Home / Browse projects / Thane, Maharashtra / Embassy One Thane - 1A 1B 1C
Embassy One Thane - 1A 1B 1C
By Tapir Constructions Limited
RG-MH-11239 · RERA P51700000958 · Last updated on MahaRERA portal: 26 Jun 2026
Source: official MahaRERA filing
Red flags
- 17 complaints at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Embassy One Thane - 1A 1B 1C is a Residential / Group Housing project by Tapir Constructions Limited in Thane, Maharashtra, registered with MahaRERA as P51700000958 on 25 Jul 2017. The registration is recorded completed; possession was promised by 7 Aug 2026. The completion date has moved by 24 months from the original filing. 384 of the 388 units on this registration are recorded sold or booked, and 33 of 33 construction stages are filed complete. 17 complaints are on record with the regulator.
At a glance
Project
- NameEmbassy One Thane - 1A 1B 1C
- TypeResidential / Group Housing
- Location
- Pokharan Road No 2
- Thane
- Panchpakhadi
- 400601
- Pincode400601
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700000958
- ReraGenie IDRG-MH-11239
Builder
- NameTapir Constructions Limited
- Entity typeCompany
- CINU70200DL2014PLC267441
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsAbhishek Rajninath Surve, Udya Shyamnarayan Dubey
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 Jul 2017
- Promised completion7 Aug 2026
- Revised completionRevised to 7 Aug 2026 (originally 29 Aug 2024)
- Buildings3 building records
- Documents filed269 files
Current status
Figures as on 26 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 A | NA | 34 | 30 | 110 | 0 | 110 |
| 1 B | NA | 34 | 30 | 168 | 0 | 168 |
| 1 C | NA | 34 | 30 | 110 | 0 | 110 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
33 of 33 construction stages are filed complete across 3 buildings.
1 A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
1 B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
1 C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 60% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed863
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| 1 A | 252 | 0 | 252 |
| 1 B | 344 | 0 | 344 |
| 1 C | 250 | 17 | 267 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| 1 B | NA | Rs 71.48 cr | Rs 71.48 cr |
| 1 A | NA | Rs 67.92 cr | Rs 67.92 cr |
| 1 C | NA | Rs 67.92 cr | Rs 67.92 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAKHI UBHARE |
| Engineer | Pritam Bhanushali |
| Engineer | RAMESH RAMPURE |
| Chartered Accountant | AKORD AND CO |
| Chartered Accountant | R G V A & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Tapir Constructions Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Reason has been explained in the attached self declaration
Reason as filed by the promoterThe Reason has been explained in the attached self declaration.
Complaints filed with MahaRERA17
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000079122 | POOJA RAI | TAPIR CONSTRUCTIONS LIMITED | 02/05/2019 |
| CC006000000100267 | Kamala Bhawarlal Jain | M/s. Tapir Constructions Ltd. and M/s. India Bulls | 23/07/2019 |
| CC006000000100456 | Mr Rajan Rayu Kelekar | M/s Indiabulls Real Estate Liited | 08/08/2019 |
| CC006000000171753 | Mr. Jayesh Kantilal Jain | Tapir Construction Limited (Indiabulls Real Estate) | 03/12/2019 |
| CC006000000181996 | Mr Kamlesh Kantilalji Jain | Tapir Constructions Limited | 28/12/2019 |
| CC006000000182001 | Mr Mukesh Nagindas Vora | Tapir Construction Limited | 29/12/2019 |
| CC006000000196842 | MILIND GIRISH GOKHALE | TAPIR CONSTRUCTIONS | 28/04/2021 |
| CC12400086 | Vinayak Gokak | Tapir Constructions Limited | 12/09/2024 |
| CC12400798 | Machchhindra Dhondiba Waphare | Tapir Constructions Limited | 16/11/2024 |
| CC12501154 | sushant musale | Tapir Constructions Limited | 07/04/2025 |
| CC12501903 | Sujit Satyanarayan Gupta | Tapir Constructions Limited | 11/06/2025 |
| CC12502051 | Mukesh Arun Chintalwar | Tapir Constructions Limited | 23/06/2025 |
| CC12502752 | Neha Nilesh Solanki | Tapir Constructions Limited | 06/08/2025 |
