Amanora Gold Towers 42 and 43
RG-MH-69022 · RERA P52100017612 · Last updated on MahaRERA portal: 15 Jan 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 7 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Amanora Gold Towers 42 and 43 is a Residential / Group Housing project by City Corporation Limited in Pune, Maharashtra, registered with MahaRERA as P52100017612 on 29 Aug 2018. The registration is recorded completed; possession was promised by 30 Dec 2023. 1 complaint is on record with the regulator.
At a glance
Project
- NameAmanora Gold Towers 42 and 43
- TypeResidential / Group Housing
- Location
- Hadapsar-Kharadi bypass
- Amanora Park Town
- Hadapsar
- Haveli
- Pune
- 411028
- Pincode411028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100017612
- ReraGenie IDRG-MH-69022
Builder
- NameCity Corporation Limited
- Entity typeCompany
- CINU45202PN2003PLC018435
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorsAniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande
- Other registrations12 more →
- Completed9 of 13
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on29 Aug 2018
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings2 building records
- Documents filed72 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 42 | NA | 37 | 0 | 0 | 0 | 0 |
| Tower 43 | NA | 37 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 15 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
Tower 42100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower 43100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities23
As on 15 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
| Intercom facility | Yes | 100% |
| Gymnasium | Yes | 100% |
| Garbage chute | Yes | 100% |
| Entrance lobby | Yes | 100% |
| Club House | Yes | 100% |
| Lift | Yes | 100% |
| Power Backup for Common utilities | Yes | 100% |
| Swimming Pool | Yes | 100% |
Parking filed666
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Tower 42 | 382 | 382 |
| Tower 43 | 284 | 284 |
Land and ownership37
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Arvind Bhikaji Tupe | Pune (M Corp.) | Pune |
| Ashish Arvind Tupe | Pune (M Corp.) | Pune |
| Dipali Ashish Tupe | Pune (M Corp.) | Pune |
| Nandkumar G Ghule | Pune (M Corp.) | Pune |
| Sangita Nandkumar Ghule | Pune (M Corp.) | Pune |
| Nitin Narayan Shewale | Pune (M Corp.) | Pune |
| Asha Narayan Shewale | Pune (M Corp.) | Pune |
| Sapana Ramdas Bagade | Pune (M Corp.) | Pune |
| Saranga Mahendra Bahirat | Pune (M Corp.) | Pune |
| Sangeeta Satish Gavhane | Pune (M Corp.) | Pune |
| Vilas Shankar Tupe | Pune (M Corp.) | Pune |
| Nirmala Vilas Tupe | Pune (M Corp.) | Pune |
| Mandar Vilas Tupe | Pune (M Corp.) | Pune |
| Balasaheb Shankar Tupe | Pune (M Corp.) | Pune |
| Sangeeta Balasaheb Tupe | Pune (M Corp.) | Pune |
| Amit Balasaheb Tupe | Pune (M Corp.) | Pune |
| Abhijit Balasaheb Tupe | Pune (M Corp.) | Pune |
| Ashok Shankar Tupe | Pune (M Corp.) | Pune |
| Minakshi Ashok Tupe | Pune (M Corp.) | Pune |
| Ajinkya Ashok Tupe | Pune (M Corp.) | Pune |
| Chetan Ashok Tupe | Pune (M Corp.) | Pune |
| Sandeep Maruti Tupe | Pune (M Corp.) | Pune |
| Dnyaneshwar Shankar Tupe | Pune (M Corp.) | Pune |
| Surekha Dnyaneshwar Tupe | Pune (M Corp.) | Pune |
| Prasad Dnyaneshwar Tupe | Pune (M Corp.) | Pune |
| Siddharth Dnyaneshwar Tupe | Pune (M Corp.) | Pune |
| Kalidas Sopan Bahirat | Pune (M Corp.) | Pune |
| Savita Kalidas Bahirat | Pune (M Corp.) | Pune |
| Nandkumar Sopan Bahirat | Pune (M Corp.) | Pune |
| Ratan N. Tupe | Pune (M Corp.) | Pune |
| Kantilal N. Tupe | Pune (M Corp.) | Pune |
| Maruti Patilbua Tupe | Pune (M Corp.) | Pune |
| Laxmibai Maruti Tupe | Pune (M Corp.) | Pune |
| Ghanshyam Maruti Tupe | Pune (M Corp.) | Pune |
| Milind Maruti Tupe | Pune (M Corp.) | Pune |
| Tejkumar Maruti Tupe | Pune (M Corp.) | Pune |
| Swapna Nandkumar Bahirat | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Integrid Design Consultants Pvt. Ltd. |
| Engineer | J+W Consultants LLP |
| Partner | Role in project |
|---|---|
| City Corporation Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12500812 | City Corporation Limited through its Authorized Signatory Atul Surdas Gogawale | Gautam Ramrao Wawle | 10/03/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Aug 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Aug 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Aug 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Dec 2023
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Gold Ph_I 31-03-2024.pdf | 15 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Amanora Gold OC T42 43 07062023.pdf | 22 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Format-FORM 4 - Amanora Gold Towers 42 - 43.pdf | 22 Dec 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Format-FORM 4 - Amanora Gold Towers 42 - 43.pdf | 22 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Gold Ph_I 31-03-2023.pdf | 13 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Amanora Gold Tower 42 and 43 Phase 1- 31032023.pdf | 2 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3 Gold Ph-I_ T042 TO 043 30062023.pdf | 5 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Tower 42 and 43 30062023.pdf | 27 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Tower 42 and 43 31032023.pdf | 17 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Tower 42 and 43 Phase 1 - 31032023.pdf | 17 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 Gold Tower T042 TO 043 310323.pdf | 9 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 Gold Ph I 31122022.pdf | 16 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Gold Ph-I.pdf | 23 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Tower 42 and 43 31120200.pdf | 19 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Amanora Gold Towers 42 43 Form 5 1819.pdf | 19 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Amanora Gold Towers 42 43 Form 5 2.pdf | 19 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Tower 42 and 43 30092022.pdf | 18 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Tower 42 and 43 Phase 1 31122022.pdf | 18 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 Gold Ph-I 30-09-2022.pdf | 25 Nov 2022 |
| Certificates of CA (Form 3)File: Form 3 Gold Ph_1 Towers 30062022.pdf | 14 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amanora Gold 42 43.pdf | 14 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Tower 42 and 43 14.pdf | 13 Jun 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amanora Gold Tower 42 and 43 Phase 1 14.pdf | 13 Jun 2022 |
| Certificates of CA (Form 3)File: Form 3 Phase 1 Gold towers 42 and 43.pdf | 13 Jun 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amanora Gold Tower 42 and 43 Phase 1 31122021.pdf | 8 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amanora Gold Tower 42 and 43 13 31122021.pdf | 7 Jan 2022 |
| Certificates of CA (Form 3)File: Form 3 - Gold Tower Phase 1.pdf | 7 Jan 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 02 Formation of society Amanora letter to RERA 06012022.pdf | 7 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amanora Gold Towers 42 and 43 Phase 1 Architect Certificate 12.pdf | 7 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amanora Gold Towers 42 and 43 Phase 1 Engineer Certificate 12.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5)File: Amanora Gold Towers 42 43 Form 5 2.pdf | 6 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Towers 42 and 43 (Phase 1)- Architect Certificate (11).pdf | 14 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Towers 42 and 43 (Phase 1)- Engineer Certificate (11).pdf | 14 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3 Certificate Gold Phase1.pdf | 14 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Towers 42 and 43 (Phase 1)- Architect Certificate (11)_compressed.pdf | 5 Aug 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Formation of Legal Entity.pdf | 26 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Gold Towers 042.pdf | 24 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Gold Towers 043.pdf | 24 Jul 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Towers 42 and 43 (Phase 1)- Engineer Certificate R1 (10).pdf | 21 Jun 2021 |
| Certificates of CA (Form 3)File: Form 3 - Amanora Gold Towers 42 and 43 (Phase 1)- CA Certificate Dec.pdf | 21 Jun 2021 |
| Certificates of CA (Form 3)File: Form 3 - Amanora Gold Towers 42 and 43 (Phase 1)- CA Certificate.pdf | 21 Jun 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Towers 42 and 43 (Phase 1)- Architect Certificate (10).pdf | 18 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5)File: Form 5 Gold Phase 1.pdf | 21 Apr 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Gold Phase 1.pdf | 21 Apr 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Towers 42 and 43 (Phase 1)- Architect Certificate (08).pdf | 19 Nov 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Towers 42 and 43 (Phase 1)- Engineer Certificate (8)_compressed.pdf | 19 Nov 2020 |
| Certificates of CA (Form 3)File: Form 3 - GOLD-I CA Certificate.pdf | 19 Nov 2020 |
| Details of Restarting of Construction work post lockdownFile: Amanora Gold Towers 42 and 43 Details of Restarting of Construction work post lockdown.pdf | 23 Jun 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Towers 42 and 43 (Phase 1)- Architect Certificate (06).pdf | 18 Jun 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Towers 42 and 43 (Phase 1)- Engineer Certificate (6).pdf | 18 Jun 2020 |
| Certificates of CA (Form 3)File: Form 3 Amanora Gold Towers 42 and 43 Phase 1 CA Certificate 6.pdf | 18 Jun 2020 |
| Certificates of CA (Form 3)File: Form 3 Amanora Gold Towers 42 and 43 (Phase 1) CA Certificate (05).pdf | 13 Mar 2020 |
| Certificates of CA (Form 3)File: Form 3 Amanora Gold Towers 42 and 43 Phase 1 CA Certificate 04.pdf | 24 Dec 2019 |
| Certificates of CA (Form 3)File: Form 3 Amanora Gold Towers 42 and 43 Phase 1 CA Certificate 03.pdf | 4 Oct 2019 |
| Certificates of CA (Form 3)File: Form 3 Amanora Gold Towers 42 and 43 Phase 1 CA Certificate 03.pdf | 4 Oct 2019 |
| Certificates of CA (Form 3)File: Form 3 Amanora Gold Towers 42 and 43 Phase 1 CA Certificate 03.pdf | 4 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: Amanora Gold Towers 42 43 Form 5.pdf | 30 Sep 2019 |
| Certificates of CA (Form 3)File: Amanora GOLD TOWERS CA Certificate 42 and 43 2.pdf | 23 Jul 2019 |
| Certificates of CA (Form 3)File: Amanora GOLD TOWERS CA Certificate 42 and 43 1.pdf | 20 Mar 2019 |
| Copy of the legal title reportFile: Title Certificate Sector R 29 Gold Towers 2.pdf | 23 Aug 2018 |
| Certificates of CA (Form 3)File: Amanora Gold Towers 42 and 43 CA Certificate 2.pdf | 23 Aug 2018 |
| Copy of the legal title reportFile: Title Certificate Sector R 29 Gold Towers .pdf | 13 Aug 2018 |
| Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for lease Gold towers.pdf | 13 Aug 2018 |
| Certificates of CA (Form 3)File: Amanora Gold Towers 42 and 43 CA Certificate.pdf | 11 Aug 2018 |
| Layout approvalFile: R29 Gold Towers Layout.pdf | 6 Aug 2018 |
| Building plan approvalFile: R29 Gold Towers Layout.pdf | 6 Aug 2018 |
| Copy of Layout Approval (in case of layout)File: R29 Gold Towers Layout.pdf | 6 Aug 2018 |
| Building Plan Approval (IOD)File: R29 Gold Towers Layout.pdf | 6 Aug 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Gold Towers R29 Commencement Certificate.pdf | 6 Aug 2018 |
| Details of encumbrancesFile: Encumbrance Certificate Gold Towers 42 and 43 R29.pdf | 31 Jul 2018 |
| Declaration in FORM BFile: Form B and BR Gold Towers 42 and 43 R29.pdf | 31 Jul 2018 |
| PAN CardFile: Pan Card CCL.pdf | 23 Jul 2018 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Amanora Ascent Towers 48 and 49P52100030032 | Amanora Park Town, Pune | - | Jul 2021 | Completed | Sep 2025 | Oct 2024 |
| Amanora Gold Towers 44, 45 and 46P52100017962 | Amanora Park Town, Pune | - | Oct 2018 | Completed | May 2024 | May 2024 |
| Amanora Gateway Tower 100P52100000380 | Amanora Park Town, Pune | - | Jul 2017 | Completed | Apr 2022Registered original: Apr 2020 | Apr 2022 |
| Amanora Adreno TowersP52100001822 | Amanora Park Town, Pune | - | Jul 2017 | Completed | Mar 2022 | Jan 2022 |
| Amanora Gateway Towers 98 and 99P52100000321 | Amanora Park Town, Pune | - | Jul 2017 | Completed | Dec 2018 | Dec 2018 |
| Amanora Future Tower, Sector R11 | Sector R11 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 411028 | 1,117 | - | Completed | Mar 2017 | Feb 2017 |
| Amanora Aspire Towers, Sector R3 | Plot No 68 Sector R3 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 411028 | 400 | - | Completed | Nov 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
Keep Amanora Gold Towers 42 and 43 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Amanora Park Town13,700+ in Pune
Filed coordinates, straight-line distance. 199 registered projects within 2 km.
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: City Corporation Limited
City Corporation Limited has 13 registrations on MahaRERA, including Amanora Gateway Towers 98 and 99 and Amanora Gateway Tower 100. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Amanora Gold Towers 42 and 43 is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Amanora Gold Towers 42 and 43?
The registered promoter entity is City Corporation Limited, a company as per the filing. Its CIN U45202PN2003PLC018435 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Amanora Gold Towers 42 and 43?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Amanora Gold Towers 42 and 43?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Amanora Gold Towers 42 and 43?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Amanora Gold Towers 42 and 43?
The professionals named in the filing: Architect: Integrid Design Consultants Pvt. Ltd.; Engineer: J+W Consultants LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Amanora Gold Towers 42 and 43?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback