Home / Browse projects / Pune, Maharashtra / Amanora Gateway Towers 2 - Towers 102 and 103
Amanora Gateway Towers 2 - Towers 102 and 103
RG-MH-31143 · RERA P52100079477 · Last updated on MahaRERA portal: 15 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 8 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Amanora Gateway Towers 2 - Towers 102 and 103 is a Others project by City Corporation Limited in Pune, Maharashtra, registered with MahaRERA as P52100079477 on 7 Mar 2025. Possession is promised by 30 Jun 2029. 206 of the 340 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameAmanora Gateway Towers 2 - Towers 102 and 103
- TypeOthers
- Location
- Hadapsar Kharadi Byepass
- Amanora Park Town
- Hadapsar
- Haveli
- Pune
- 411028
- Pincode411028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100079477
- ReraGenie IDRG-MH-31143
Builder
- NameCity Corporation Limited
- Entity typeCompany
- CINU45202PN2003PLC018435
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorsAniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande
- Other registrations12 more →
- Completed9 of 13
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Mar 2025
- Promised completion30 Jun 2029
- Revised completionNone
- Buildings2 building records
- Documents filed87 files
Current status
Figures as on 15 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 102 | NA | 34 | 32 | 164 | 9 | 173 |
| Tower 103 | NA | 34 | 31 | 167 | 0 | 167 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 53%.
Tower 10215%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 53% |
| Podiums (if any) | 13% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower 10338%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 13% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 1% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed681
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Tower 102 | 304 | 304 |
| Tower 103 | 377 | 377 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower 103 | NA | Rs 198.43 cr | Rs 20.52 cr |
| Tower 102 | NA | Rs 168.53 cr | Rs 14.41 cr |
| - | NA | Rs 10.95 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GNA Architects |
| Engineer | MR MANDAR KULKARNI |
| Chartered Accountant | SPCM & Associates |
| Chartered Accountant | SPCM and Associates |
| Chartered Accountant | A S Jinturkar and Company |
| Partner | Role in project |
|---|---|
| City Corporation Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12500182 | Ram Gawali | City Corporation Limited | 14/11/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Feb 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Feb 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Feb 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2029
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - GatewayTowers 102 and 103 03042026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Gateway Towers 2- Towers 102 and 103- Form 2- 31032026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form 3_Amanora Gateway Tower 102 and 103_31032026.pdf | 15 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - Gateway Towers 2 - 102 and 103 2025-26.pdf | 8 Apr 2026 |
| Layout approvalFile: R Copy of Layout GT2 - T102 and 103.pdf | 2 Feb 2026 |
| Building plan approvalFile: Sheet no 1.pdf | 2 Feb 2026 |
| Building plan approvalFile: sheet no 2.pdf | 2 Feb 2026 |
| Building plan approvalFile: sheet no 3.pdf | 2 Feb 2026 |
| Building plan approvalFile: Sheet no 4.pdf | 2 Feb 2026 |
| Building plan approvalFile: sheet no 5.pdf | 2 Feb 2026 |
| Building plan approvalFile: sheet no 6.pdf | 2 Feb 2026 |
| Building plan approvalFile: sheet no 7.pdf | 2 Feb 2026 |
| Building plan approvalFile: sheet no 8.pdf | 2 Feb 2026 |
| Withdrawal Update Form 1File: Gateway Towers 2- Towers 102 and 103- Form 1- 02012026.pdf | 12 Jan 2026 |
| Withdrawal Update Form 1File: Gateway Towers 2- Towers 102 and 103- Form 1- 02012026.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: Gateway Towers 2- Towers 101 and 102- Form 2- 06012026.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: Gateway Towers 2- Towers 101 and 102- Form 2- 06012026.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Gateway Towers - 102 and 103.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Amanora Gateway Tower 102 and 103 as on 31122025.pdf | 12 Jan 2026 |