| CC12502753 | Neha Nilesh Solanki | Tapir Constructions Limited | 06/08/2025 |
| CC12504389 | Bhairavi Saraf | Tapir Constructions Limited | 09/12/2025 |
| CC12503078 | VINOD BAHIRU GHANE | Tapir Constructions Limited | 02/09/2025 |
| CC12504402 | KANTI LAXMAN KAROTRA | Tapir Constructions Limited | 10/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Jun 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Jun 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed269
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 269 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: FULL OC 1A 1B 1C.pdf | 26 Jun 2026 |
| Occupational CertificateFile: 1.pdf | 26 Jun 2026 |
| Occupational CertificateFile: 2.pdf | 26 Jun 2026 |
| Occupational CertificateFile: 3.pdf | 26 Jun 2026 |
| Occupational CertificateFile: 4.pdf | 26 Jun 2026 |
| Occupational CertificateFile: 5.pdf | 26 Jun 2026 |
| Occupational CertificateFile: 6.pdf | 26 Jun 2026 |
| Occupational CertificateFile: 7.pdf | 26 Jun 2026 |
| Occupational CertificateFile: 8.pdf | 26 Jun 2026 |
| Occupational CertificateFile: 9.pdf | 26 Jun 2026 |
| Occupational CertificateFile: 10.pdf | 26 Jun 2026 |
| Building plan approvalFile: 2.pdf | 19 Jun 2026 |
| Building plan approvalFile: 3.pdf | 19 Jun 2026 |
| Building plan approvalFile: 4.pdf | 19 Jun 2026 |
| Building plan approvalFile: 5.pdf | 19 Jun 2026 |
| Building plan approvalFile: 6.pdf | 19 Jun 2026 |
| Building plan approvalFile: 7.pdf | 19 Jun 2026 |
| Building plan approvalFile: 8.pdf | 19 Jun 2026 |
| Building plan approvalFile: 9.pdf | 19 Jun 2026 |
| Building plan approvalFile: 10.pdf | 19 Jun 2026 |
| Layout approvalFile: 1.pdf | 19 Jun 2026 |
| Building plan approvalFile: Architect Declaration related to Parking (1).pdf | 17 Jun 2026 |
| Building plan approvalFile: Mhada NOC dt 29Oct 2025.pdf | 17 Jun 2026 |
| Building plan approvalFile: Clarification on MHADA Building.pdf | 17 Jun 2026 |
| Layout approvalFile: Plan No 1.pdf | 16 Jun 2026 |
| Building plan approvalFile: Plan No 2.pdf | 16 Jun 2026 |
| Building plan approvalFile: Plan No 3.pdf | 16 Jun 2026 |
| Building plan approvalFile: Plan No 4.pdf | 16 Jun 2026 |
| Building plan approvalFile: Plan No 5.pdf | 16 Jun 2026 |
| Building plan approvalFile: Plan No 6.pdf | 16 Jun 2026 |
| Building plan approvalFile: Plan No 7.pdf | 16 Jun 2026 |
| Building plan approvalFile: Plan No 8.pdf | 16 Jun 2026 |
| Building plan approvalFile: Plan No 9.pdf | 16 Jun 2026 |
| Building plan approvalFile: Plan No 10.pdf | 16 Jun 2026 |
| Building plan approvalFile: Plan No 11.pdf | 16 Jun 2026 |
| Building plan approvalFile: Plan No 12.pdf | 16 Jun 2026 |
| Withdrawal Update Form 1File: Form_1.PDF | 16 Jun 2026 |
| Withdrawal Update Form 2File: Form-2.pdf | 16 Jun 2026 |
| Withdrawal Update Form 3File: One indiabulls Thane 1.pdf | 16 Jun 2026 |
| Layout approvalFile: Sanctioned Layout_Highlighted.pdf | 28 May 2026 |
| Withdrawal Update Form 1File: Form_1 Thane One.PDF | 22 May 2026 |
| Withdrawal Update Form 1File: Form_1.PDF | 22 May 2026 |
| Withdrawal Update Form 2File: Form-2.pdf | 22 May 2026 |
| Withdrawal Update Form 2File: Form-2.pdf | 22 May 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 22 May 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 22 May 2026 |
| Withdrawal Update Form 1File: Form_1 Thane One.PDF | 18 Nov 2025 |
| Withdrawal Update Form 2File: Signed Form-2 _One Indiabulls Thane-1.PDF | 18 Nov 2025 |
| Withdrawal Update Form 3File: Form-3_for Q2 of FY 25-26_One Indiabulls Thane1_compressed.pdf | 18 Nov 2025 |
| Withdrawal Update Form 1File: Form_1 One Indiabulls Thane.PDF | 18 Sep 2025 |
| Withdrawal Update Form 2File: Form-2 _One Indiabulls Thane-1 of Q1.pdf | 18 Sep 2025 |
| Withdrawal Update Form 3File: Form_3 One Indiabulls Thane-1.PDF | 18 Sep 2025 |
| Form 2A (FY 2024-2025)File: Revised_Quality 2A Certific One Indiabulls Thane.pdf | 30 Jun 2025 |
| Form 1File: From_1 Indiabulls Thane One-1_Q4.PDF | 26 Jun 2025 |
| Form 2File: Form 2 One Indiabulls Thane-1.PDF | 26 Jun 2025 |
| Form 3File: Final Signed_Form-3 One Indiabulls Thane.PDF | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexure B- Disclosure of sold Unsold Inventory.PDF | 26 Jun 2025 |
| OthersFile: Encumbrance,Asset,Debtors Decl_Merge.pdf | 26 Jun 2025 |
| Details of encumbrances concerned to FinanceFile: Annexure K-Encumbrance Concerned to Finance.PDF | 22 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 One Indiabulls Thane-1.PDF | 22 Feb 2025 |
| Certificates of CA (Form 3)File: One Indiabulls Thane_Final Form 3_compressed.pdf | 22 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 One Indiabulls Thane-1.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Annexure B- Disclosure of Sold Unsold_compressed.pdf | 22 Feb 2025 |
| CERSAI detailsFile: Annexure G-Asset Based Declaration.PDF | 22 Feb 2025 |
| CERSAI detailsFile: Annexure L- Debtor Based Declaration.PDF | 22 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Annexure K-Encumbrance Concerned to Finance.PDF | 22 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 2023-24.pdf | 5 Dec 2024 |
| Certificates of CA (Form 3)File: V2_Revised Final_Form 2_One indiabulls thane 1.PDF | 3 Dec 2024 |
| Certificates of CA (Form 3)File: V2_Revised Final_Form 3_One indiabulls thane 1.PDF | 3 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: V2_Revised Final_Form 2_One indiabulls thane 1.PDF | 3 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_FY 21-22.pdf | 3 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 22-23.pdf | 3 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Form_5 One Indiabulls Thane-1.PDF | 3 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: Annexure K - Encumbrance Concerned to Finance.pdf | 26 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_Q2.PDF | 26 Nov 2024 |
| Certificates of CA (Form 3)File: Signed_Form 3_One indiabulls thane 1.pdf | 26 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2 One Indiabulls Thane-1.PDF | 26 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Annexure B- Disclosure of sold unsold.pdf | 26 Nov 2024 |
| CERSAI detailsFile: Annexure G-Asset Based Declaration.pdf | 26 Nov 2024 |
| CERSAI detailsFile: Annexure L- Debtor Based Declaration.pdf | 26 Nov 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 269 filed documents as one ZIP, foldered, with a manifest
Keep Embassy One Thane - 1A 1B 1C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Thane7,600+ in Thane
Filed coordinates, straight-line distance. 389 registered projects within 2 km.
ASHAR PULSE
Ms ASHAR VENTURES
SHETH ZURI
Sheth Developers Private Limited
Jagdale Edge
JAGDALE INFRASTRUCTURE PVT. LTD.
Bliss
Kapstone Constructions Private Limited
RUSTOMJEE LA VIE Wing D
Kapstone Constructions Private Limited
Thane Project
LODHA DEVELOPERS LIMITED
See every Thane project, with the district possession charts
Builder: Tapir Constructions Limited
Tapir Constructions Limited has 2 registrations on MahaRERA, including Embassy One Thane - 1A 1B 1C and Embassy One Thane. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Embassy One Thane - 1A 1B 1C is delayed beyond 7 Aug 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Embassy One Thane - 1A 1B 1C?
The registered promoter entity is Tapir Constructions Limited, a company as per the filing. Its CIN U70200DL2014PLC267441 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Embassy One Thane - 1A 1B 1C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Embassy One Thane - 1A 1B 1C?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Embassy One Thane - 1A 1B 1C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Embassy One Thane - 1A 1B 1C?
The professionals named in the filing: Architect: RAKHI UBHARE; Engineer: Pritam Bhanushali; Engineer: RAMESH RAMPURE; Chartered Accountant: AKORD AND CO; Chartered Accountant: R G V A & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Embassy One Thane - 1A 1B 1C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback