Home / Browse projects / Pune, Maharashtra / Amanora Gateway Tower 100
Amanora Gateway Tower 100
RG-MH-02415 · RERA P52100000380 · Last updated on MahaRERA portal: 1 Aug 2023
Source: official MahaRERA filing
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 7 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Amanora Gateway Tower 100 is a Residential / Group Housing project by City Corporation Limited in Pune, Maharashtra, registered with MahaRERA as P52100000380 on 15 Jul 2017. The registration is recorded completed; possession was promised by 29 Apr 2022. The completion date has moved by 24 months from the original filing.
At a glance
Project
- NameAmanora Gateway Tower 100
- TypeResidential / Group Housing
- Location
- Amanora Internal Road
- Amanora Park Town
- Hadapsar
- Haveli
- Pune
- 411028
- Pincode411028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100000380
- ReraGenie IDRG-MH-02415
Builder
- NameCity Corporation Limited
- Entity typeCompany
- CINU45202PN2003PLC018435
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorsAniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande
- Other registrations12 more →
- Completed9 of 13
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on15 Jul 2017
- Promised completion29 Apr 2022
- Revised completionRevised to 29 Apr 2022 (originally 30 Apr 2020)
- Buildings1 building record
- Documents filed87 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 100 | NA | 46 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Tower 100: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities23
As on 1 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
| Club House | Yes | 100% |
| Entrance lobby | Yes | 100% |
| Garbage chute | Yes | 100% |
| Gymnasium | Yes | 100% |
| Intercom facility | Yes | 100% |
| Lifts | Yes | 100% |
| Swimming pool | Yes | 100% |
| Power Backup for Common Utilities | Yes | 100% |
Parking filed332
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership37
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Arvind Bhikaji Tupe | Pune (M Corp.) | Pune |
| Ashish Arvind Tupe | Pune (M Corp.) | Pune |
| Dipali Ashish Tupe | Pune (M Corp.) | Pune |
| Nandkumar G. Ghule | Pune (M Corp.) | Pune |
| Sangita Nandakumar Ghule | Pune (M Corp.) | Pune |
| Nitin Narayan Shewale | Pune (M Corp.) | Pune |
| Asha Narayan Shewale | Pune (M Corp.) | Pune |
| Sapna Ramdas Bagade | Pune (M Corp.) | Pune |
| Sangita Satish Gavhane | Pune (M Corp.) | Pune |
| Vilas Shankar Tupe | Pune (M Corp.) | Pune |
| Nirmala Vilas Tupe | Pune (M Corp.) | Pune |
| Mandar Vilas Tupe | Pune (M Corp.) | Pune |
| Balasaheb Shankar Tupe | Pune (M Corp.) | Pune |
| Sangeeta Balasaheb Tupe | Pune (M Corp.) | Pune |
| Amit Balasaheb Tupe | Pune (M Corp.) | Pune |
| Abhijit Balasaheb Tupe | Pune (M Corp.) | Pune |
| Ashok Shankar Tupe | Pune (M Corp.) | Pune |
| Minakshi Ashok Tupe | Pune (M Corp.) | Pune |
| Ajinkya Ashok Tupe | Pune (M Corp.) | Pune |
| Chetan Ashok Tupe | Pune (M Corp.) | Pune |
| Sandeep Maruti Tupe | Pune (M Corp.) | Pune |
| Dnyaneshwar Shankar Tupe | Pune (M Corp.) | Pune |
| Surekha Dnyaneshwar Tupe | Pune (M Corp.) | Pune |
| Prasad Dnyaneshwar Tupe | Pune (M Corp.) | Pune |
| Siddharath Dnyaneshwar Tupe | Pune (M Corp.) | Pune |
| Kalidas Sopan Bahirat | Pune (M Corp.) | Pune |
| Savita Kalidas Bahirat | Pune (M Corp.) | Pune |
| Nandakumar Sopan Bahirat | Pune (M Corp.) | Pune |
| Swapna Nandkumar Bahirat | Pune (M Corp.) | Pune |
| Ratan N. Tupe | Pune (M Corp.) | Pune |
| Kantilal N. Tupe | Pune (M Corp.) | Pune |
| Maruti Patilbuva Tupe | Pune (M Corp.) | Pune |
| Laxmibai Maruti Tupe | Pune (M Corp.) | Pune |
| Ghanshyam Maruti Tupe | Pune (M Corp.) | Pune |
| Milind Maruti Tupe | Pune (M Corp.) | Pune |
| Tejkumar Maruti Tupe | Pune (M Corp.) | Pune |
| Saranga Mahendra Bahirat | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Integrid Design Consultants Pvt. Ltd. |
| Engineer | J+W Consultants LLP |
| Partner | Role in project |
|---|---|
| City Corporation Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. Sand is a critical raw material. River sand was banned by the government for environmental reasons, that created shortage and substitute material was not readily available. 2. Elections were held in October 2019 (state) and April 2019 (Central) and migrant workers went on leave creating manpower shortage. 3. Heavy and prolonged rains in 2019 Monsoon created frequent and prolonged work stoppages and flooding of material storage at vendors affected the supply chain. 4. Strike in the crusher plants for royalty related issue resulted in complete stoppage of work on site and it took time to get
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jun 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jun 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 May 2023
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Amanora Gateway Tower 100 30062022.pdf | 1 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Amanora Gateway Tower 100 30062023.pdf | 20 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Amanora Gateway Tower 100 31032022.pdf | 16 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Amanora Gateway Tower 100 31032022.pdf | 16 Jun 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate Tower 100.pdf | 3 May 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Occupation Certificate Tower 100.pdf | 2 May 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Declaration From 4 Tower 100.pdf | 2 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Gateway Tower.pdf | 23 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 Amanora Gateway Tower 100 31032022.pdf | 15 Nov 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Final OC Gateway Towers 100.pdf | 5 May 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Gateway Tower 100.pdf | 5 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Amanora Gateway Tower 100 19 03012022.pdf | 8 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Amanora Gateway Tower 100 19 31122021.pdf | 7 Jan 2022 |
| Certificates of CA (Form 3)File: Form 3 - Gateway.pdf | 7 Jan 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 02 Formation of society Amanora letter to RERA 06012022.pdf | 7 Jan 2022 |
| Declaration about Commencement CertificateFile: Declaration about cc Amanora Gateway tower 100.pdf | 14 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Amanora Gateway tower 100 Form 2A Sep 2021.pdf | 14 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory Amanora Gateway 100 14 10 2021.pdf | 14 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Amanora Gateway Towers Phase 2 Form 5 T100 3.pdf | 14 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 02 Amanora Gateway Tower 100 Engineer Certificate 18.pdf | 7 Oct 2021 |
| Certificates of CA (Form 3)File: Form 03 Amanora Gateway Tower 100 CA Certificate 18.pdf | 7 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 01 Amanora Gateway Tower 100 Architect Certificate 18.pdf | 6 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 01 Amanora Gateway Tower 100 Architect Certificate 18.pdf | 6 Oct 2021 |
| Certificates of CA (Form 5)File: Amanora Gateway Towers Phase 2 Form 5 T100 3.pdf | 6 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 01- Amanora Gateway Towe 100- Architect Certificate 17.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate- Amanora Gateway Tower 100 (17).pdf | 14 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3 Certificate Gateway T 100.pdf | 14 Aug 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Formation of Legal Entity.pdf | 26 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory Gateway -100.pdf | 15 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 01- Amanora Gateway Towe 100- Architect Certificate (16).pdf | 1 Jul 2021 |
| Certificates of CA (Form 5)File: Form 5 Gateway Tower 100.pdf | 21 Apr 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Gateway Tower 100.pdf | 21 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 01- Amanora Gateway Towe 100- Architect Certificate (15).pdf | 31 Mar 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Amanora Gateway Tower 100 (15).pdf | 31 Mar 2021 |
| Certificates of CA (Form 3)File: Form 03 CA certificate.pdf | 31 Mar 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 01- Amanora Gateway Towe 100- Architect Certificate (13).pdf | 19 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Amanora Gateway Tower 100 (13).pdf | 19 Nov 2020 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate Gateway Towers 30-06-20.pdf | 19 Nov 2020 |
| Details of Restarting of Construction work post lockdownFile: Amanora Gateway tower 100 Details of Restarting of Construction work post lockdown.pdf | 23 Jun 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Engineer Certificate- Amanora Gateway Tower 100 (12).pdf | 18 Jun 2020 |
| Certificates of CA (Form 3)File: Form 3- Amanora Gateway Tower 100- CA Certificate (12).pdf | 18 Jun 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 01- Amanora Gateway Towe 100- Architect Certificate (12).pdf | 15 Jun 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 01 Amanora Gateway Towe 100 Architect Certificate 10.pdf | 13 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 02 Amanora Gateway Tower 100 Engineer Certificate 10.pdf | 13 Mar 2020 |
| Certificates of CA (Form 3)File: Form 03 Amanora Gateway Tower 100 CA Certificate 10.pdf | 13 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 02 Amanora Gateway Tower 100 Engineer Certificate 9.pdf | 3 Jan 2020 |
| Certificates of CA (Form 3)File: Form 03 Amanora Gateway Tower 100 CA Certificate 9.pdf | 3 Jan 2020 |
| Certificates of CA (Form 5)File: Form 5 Tower 100.pdf | 27 Nov 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Tower 100.pdf | 27 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 01 Amanora Gateway Tower 100 Architect Certificate 9.pdf | 14 Nov 2019 |
| Certificates of CA (Form 5)File: Amanora Gateway Towers Phase 2 Form 5 T100 2.pdf | 30 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Tower 100 Architect Certificate 8.pdf | 16 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Tower 100 Engineer Certificate 7.pdf | 23 Jul 2019 |
| Certificates of CA (Form 3)File: Amanora Gateway Tower 100 CA Certificate 7.pdf | 23 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Tower 100 Architect Certificate 7.pdf | 12 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Tower 100 Engineer Certificate 6.pdf | 13 May 2019 |
| Certificates of CA (Form 3)File: Amanora Gateway Tower 100 CA Certificate 6.pdf | 13 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Tower 100 Architect Certificate 6.pdf | 1 Mar 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Tower 100 Engineer Certificate 5.pdf | 15 Nov 2018 |
| Certificates of CA (Form 3)File: Amanora Gateway Tower 100 CA Certificate 5.pdf | 15 Nov 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Tower 100 Architect Certificate 5.pdf | 6 Nov 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Tower 100 Engineer Certificate 4.pdf | 3 Oct 2018 |
| Certificates of CA (Form 3)File: Amanora Gateway Tower 100 CA Certificate 4.pdf | 3 Oct 2018 |
| Certificates of CA (Form 5)File: Form 5 Gateway Towers 100.pdf | 29 Sep 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Towe 100- Architect Certificate 4.pdf | 14 Aug 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 2 Engineer Certificate T 100 3.pdf | 2 Jun 2018 |
| Certificates of CA (Form 3)File: Amanora Gateway Towers Phase 2 CA Certificate T 100 3.pdf | 2 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 2 Architect Certificate T 100 3.pdf | 4 May 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Tower 100 Engineer Certificate (3).pdf | 18 Jan 2018 |
| Certificates of CA (Form 3)File: Amanora Gateway Tower 100 CA Certificate (3).pdf | 18 Jan 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 2 Architect Certificate T 100 3.pdf | 15 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 2 Engineer Certificate T100 2.pdf | 26 Oct 2017 |
| Certificates of CA (Form 3)File: Amanora Gateway Towers Phase 2 CA Certificate T100 2.pdf | 26 Oct 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 2 Architect Certificate T100 2.pdf | 18 Oct 2017 |
| Details of encumbrancesFile: Encumbrance Certificate_100.pdf | 7 Jul 2017 |
| Declaration in FORM BFile: Form B and BR Gateway Tower T100.pdf | 7 Jul 2017 |
| Certificates of CA (Form 3)File: Amanora Gateway Towers Phase 2 CA Certificate T100.pdf | 7 Jul 2017 |
| Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for Lease T100.pdf | 7 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 2 Engineer Certi T00.pdf | 6 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate T100.pdf | 5 Jul 2017 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Amanora Ascent Towers 48 and 49P52100030032 | Amanora Park Town, Pune | - | Jul 2021 | Completed | Sep 2025 | Oct 2024 |
| Amanora Gold Towers 44, 45 and 46P52100017962 | Amanora Park Town, Pune | - | Oct 2018 | Completed | May 2024 | May 2024 |
| Amanora Gold Towers 42 and 43P52100017612 | Amanora Park Town, Pune | - | Aug 2018 | Completed | Dec 2023 | Jun 2023 |
| Amanora Adreno TowersP52100001822 | Amanora Park Town, Pune | - | Jul 2017 | Completed | Mar 2022 | Jan 2022 |
| Amanora Gateway Towers 98 and 99P52100000321 | Amanora Park Town, Pune | - | Jul 2017 | Completed | Dec 2018 | Dec 2018 |
| Amanora Future Tower, Sector R11 | Sector R11 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 411028 | 1,117 | - | Completed | Mar 2017 | Feb 2017 |
| Amanora Aspire Towers, Sector R3 | Plot No 68 Sector R3 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 411028 | 400 | - | Completed | Nov 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
Keep Amanora Gateway Tower 100 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Amanora Park Town13,700+ in Pune
Filed coordinates, straight-line distance. 201 registered projects within 2 km.
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: City Corporation Limited
City Corporation Limited has 13 registrations on MahaRERA, including Amanora Gateway Towers 98 and 99 and Amanora Gateway Tower 100. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Amanora Gateway Tower 100 is delayed beyond 29 Apr 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Amanora Gateway Tower 100?
The registered promoter entity is City Corporation Limited, a company as per the filing. Its CIN U45202PN2003PLC018435 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Amanora Gateway Tower 100?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Amanora Gateway Tower 100?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Amanora Gateway Tower 100?
The professionals named in the filing: Architect: Integrid Design Consultants Pvt. Ltd.; Engineer: J+W Consultants LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Amanora Gateway Tower 100?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.