Home / Browse projects / Pune, Maharashtra / Amanora Gold Towers 44, 45 and 46

Completed No litigation declared Residential / Group Housing project

Amanora Gold Towers 44, 45 and 46

By City Corporation Limited

RG-MH-71431 · RERA P52100017962 · Last updated on MahaRERA portal: 15 Jan 2025

Source: official MahaRERA filing

Red flags

  • 6 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 7 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2024Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
6Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Amanora Gold Towers 44, 45 and 46 is a Residential / Group Housing project by City Corporation Limited in Pune, Maharashtra, registered with MahaRERA as P52100017962 on 1 Oct 2018. The registration is recorded completed; possession was promised by 30 May 2024. 6 complaints are on record with the regulator.

At a glance

Project

  • NameAmanora Gold Towers 44, 45 and 46
  • TypeResidential / Group Housing
  • Location
    • Hadapsar- Kharadi Bypass
    • Amanora Park Town
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100017962
  • ReraGenie IDRG-MH-71431

Builder

  • NameCity Corporation Limited
  • Entity typeCompany
  • CINU45202PN2003PLC018435
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorsAniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande
  • Other registrations12 more →
  • Completed9 of 13
  • Declared earlier projects8 →

Key dates

this monthRegisteredOct 2018PromisedMay 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Oct 2018
  • Promised completion30 May 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 44NA370000
Tower 45NA370000
Tower 46NA370000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

Tower 44100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower 45100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower 46100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities23

As on 15 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
GymnasiumYes100%
Intercom facilityYes100%
LiftsYes100%
Power Backup for Common UtilitiesYes100%
Swimming PoolYes100%
Garbage chuteYes100%
Entrance lobbyYes100%
Common Club HouseYes100%

Parking filed920

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots920
Closed/Covered920
BuildingClosed/CoveredTotal
Tower 44251251
Tower 45256256
Tower 46413413

Land and ownership37

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area30,254 sq m
Land owned byThe promoter, with other names on the file
Named landowners37
LandownerVillageDistrict
Arvind Bhikaji TupePune (M Corp.)Pune
Ashish Arvind TupePune (M Corp.)Pune
Dipali Ashish TupePune (M Corp.)Pune
Nandkumar G GhulePune (M Corp.)Pune
Sangita Nandkumar GhulePune (M Corp.)Pune
Nitin Narayan ShewalePune (M Corp.)Pune
Asha Narayan ShewalePune (M Corp.)Pune
Sapana Ramdas BagadePune (M Corp.)Pune
Saranga Mahendra BahiratPune (M Corp.)Pune
Sangeeta Satish GavhanePune (M Corp.)Pune
Vilas Shankar TupePune (M Corp.)Pune
Nirmala Vilas TupePune (M Corp.)Pune
Mandar Vilas TupePune (M Corp.)Pune
Balasaheb Shankar TupePune (M Corp.)Pune
Sangeeta Balasaheb TupePune (M Corp.)Pune
Amit Balasaheb TupePune (M Corp.)Pune
Abhijit Balasaheb TupePune (M Corp.)Pune
Ashok Shankar TupePune (M Corp.)Pune
Minakshi Ashok TupePune (M Corp.)Pune
Ajinkya Ashok TupePune (M Corp.)Pune
Chetan Ashok TupePune (M Corp.)Pune
Sandeep Maruti TupePune (M Corp.)Pune
Dnyaneshwar Shankar TupePune (M Corp.)Pune
Surekha Dnyaneshwar TupePune (M Corp.)Pune
Prasad Dnyaneshwar TupePune (M Corp.)Pune
Siddharth Dnyaneshwar TupePune (M Corp.)Pune
Kalidas Sopan BahiratPune (M Corp.)Pune
Savita Kalidas BahiratPune (M Corp.)Pune
Nandkumar Sopan BahiratPune (M Corp.)Pune
Swapna Nandkumar BahiratPune (M Corp.)Pune
Ratan N TupePune (M Corp.)Pune
Kantilal N TupePune (M Corp.)Pune
Maruti Patilbua TupePune (M Corp.)Pune
Laxmibai Maruti TupePune (M Corp.)Pune
Ghanshyam Maruti TupePune (M Corp.)Pune
Milind Maruti TupePune (M Corp.)Pune
Tejkumar Maruti TupePune (M Corp.)Pune

Approvals and building plan

Permissible FSI65118.63
Proposed, not sanctioned65,119 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA-Wing Shangrila Gardens, Bund Garden Rd, Pune, 411001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIntegrid Design Consultants Pvt. Ltd.
EngineerJ+W Consultants LLP
PartnerRole in project
City Corporation Limited-

