects within 2 km.

Builder: Kapstone Constructions Private Limited

Kapstone Constructions Private Limited has 20 registrations on MahaRERA, including Rustomjee Azziano Wing F and Rustomjee Azziano Wing G. Its filings disclose 21 earlier MahaRERA projects: declares 11 of 13 past projects completed on time. Litigation is declared on 10 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if RUSTOMJEE AZZIANO WING E is delayed beyond 28 Feb 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUSTOMJEE AZZIANO WING E?

The registered promoter entity is Kapstone Constructions Private Limited, a company as per the filing. Its CIN U45200MH2003PTC140091 and GSTIN 27AACCK3513FIZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUSTOMJEE AZZIANO WING E?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RUSTOMJEE AZZIANO WING E?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RUSTOMJEE AZZIANO WING E?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUSTOMJEE AZZIANO WING E?

The professionals named in the filing: Architect: Architect Ar Hafeez Contactor. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUSTOMJEE AZZIANO WING E?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUSTOMJEE AZZIANO WING E. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUSTOMJEE AZZIANO WING E to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.