Completed No litigation declared Residential / Group Housing project

Amanora Gateway Towers 98 and 99

By City Corporation Limited

RG-MH-02404 · RERA P52100000321 · Last updated on MahaRERA portal: 16 Jun 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 7 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

Amanora Gateway Towers 98 and 99 is a Residential / Group Housing project by City Corporation Limited in Pune, Maharashtra, registered with MahaRERA as P52100000321 on 15 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2018.

At a glance

Project

  • NameAmanora Gateway Towers 98 and 99
  • TypeResidential / Group Housing
  • Location
    • Amanora Internal Road
    • Amanora Park Town
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000321
  • ReraGenie IDRG-MH-02404

Builder

  • NameCity Corporation Limited
  • Entity typeCompany
  • CINU45202PN2003PLC018435
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorsAniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande
  • Other registrations12 more →
  • Completed9 of 13
  • Declared earlier projects8 →

Key dates

this monthRegisteredJul 2017PromisedDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jul 2017
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings2 building records
  • Documents filed40 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 98NA280000
Tower 99NA300000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

Tower 98100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower 99100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities23

As on 16 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Swimming poolYes100%
Club HouseYes100%
Power Backup for Common UtilitiesYes100%
LiftsYes100%
Entrance lobbyYes100%
Garbage chuteYes100%
GymnasiumYes100%
Intercom facilityYes100%

Parking filed398

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots398
Closed/Covered398
BuildingClosed/CoveredTotal
Tower 98197197
Tower 99201201

Land and ownership37

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area32,482 sq m
Land owned byThe promoter, with other names on the file
Named landowners37
LandownerVillageDistrict
Ashok Shankar TupePune (M Corp.)Pune
Kalidas Sopan BahiratPune (M Corp.)Pune
Savita Kalida BahiratPune (M Corp.)Pune
Nandakumar Sopan BahiratPune (M Corp.)Pune
Sapna Nandkumar BahiratPune (M Corp.)Pune
Ratan. N. TupePune (M Corp.)Pune
Kantilal N. TupePune (M Corp.)Pune
Maruti Patilbua TupePune (M Corp.)Pune
Laxmibai Maruti TupePune (M Corp.)Pune
Ghanshyam Maruti TupePune (M Corp.)Pune
Milind Maruti TupePune (M Corp.)Pune
Tejkumar Maruti TupePune (M Corp.)Pune
Arvind Bhikaji TupePune (M Corp.)Pune
Ashish Arvind TupePune (M Corp.)Pune
Dipali Ashish TupePune (M Corp.)Pune
Nandkumar G. GhulePune (M Corp.)Pune
Sangita Nandkumar GhulePune (M Corp.)Pune
Nitin Narayan ShewalePune (M Corp.)Pune
Asha Narayan ShewalePune (M Corp.)Pune
Sapana Ramdas BagadePune (M Corp.)Pune
Saranga Mahendra BahiratPune (M Corp.)Pune
Sangeeta Satish GavhanePune (M Corp.)Pune
Vilas Shankar TupePune (M Corp.)Pune
Nirmala Vilas TupePune (M Corp.)Pune
Mandar Vilas TupePune (M Corp.)Pune
Balasaheb Shankar TupePune (M Corp.)Pune
Sangeeta Balasaheb TupePune (M Corp.)Pune
Amit Balasaheb TupePune (M Corp.)Pune
Abhijit Balasaheb TupePune (M Corp.)Pune
Minakshi Ashok TupePune (M Corp.)Pune
Ajinkya Ashok TupePune (M Corp.)Pune
Chetan Ashok TupePune (M Corp.)Pune
Sandeep Maruti TupePune (M Corp.)Pune
Dnyaneshwar Shankar TupePune (M Corp.)Pune
Surekha Dnyaneshwar TupePune (M Corp.)Pune
Prasad Dnyaneshwar TupePune (M Corp.)Pune
Siddharth Dnyaneshwar TupePune (M Corp.)Pune

Approvals and building plan

Permissible FSI31713.74
Proposed, not sanctioned31,714 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch562 7 River View Apt Opp Sawarkar Bhawan Congress house rd Shivajinagar, Dist Pune, Maharashtra-4110

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIntegrid Design Consultants Pvt. Ltd. (LIASION ARCHITECT/ ARCHITECT ON RECORD)
EngineerJ+W Consultants LLP
PartnerRole in project
City Corporation Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jun 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Apr 2023

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Amanora Gateway Tower 98 And 99 31032023.pdf16 Jun 2023
Certificates of Architect (Form 4)File: Revised Form 4 T 98 99.pdf11 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate T98-T99.pdf24 Apr 2023
Certificates of Architect (Form 4)File: Completion Certificate T98-T99.pdf13 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: 02 Formation of society Amanora letter to RERA 06012022.pdf7 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Formation of Legal Entity.pdf26 Jul 2021
Certificates of CA (Form 5)File: Amanora Gateway Towers Phase 1 Form 5 T 98 and T99 2.pdf30 Sep 2019
Certificates of CA (Form 3)File: Amanora Gateway Tower 98 and 99 CA Certificate 7.pdf23 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Tower 98 and 99 Engineer Certificate 6.pdf16 Apr 2019
Certificates of CA (Form 3)File: Amanora Gateway Tower 98 and 99 CA Certificate 6.pdf16 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Tower 98 and 99 Architect Certificate 6.pdf1 Mar 2019
Certificates of Architect (Form 4)File: Form 4 Architect Certificate Gateway Towers 98 and 99.pdf10 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Tower 98 and 99 Engineer Certificate 5.pdf15 Nov 2018
Certificates of CA (Form 3)File: Amanora Gateway Tower 98 and 99 CA Certificate 5.pdf15 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Tower 98 and 99 Architect Certificate 5.pdf6 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Tower 98 and 99 Engineer Certificate 4.pdf3 Oct 2018
Certificates of CA (Form 3)File: Amanora Gateway Tower 98 and 99 CA Certificate 4.pdf3 Oct 2018
Certificates of CA (Form 5)File: Form 5 Gateway Towers 98 and 99.pdf29 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanaora Gateway Tower 98 and 99- Architect Certificate 4.pdf14 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 1 Engineer Certificate T 98 and T99 3.pdf2 Jun 2018
Certificates of CA (Form 3)File: Amanora Gateway Towers Phase 1 CA Certificate T 98 and T99 3.pdf2 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 1 Architect Certificate T 98 and T99 3.pdf4 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Tower 98 and 99 Engineer Certificate 3.pdf23 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 1 Architect Certificate T 98 and T99 3.pdf15 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 1 Engineer Certificate T 98 and T99 2.pdf26 Oct 2017
Certificates of CA (Form 3)File: Amanora Gateway Towers Phase 1 CA Certificate T 98 and T99 2.pdf26 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 1 Architect Certificate T 98 and T99 2.pdf18 Oct 2017
Certificates of CA (Form 3)File: CA Certificate 98 and 99.pdf7 Jul 2017
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for lease.pdf7 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate T98 and 99.pdf6 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 1Architect Certificate T 98 and T99.pdf6 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Amanora Gateway Towers Phase 1 Engineer T98 and T99.pdf6 Jul 2017
Copy of the legal title reportFile: Title Certificate T98 and T99.pdf5 Jul 2017
Declaration in FORM BFile: Form B and BR .pdf5 Jul 2017
Layout approvalFile: R8 Layout.pdf22 Jun 2017
Building plan approvalFile: R8 Layout.pdf22 Jun 2017
PAN CardFile: Pan Card CCL.pdf22 Jun 2017
Copy of Layout Approval (in case of layout)File: R8 Layout.pdf22 Jun 2017
Building Plan Approval (IOD)File: R8 Layout.pdf22 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: Sector_R-3_R-8_Plot_no_69_Gateway_Tower_Permission.pdf22 Jun 2017

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Amanora Ascent Towers 48 and 49P52100030032Amanora Park Town, Pune-Jul 2021CompletedSep 2025Oct 2024
Amanora Gold Towers 44, 45 and 46P52100017962Amanora Park Town, Pune-Oct 2018CompletedMay 2024May 2024
Amanora Gold Towers 42 and 43P52100017612Amanora Park Town, Pune-Aug 2018CompletedDec 2023Jun 2023
Amanora Gateway Tower 100P52100000380Amanora Park Town, Pune-Jul 2017CompletedApr 2022Registered original: Apr 2020Apr 2022
Amanora Adreno TowersP52100001822Amanora Park Town, Pune-Jul 2017CompletedMar 2022Jan 2022
Amanora Future Tower, Sector R11Sector R11 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 4110281,117-CompletedMar 2017Feb 2017
Amanora Aspire Towers, Sector R3Plot No 68 Sector R3 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 411028400-CompletedNov 2016Oct 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Amanora Gateway Towers 98 and 99 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Amanora Park Town13,700+ in Pune

2 kmAmanora Gateway Towers 9Completed 87Lapsed / revoked 19Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 192 registered projects within 2 km.

Builder: City Corporation Limited

City Corporation Limited has 13 registrations on MahaRERA, including Amanora Gateway Towers 98 and 99 and Amanora Gateway Tower 100. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Amanora Gateway Towers 98 and 99 is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amanora Gateway Towers 98 and 99?

The registered promoter entity is City Corporation Limited, a company as per the filing. Its CIN U45202PN2003PLC018435 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amanora Gateway Towers 98 and 99?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Amanora Gateway Towers 98 and 99?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amanora Gateway Towers 98 and 99?

The professionals named in the filing: Architect: Integrid Design Consultants Pvt. Ltd. (LIASION ARCHITECT/ ARCHITECT ON RECORD); Engineer: J+W Consultants LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amanora Gateway Towers 98 and 99?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amanora Gateway Towers 98 and 99. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amanora Gateway Towers 98 and 99 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.