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC005000000269582AMAN K SIRSIKARCITY CORPORATION LIMITED01/12/2023
CC12501126City Corporation Limited through its Authorized Signatory Atul Surdas GogawaleAllen Dsouza04/04/2025
CC12501128City Corporation Limited through its Authorized Signatory Atul Surdas GogawaleShardul Sunit Deshpande04/04/2025
CC12501129City Corporation Limited through its Authorized Signatory Atul Surdas GogawaleShardul Sunit Deshpande04/04/2025
CC12501441City Corporation Limited through its Authorized Signatory Atul Surdas GogawaleSandip Balasaheb Gavade29/04/2025
CC12502772City Corporation Limited through its Authorized Signatory Atul Surdas GogawaleAllwyn Rayappan07/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Sep 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Sep 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Sep 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Jun 2024

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Gold Ph_II 31-03-2024.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 30062024.pdf24 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC T44-45-46 Combined Highlighted.pdf13 Jun 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form F Amanora Gold Towers 44 45 46.pdf13 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 31032024.pdf24 May 2024
Certificates of CA (Form 3)File: Form 3 Gold Ph-II_ T044 TO 046 31032024.pdf24 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Amanora Gold Tower 44 45 and 46- 31032024.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Tower 44, 45 and 46 31032024.pdf15 Apr 2024
Certificates of CA (Form 3)File: Form 3 Gold Ph-II_ T044 TO 046 31122023.pdf1 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Tower 44, 45 and 46 3112023.pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 31122023.pdf6 Mar 2024
Certificates of CA (Form 3)File: Gold Tower PH_2 Form 3 as on 30092023.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Tower 44, 45 and 46 (20)- 30092023.pdf21 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 (20)- 30092023.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Gold Ph_II 31-03-2023.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Amanora Gold Tower 44, 45 and 46 Phase 2- 31032023.pdf2 Sep 2023
Certificates of CA (Form 3)File: Form 3 Gold Ph-II T044 TO 046 30062023.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Tower 44 45 and 46 30062023.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 30062023.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Tower 44, 45 and 46 31032023.pdf17 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 - 31032023.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3 Gold Ph_II as on 31-03-2023.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3 Amanora Gold Tower 44 45 and 46.pdf20 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Gold Ph-II.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Tower 44, 45 and 46 31122022.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Amanora Gold Towers 44 45 46 Form 1819.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Amanora Gold Towers 44 45 46 Form 5 2.pdf19 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Tower 44, 45 and 46 30092022.pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 31122022.pdf18 Jan 2023
Declaration about Commencement CertificateFile: Declaration about commencement Gold 44,45,46.pdf26 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A Gold Towers 45 45 46 30092022.pdf26 Nov 2022
Certificates of CA (Form 3)File: Form 3 Gold Ph-II 30-09-2022.pdf25 Nov 2022
Certificates of CA (Form 3)File: Form 3 Gold Ph_2 Towers 30062022.pdf14 Nov 2022
Annual Audit Report of Statutory CA (Form 5)File: Form 3 Gold Ph_2 Towers 30062022.pdf14 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amanora Gold 44 45 46.pdf21 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amanora Gold Tower 44, 45 and 46 14.pdf13 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amanora Gold Tower 44 45 and 46 Phase 2 14.pdf13 Jun 2022
Certificates of CA (Form 3)File: Form 3 Amanora Gold Towers 44 45 and 46.pdf13 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amanora Gold Tower 44 45 and 46 Phase 2 13 31122021.pdf8 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amanora Gold Tower 44 45 and 46 13 31122021.pdf7 Jan 2022
Certificates of CA (Form 3)File: Form 3 Gold Tower Phase 2.pdf7 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: 02 Formation of society Amanora letter to RERA 06012022.pdf7 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amanora Gold Towers 44, 45 and 46 Phase 2 Architect Certificate 12.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amanora Gold Towers 44, 45 and 46 Phase 2 Engineer Certificate 12.pdf7 Oct 2021
Certificates of CA (Form 3)File: Form 3 Amanora Gold Towers 44, 45 and 46 Phase 2 CA Certificate 12.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5)File: Amanora Gold Towers 44 45 46 Form 5 2.pdf6 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Architect Certificate (11).pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Engineer Certificate (11).pdf14 Aug 2021
Certificates of CA (Form 3)File: Form 3 Certificate Gold Phase 2.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Architect Certificate (11)_compressed5 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Formation of Legal Entity.pdf26 Jul 2021
Disclosure of sold/ booked inventoryFile: Gold Towers 044-045.pdf24 Jul 2021
Disclosure of sold/ booked inventoryFile: Gold Towers 046.pdf24 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Engineer Certificate (10).pdf21 Jun 2021
Certificates of CA (Form 3)File: Form 3- Amanora Gold Towers 44, 45 and 46 (Phase 2)- CA Certificate Dec.pdf21 Jun 2021
Certificates of CA (Form 3)File: Form 3- Amanora Gold Towers 44, 45 and 46 (Phase 2)- CA Certificate Mar 21.pdf21 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Architect Certificate (10).pdf18 Jun 2021
Annual Audit Report of Statutory CA (Form 5)File: Form 5 Gold Phase 2.pdf21 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Gold Phase 2.pdf21 Apr 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Architect Certificate (08).pdf19 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Engineer Certificate (8).pdf19 Nov 2020
Certificates of CA (Form 3)File: Form 3 - GOLD-II - CA Certificate.pdf19 Nov 2020
Details of Restarting of Construction work post lockdownFile: Amanora Gold Towers 44 45 and 46 Details of Restarting of Construction work post lockdown.23 Jun 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Architect Certificate (06).pdf18 Jun 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Engineer Certificate (6).pdf18 Jun 2020
Certificates of CA (Form 3)File: Form 3 Amanora Gold Towers 44 45 and 46 Phase 2 CA Certificate 6.pdf18 Jun 2020
Certificates of CA (Form 3)File: Form 3 Amanora Gold Towers 44, 45 and 46 (Phase 2)- CA Certificate (05).pdf13 Mar 2020
Certificates of CA (Form 3)File: Form 3- Amanora Gold Towers 44, 45 and 46 (Phase 2)-CA Certificate (4).pdf11 Dec 2019
Certificates of CA (Form 3)File: Form 3 Amanora Gold Towers 44, 45 and 46 Phase 2 CA Certificate 03.pdf4 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: Amanora Gold Towers 44 45 46 Form 5.pdf30 Sep 2019
Certificates of CA (Form 3)File: Amanora GOLD TOWERS CA Certificate 44 45 and 46 2.pdf24 Aug 2019
Certificates of CA (Form 3)File: Amanora GOLD TOWERS CA Certificate 42 and 43 2.pdf23 Jul 2019
Certificates of CA (Form 3)File: Amanora GOLD TOWERS CA Certificate 44 45 and 46 2.pdf23 Jul 2019
Certificates of CA (Form 3)File: Amanora GOLD TOWERS CA Certificate 44 45 and 46 1.pdf20 Mar 2019
Building plan approvalFile: R29 Gold Towers Layout.pdf8 Sep 2018
Layout approvalFile: R29 Gold Towers Layout.pdf8 Sep 2018
Copy of Layout Approval (in case of layout)File: R29 Gold Towers Layout.pdf8 Sep 2018
Building Plan Approval (IOD)File: R29 Gold Towers Layout.pdf8 Sep 2018
Certificates of CA (Form 3)File: Amanora Gold Towers 44 45 and 46 CA Certificate.pdf8 Sep 2018
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for lease Gold towers Phase-II.pdf7 Sep 2018

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Amanora Ascent Towers 48 and 49P52100030032Amanora Park Town, Pune-Jul 2021CompletedSep 2025Oct 2024
Amanora Gold Towers 42 and 43P52100017612Amanora Park Town, Pune-Aug 2018CompletedDec 2023Jun 2023
Amanora Gateway Tower 100P52100000380Amanora Park Town, Pune-Jul 2017CompletedApr 2022Registered original: Apr 2020Apr 2022
Amanora Adreno TowersP52100001822Amanora Park Town, Pune-Jul 2017CompletedMar 2022Jan 2022
Amanora Gateway Towers 98 and 99P52100000321Amanora Park Town, Pune-Jul 2017CompletedDec 2018Dec 2018
Amanora Future Tower, Sector R11Sector R11 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 4110281,117-CompletedMar 2017Feb 2017
Amanora Aspire Towers, Sector R3Plot No 68 Sector R3 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 411028400-CompletedNov 2016Oct 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Amanora Gold Towers 44, 45 and 46 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Amanora Park Town13,700+ in Pune

2 kmAmanora Gold Towers 44, Completed 87Lapsed / revoked 19Other 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 190 registered projects within 2 km.

Builder: City Corporation Limited

City Corporation Limited has 13 registrations on MahaRERA, including Amanora Gateway Towers 98 and 99 and Amanora Gateway Tower 100. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Amanora Gold Towers 44, 45 and 46 is delayed beyond 30 May 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amanora Gold Towers 44, 45 and 46?

The registered promoter entity is City Corporation Limited, a company as per the filing. Its CIN U45202PN2003PLC018435 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amanora Gold Towers 44, 45 and 46?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Amanora Gold Towers 44, 45 and 46?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Amanora Gold Towers 44, 45 and 46?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amanora Gold Towers 44, 45 and 46?

The professionals named in the filing: Architect: Integrid Design Consultants Pvt. Ltd.; Engineer: J+W Consultants LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amanora Gold Towers 44, 45 and 46?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amanora Gold Towers 44, 45 and 46. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amanora Gold Towers 44, 45 and 46 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.