Completed No litigation declared Residential / Group Housing project

Embassy One Thane - 1A 1B 1C

By Tapir Constructions Limited

RG-MH-11239 · RERA P51700000958 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • 17 complaints at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2026Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
4 of 388Units unsoldnot recorded sold or booked
17Complaints at MahaRERAon this registration
Jump to the 269 documents Report an error

Embassy One Thane - 1A 1B 1C is a Residential / Group Housing project by Tapir Constructions Limited in Thane, Maharashtra, registered with MahaRERA as P51700000958 on 25 Jul 2017. The registration is recorded completed; possession was promised by 7 Aug 2026. The completion date has moved by 24 months from the original filing. 384 of the 388 units on this registration are recorded sold or booked, and 33 of 33 construction stages are filed complete. 17 complaints are on record with the regulator.

At a glance

Project

  • NameEmbassy One Thane - 1A 1B 1C
  • TypeResidential / Group Housing
  • Location
    • Pokharan Road No 2
    • Thane
    • Panchpakhadi
    • 400601
  • Pincode400601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700000958
  • ReraGenie IDRG-MH-11239

Builder

  • NameTapir Constructions Limited
  • Entity typeCompany
  • CINU70200DL2014PLC267441
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsAbhishek Rajninath Surve, Udya Shyamnarayan Dubey
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJul 2017First promiseAug 2024Revised toAug 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Jul 2017
  • Promised completion7 Aug 2026
  • Revised completionRevised to 7 Aug 2026 (originally 29 Aug 2024)
  • Buildings3 building records
  • Documents filed269 files

Current status

99%384 of 388 units booked
100.0%Work done, per cost certificate

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1 ANA34301100110
1 BNA34301680168
1 CNA34301100110

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

1 A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
1 B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
1 C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes60%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed863

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots863
Closed/Covered846
Open Space17
BuildingClosed/CoveredOpen SpaceTotal
1 A2520252
1 B3440344
1 C25017267

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,535 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Sep 2025

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI26621.62
Proposed, not sanctioned26,622 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSec 31, 32 A, Gurgaon HR, Gurgaon-122001
Estimated costRs 207.32 cr
Cost incurredRs 207.32 cr
Work done100.0%
BuildingWingEstimatedIncurred
1 BNARs 71.48 crRs 71.48 cr
1 ANARs 67.92 crRs 67.92 cr
1 CNARs 67.92 crRs 67.92 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAKHI UBHARE
EngineerPritam Bhanushali
EngineerRAMESH RAMPURE
Chartered AccountantAKORD AND CO
Chartered AccountantR G V A & ASSOCIATES
PartnerRole in project
Tapir Constructions Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700024628Aug 2024 → Aug 2025

Reason as filed by the promoterThe Reason has been explained in the attached self declaration

EA27042620752Aug 2024 → Aug 2026

Reason as filed by the promoterThe Reason has been explained in the attached self declaration.

Complaints filed with MahaRERA17

Case no.ComplainantRespondentFiled
CC006000000079122POOJA RAITAPIR CONSTRUCTIONS LIMITED02/05/2019
CC006000000100267Kamala Bhawarlal JainM/s. Tapir Constructions Ltd. and M/s. India Bulls23/07/2019
CC006000000100456Mr Rajan Rayu KelekarM/s Indiabulls Real Estate Liited08/08/2019
CC006000000171753Mr. Jayesh Kantilal JainTapir Construction Limited (Indiabulls Real Estate)03/12/2019
CC006000000181996Mr Kamlesh Kantilalji JainTapir Constructions Limited28/12/2019
CC006000000182001Mr Mukesh Nagindas VoraTapir Construction Limited29/12/2019
CC006000000196842MILIND GIRISH GOKHALETAPIR CONSTRUCTIONS28/04/2021
CC12400086Vinayak GokakTapir Constructions Limited12/09/2024
CC12400798Machchhindra Dhondiba WaphareTapir Constructions Limited16/11/2024
CC12501154sushant musaleTapir Constructions Limited07/04/2025
CC12501903Sujit Satyanarayan GuptaTapir Constructions Limited11/06/2025
CC12502051Mukesh Arun ChintalwarTapir Constructions Limited23/06/2025
CC12502752Neha Nilesh SolankiTapir Constructions Limited06/08/2025
CC12502753Neha Nilesh SolankiTapir Constructions Limited06/08/2025
CC12504389Bhairavi SarafTapir Constructions Limited09/12/2025
CC12503078VINOD BAHIRU GHANETapir Constructions Limited02/09/2025
CC12504402KANTI LAXMAN KAROTRATapir Constructions Limited10/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed269

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 269 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: FULL OC 1A 1B 1C.pdf26 Jun 2026
Occupational CertificateFile: 1.pdf26 Jun 2026
Occupational CertificateFile: 2.pdf26 Jun 2026
Occupational CertificateFile: 3.pdf26 Jun 2026
Occupational CertificateFile: 4.pdf26 Jun 2026
Occupational CertificateFile: 5.pdf26 Jun 2026
Occupational CertificateFile: 6.pdf26 Jun 2026
Occupational CertificateFile: 7.pdf26 Jun 2026
Occupational CertificateFile: 8.pdf26 Jun 2026
Occupational CertificateFile: 9.pdf26 Jun 2026
Occupational CertificateFile: 10.pdf26 Jun 2026
Building plan approvalFile: 2.pdf19 Jun 2026
Building plan approvalFile: 3.pdf19 Jun 2026
Building plan approvalFile: 4.pdf19 Jun 2026
Building plan approvalFile: 5.pdf19 Jun 2026
Building plan approvalFile: 6.pdf19 Jun 2026
Building plan approvalFile: 7.pdf19 Jun 2026
Building plan approvalFile: 8.pdf19 Jun 2026
Building plan approvalFile: 9.pdf19 Jun 2026
Building plan approvalFile: 10.pdf19 Jun 2026
Layout approvalFile: 1.pdf19 Jun 2026
Building plan approvalFile: Architect Declaration related to Parking (1).pdf17 Jun 2026
Building plan approvalFile: Mhada NOC dt 29Oct 2025.pdf17 Jun 2026
Building plan approvalFile: Clarification on MHADA Building.pdf17 Jun 2026
Layout approvalFile: Plan No 1.pdf16 Jun 2026
Building plan approvalFile: Plan No 2.pdf16 Jun 2026
Building plan approvalFile: Plan No 3.pdf16 Jun 2026
Building plan approvalFile: Plan No 4.pdf16 Jun 2026
Building plan approvalFile: Plan No 5.pdf16 Jun 2026
Building plan approvalFile: Plan No 6.pdf16 Jun 2026
Building plan approvalFile: Plan No 7.pdf16 Jun 2026
Building plan approvalFile: Plan No 8.pdf16 Jun 2026
Building plan approvalFile: Plan No 9.pdf16 Jun 2026
Building plan approvalFile: Plan No 10.pdf16 Jun 2026
Building plan approvalFile: Plan No 11.pdf16 Jun 2026
Building plan approvalFile: Plan No 12.pdf16 Jun 2026
Withdrawal Update Form 1File: Form_1.PDF16 Jun 2026
Withdrawal Update Form 2File: Form-2.pdf16 Jun 2026
Withdrawal Update Form 3File: One indiabulls Thane 1.pdf16 Jun 2026
Layout approvalFile: Sanctioned Layout_Highlighted.pdf28 May 2026
Withdrawal Update Form 1File: Form_1 Thane One.PDF22 May 2026
Withdrawal Update Form 1File: Form_1.PDF22 May 2026
Withdrawal Update Form 2File: Form-2.pdf22 May 2026
Withdrawal Update Form 2File: Form-2.pdf22 May 2026
Withdrawal Update Form 3File: FORM 3.pdf22 May 2026
Withdrawal Update Form 3File: FORM 3.pdf22 May 2026
Withdrawal Update Form 1File: Form_1 Thane One.PDF18 Nov 2025
Withdrawal Update Form 2File: Signed Form-2 _One Indiabulls Thane-1.PDF18 Nov 2025
Withdrawal Update Form 3File: Form-3_for Q2 of FY 25-26_One Indiabulls Thane1_compressed.pdf18 Nov 2025
Withdrawal Update Form 1File: Form_1 One Indiabulls Thane.PDF18 Sep 2025
Withdrawal Update Form 2File: Form-2 _One Indiabulls Thane-1 of Q1.pdf18 Sep 2025
Withdrawal Update Form 3File: Form_3 One Indiabulls Thane-1.PDF18 Sep 2025
Form 2A (FY 2024-2025)File: Revised_Quality 2A Certific One Indiabulls Thane.pdf30 Jun 2025
Form 1File: From_1 Indiabulls Thane One-1_Q4.PDF26 Jun 2025
Form 2File: Form 2 One Indiabulls Thane-1.PDF26 Jun 2025
Form 3File: Final Signed_Form-3 One Indiabulls Thane.PDF26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure B- Disclosure of sold Unsold Inventory.PDF26 Jun 2025
OthersFile: Encumbrance,Asset,Debtors Decl_Merge.pdf26 Jun 2025
Details of encumbrances concerned to FinanceFile: Annexure K-Encumbrance Concerned to Finance.PDF22 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 One Indiabulls Thane-1.PDF22 Feb 2025
Certificates of CA (Form 3)File: One Indiabulls Thane_Final Form 3_compressed.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 One Indiabulls Thane-1.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Annexure B- Disclosure of Sold Unsold_compressed.pdf22 Feb 2025
CERSAI detailsFile: Annexure G-Asset Based Declaration.PDF22 Feb 2025
CERSAI detailsFile: Annexure L- Debtor Based Declaration.PDF22 Feb 2025
Details of encumbrances concerned to LegalFile: Annexure K-Encumbrance Concerned to Finance.PDF22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 2023-24.pdf5 Dec 2024
Certificates of CA (Form 3)File: V2_Revised Final_Form 2_One indiabulls thane 1.PDF3 Dec 2024
Certificates of CA (Form 3)File: V2_Revised Final_Form 3_One indiabulls thane 1.PDF3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: V2_Revised Final_Form 2_One indiabulls thane 1.PDF3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_FY 21-22.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 22-23.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Form_5 One Indiabulls Thane-1.PDF3 Dec 2024
Details of encumbrances concerned to FinanceFile: Annexure K - Encumbrance Concerned to Finance.pdf26 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_Q2.PDF26 Nov 2024
Certificates of CA (Form 3)File: Signed_Form 3_One indiabulls thane 1.pdf26 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2 One Indiabulls Thane-1.PDF26 Nov 2024
Disclosure of sold/ booked inventoryFile: Annexure B- Disclosure of sold unsold.pdf26 Nov 2024
CERSAI detailsFile: Annexure G-Asset Based Declaration.pdf26 Nov 2024
CERSAI detailsFile: Annexure L- Debtor Based Declaration.pdf26 Nov 2024

How this compares with Thane

99%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Embassy One Thane - 1A 1B 1C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane7,600+ in Thane

2 kmEmbassy One Thane - 1A 1Completed 159Lapsed / revoked 70Other 160Dot size: filed unitsN

Filed coordinates, straight-line distance. 389 registered projects within 2 km.

Builder: Tapir Constructions Limited

Tapir Constructions Limited has 2 registrations on MahaRERA, including Embassy One Thane - 1A 1B 1C and Embassy One Thane. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Embassy One Thane - 1A 1B 1C is delayed beyond 7 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Embassy One Thane - 1A 1B 1C?

The registered promoter entity is Tapir Constructions Limited, a company as per the filing. Its CIN U70200DL2014PLC267441 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Embassy One Thane - 1A 1B 1C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Embassy One Thane - 1A 1B 1C?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Embassy One Thane - 1A 1B 1C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Embassy One Thane - 1A 1B 1C?

The professionals named in the filing: Architect: RAKHI UBHARE; Engineer: Pritam Bhanushali; Engineer: RAMESH RAMPURE; Chartered Accountant: AKORD AND CO; Chartered Accountant: R G V A & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Embassy One Thane - 1A 1B 1C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Embassy One Thane - 1A 1B 1C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Embassy One Thane - 1A 1B 1C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.