| Withdrawal Update Form 1File: Form1 - Gateway Towers 2 - 102 and 103.pdf | 15 Oct 2025 |
| Withdrawal Update Form 1File: Form1 - Gateway Towers 2 - 102 and 103.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Form2 - Gateway Towers 2 - 102 and 103.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Form2 - Gateway Towers 2 - 102 and 103.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - Gateway Towers - 102 and 103.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - Gateway Towers - 102 and 103.pdf | 15 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Gateway 102 and 103 31-03-2025.pdf | 19 Sep 2025 |
| Form 1File: Form 1- Amanora Gateway Towers 2- Tower 102 and 103- 31032025.pdf | 19 Jul 2025 |
| Form 2File: Form 2- Amanora Gateway Towers 2- Towers 102 and 103 31032025.pdf | 19 Jul 2025 |
| Form 3File: Form 3_Amanora Gateway Tower 102 103 31032025.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Gateway Towers 102 and 103 -Inventory Status 31032025.pdf | 19 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Gateway Tower 102 103 31032025.pdf | 3 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gateway Towers 2- Towers 102 and 103 31032025.pdf | 3 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Amanora Gateway Tower 2- T102 T103.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gateway Towers 2- Tower 102 and 103- 31032025.pdf | 9 Apr 2025 |
| Layout approvalFile: Revised corrected Copy of Layout GT2 07042025.pdf | 7 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Revised corrected Copy of Layout GT2 07042025.pdf | 7 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: Final Deviation report Letter head -Agreement to Lease Amanora Gateway Towers 2 21022025.p | 8 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: Final Deviation report Letter head -Agreement to Lease Amanora Gateway Towers 2 21022025.p | 8 Mar 2025 |
| Other - LegalFile: हडपसर_138_139_173_177_181 ते 182_184 ते 185_187 ते 201_242 ते 244_Satbara.pdf | 3 Mar 2025 |
| Copy of the legal title reportFile: Titile City Corporation - RERA R7-1.pdf | 21 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Final Finance Encumbrance Amanora GT 2 - T 102 and 103.pdf | 21 Feb 2025 |
| Other - LegalFile: Legal Declaration RERA 21022025.pdf | 21 Feb 2025 |
| Deviation Report with respect to Allotment letterFile: Final Deviation report-allotment letter Amanora GT2 - T102 and 103.pdf | 21 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Final Finance Encumbrance Amanora GT 2 - T 102 and 103.pdf | 21 Feb 2025 |
| Other - TechnicalFile: Annexure A 21022025.pdf | 21 Feb 2025 |
| Proforma of Agreement for saleFile: Final Draft Agreement to Lease-R-7 Amanora Gateway Towers 2 -T102 103 - 21022025.pdf | 21 Feb 2025 |
| Proforma of Agreement for saleFile: Final Lease Deed R-7 Amanora Gateway Towers 2 T102 103-21022025.pdf | 21 Feb 2025 |
| Deviation Report with respect to model copy of AgreementFile: Final Deviation report Letter head -Agreement to Lease Amanora Gateway Towers 2 31012025.p | 31 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Gateway Tower 102 and 103.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gateway Towers 2- Tower 102 and 103.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gateway Towers 2- Towers 102 and 103.pdf | 13 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about Bank Accounts - Format A.pdf | 13 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: APD SIR.pdf | 13 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Bimal Parekh Sir.pdf | 13 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Lalit Adani.pdf | 13 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Suhas Lunkad.pdf | 13 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Sumeet Sir- CFO.pdf | 13 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Swati Maam.pdf | 13 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Jayant Shah.pdf | 13 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance Certificate.pdf | 11 Jan 2025 |
| Proforma of Allotment letterFile: Final Letterhead Allotment letter Amanora GT2 - T102 and 103.pdf | 11 Jan 2025 |
| CERSAI detailsFile: CERSAI Encumbrance Certificate.pdf | 11 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance Certificate.pdf | 11 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Opening of RERA Bank Accounts GT 2 - 09012025.pdf | 10 Jan 2025 |
| Layout approvalFile: Copy of Layout GT2.pdf | 9 Jan 2025 |
| Building plan approvalFile: Sheet No 1 of 8 rotated - Edited.pdf | 9 Jan 2025 |
| Building plan approvalFile: Sheet No 2 of 8.pdf | 9 Jan 2025 |
| Building plan approvalFile: Sheet No 3 of 8.pdf | 9 Jan 2025 |
| Building plan approvalFile: Sheet No 4 of 8.pdf | 9 Jan 2025 |
| Building plan approvalFile: Sheet No 5 of 8.pdf | 9 Jan 2025 |
| Building plan approvalFile: Sheet No 6 of 8.pdf | 9 Jan 2025 |
| Building plan approvalFile: Sheet No 7 of 8.pdf | 9 Jan 2025 |
| Building plan approvalFile: Sheet No 8 of 8.pdf | 9 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: Copy of Layout GT2.pdf | 9 Jan 2025 |
| Declaration in FORM BFile: Form B Declaration GT2 -080125.pdf | 9 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC -Gateway 2 - T102 103 07012025.pdf | 9 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 1 of 8 rotated - Edited.pdf | 9 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 8 of 8.pdf | 9 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 7 of 8.pdf | 9 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet No 6 of 8.pdf | 9 Jan 2025 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Amanora Ascent Towers 48 and 49P52100030032 | Amanora Park Town, Pune | - | Jul 2021 | Completed | Sep 2025 | Oct 2024 |
| Amanora Gold Towers 44, 45 and 46P52100017962 | Amanora Park Town, Pune | - | Oct 2018 | Completed | May 2024 | May 2024 |
| Amanora Gold Towers 42 and 43P52100017612 | Amanora Park Town, Pune | - | Aug 2018 | Completed | Dec 2023 | Jun 2023 |
| Amanora Gateway Tower 100P52100000380 | Amanora Park Town, Pune | - | Jul 2017 | Completed | Apr 2022Registered original: Apr 2020 | Apr 2022 |
| Amanora Adreno TowersP52100001822 | Amanora Park Town, Pune | - | Jul 2017 | Completed | Mar 2022 | Jan 2022 |
| Amanora Gateway Towers 98 and 99P52100000321 | Amanora Park Town, Pune | - | Jul 2017 | Completed | Dec 2018 | Dec 2018 |
| Amanora Future Tower, Sector R11 | Sector R11 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 411028 | 1,117 | - | Completed | Mar 2017 | Feb 2017 |
| Amanora Aspire Towers, Sector R3 | Plot No 68 Sector R3 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 411028 | 400 | - | Completed | Nov 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Amanora Gateway Towers 2 - Towers 102 and 10 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Amanora Park Town13,700+ in Pune
Filed coordinates, straight-line distance. 189 registered projects within 2 km.
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: City Corporation Limited
City Corporation Limited has 13 registrations on MahaRERA, including Amanora Gateway Towers 98 and 99 and Amanora Gateway Tower 100. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Amanora Gateway Towers 2 - Towers 102 and 103 is delayed beyond 30 Jun 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Amanora Gateway Towers 2 - Towers 102 and 103?
The registered promoter entity is City Corporation Limited, a company as per the filing. Its CIN U45202PN2003PLC018435 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Amanora Gateway Towers 2 - Towers 102 and 103?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Amanora Gateway Towers 2 - Towers 102 and 103?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Amanora Gateway Towers 2 - Towers 102 and 103?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Amanora Gateway Towers 2 - Towers 102 and 103?
The professionals named in the filing: Architect: GNA Architects; Engineer: MR MANDAR KULKARNI; Chartered Accountant: SPCM & Associates; Chartered Accountant: SPCM and Associates; Chartered Accountant: A S Jinturkar and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Amanora Gateway Towers 2 - Towers 102 and 103?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback