Completed No litigation declared Residential / Group Housing project

Leisure Town Phase 1

By Sai Proviso Homes

RG-MH-11609 · RERA P52100002395 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • 59 complaints at MahaRERA
  • Completion date moved by 48 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
46 of 66Construction stages doneacross 6 buildings; furthest along: Slabs of Super Structure, 92%
39 of 560Units unsoldnot recorded sold or booked
59Complaints at MahaRERAon this registration
Jump to the 150 documents Report an error

Leisure Town Phase 1 is a Residential / Group Housing project by Sai Proviso Homes in Pune, Maharashtra, registered with MahaRERA as P52100002395 on 31 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 48 months from the original filing. 521 of the 560 units on this registration are recorded sold or booked, and 46 of 66 construction stages are filed complete. 59 complaints are on record with the regulator.

At a glance

Project

  • NameLeisure Town Phase 1
  • TypeResidential / Group Housing
  • Location
    • Sadesatra Nali Road
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002395
  • ReraGenie IDRG-MH-11609

Builder

  • NameSai Proviso Homes
  • Entity typePartnership
  • PartnersSanjay Motilal Gawande, Brij Mohan Achru Gupta, Sai Skyway Realty LLP, Sai Sapphire Builders and Developers LLP
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2017First promiseDec 2022Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2022)
  • Buildings6 building records
  • Documents filed150 files

Current status

93%521 of 560 units booked
85.1%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA121187087
D3NA121186086
B1NA121187087
B3NA121187087
J1NA121187087
C1NA17161260126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

46 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Slabs of Super Structure, at 92%.

A190%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D390%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B190%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B390%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
J167%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C153%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes83%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes30%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes83%
Solid Waste Management And DisposalYes83%
Water conservation /Rain water harvestingYes83%
Energy managemcntYes83%
Fire protection and fire safety requirementsYes83%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed901

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots901
Closed/Covered901
BuildingClosed/CoveredTotal
A1134134
D3126126
B1175175
B3134134
J1134134
C1198198

Land and ownership38

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area20,831 sq m
Land owned byNot the promoter
Named landowners38
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Feb 2026
LandownerVillageDistrict
Tupe DevelopersHadapsarPune
Ramdas Bhanudas Tupe-Pune
Subhadra Bhanudas Tupe-Pune
Ramdas Bhanudas Tupe-Pune
Vaishali Ramdas Tupe-Pune
Sangram Ramdas Tupe-Pune
Sandeep Bhanudas Tupe-Pune
Kanchan Sandeep Tupe-Pune
Shrushti Sandeep Tupe-Pune
Sunada Manohar Dabhade-Pune
Ganga Balassaheb Bhosale-Pune
Dnyaneshwar Dhondiba Tupe-Pune
Vanita Dnyaneshwar Tupe-Pune
Shilpa Rajesh Patil-Pune
Varsha Mahendra Khaldkar-Pune
Vaishali Mahesh Apale-Pune
Surekha Suresh Tupe-Pune
Mahesh Suresh Tupe-Pune
Manisha Mahesh Tupe-Pune
Mahi Mahesh Tupe-Pune
Tejasswi Mahesh Tupe-Pune
Meenakshi Chetan Shewale-Pune
Tukaram Tupe-Pune
Parmila Tupe-Pune
Trupti Yadav-Pune
Vitthal Tupe-Pune
Vijaya Tupe-Pune
Siddharth Tupe-Pune
Sayali Tapkir-Pune
Sopan Tupe-Pune
Megha Tupe-Pune
Hrishikesh Tupe-Pune
Sayali Tupe-Pune
Rutuja Phalke-Pune
Rohan Tupe-Pune
Aishwarya Tupe-Pune
Sushmita Bhorde-Pune
Rohan Badrinath Tupe-Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI35144.7
Proposed, not sanctioned35,145 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchground floor unit 2 Farena Corporate park, Magarpatta road, hadapsar, Pune 411028
Estimated costRs 153.69 cr
Cost incurredRs 130.86 cr
Work done85.14%
BuildingWingEstimatedIncurred
B1NARs 32.00 crRs 21.66 cr
C1NARs 32.00 crRs 21.66 cr
J1NARs 26.34 crRs 26.34 cr
-NARs 16.65 crRs 14.50 cr
A1NARs 16.00 crRs 16.00 cr
D3NARs 15.35 crRs 15.35 cr
B3NARs 15.35 crRs 15.35 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeshpande Dixit and associates
ArchitectJagdish P Deshpande
ArchitectVishal Deshpande
EngineerGA Bhilare consultants pvt ltd
EngineerToufik Gavandi
Chartered AccountantPraveen M Khatri & Co.
Chartered AccountantE.A. PATIL &ASSOCIATES LLP
PartnerRole in project
Sai Proviso Homes-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012884Dec 2022 → Dec 2023

Reason as filed by the promoterI, Sanjay Motilal Gawande, partner of M/S. SAI PROVISO HOMES, having its office address at 1201/1301, Bhumiraj Costarica, Palm Beach Road, Plot No. 1 & 2, Sec- 18, Sanpada, Navi Mumbai- 400 705 do hereby solemnly declares as under:- 1. That we are the Promoter of the proposed project of namely “Leisure Town Phase I” comprising of six (6) building to be constructed on Survey no. 202/A, 202/B/1/1 to 7, 202/B/2, 202/B/3, 202/B/4 of village-Hadapsar, Taluka- Haveli, Pune- 411028 and duly registered with MahaRERA under registration no. P52000002395. 2. That the proposed completion date of completio

EXT52100018542Dec 2022 → Dec 2024

Reason as filed by the promoterI, Sanjay Motilal Gawande, Partner of M/s. SAI PROVISO HOMES, having its office address at 1201/1301, Bhumiraj Costarica, Palm Beach Road, Plot No. 1 & 2, Sector 18, Sanpada, Navi Mumbai - 400 705 do hereby solemnly declares as under:- 1. The Promoter has proposed project namely “Leisure Town Phase I” duly registered with MahaRERA under registration no.P52000002395 comprising of six (6) residential buildings A-1, B-1, B-3, C-1, D-3 and J-1 on Survey No.202/A, 202/B/1/1 to 7, 202/B/2, 202/B/3 situated at Village Hadapsar, Taluka Haveli, Pune - 411028. 2. The Promoter has obtained part occupancy

EXT52100027279Dec 2022 → Dec 2026

Reason as filed by the promoterI, hereby apply for extension as per Order No. 40 Dated 27/12/2022 of the registered project bearing vide no P52100002395.As per HEARING DATED 25th June 2025, Hon'ble Shri Manoj Saunik Sir granted Extension upto 31/12/2026. The order is uploaded in Other Tab for your reference

Complaints filed with MahaRERA59

Case no.ComplainantRespondentFiled
CC005000000064250Abhijeet Wable and Seema WableSai Proviso Homes09/06/2020
CC005000000064254Amol Bansilal Wasnik andYogita Amol WasnikSai Proviso Homes09/06/2020
CC005000000064252Ashish Chandel & Sakshi ChandelSai Proviso Homes09/06/2020
CC005000000064348Sarika Sadashiv PawarM/s. Sai Proviso Homes17/07/2020
CC005000000064336Jagdish Rajaram MhetreM/s. Sai Proviso Homes17/07/2020
CC005000000064328Prachi Baban TatkareSai Proviso Homes17/07/2020
CC005000000064340Chinamay JadhavM/s. Sai Proviso Homes17/07/2020
CC005000000064343Sudha Ajinath MarkadM/s. Sai Proviso Homes17/07/2020
CC005000000064352Shashikant Shaligram PatilM/s. Sai Proviso Homes05/08/2020
CC005000000064354Neeraj GuptaM/s. Sai Proviso Homes17/07/2020
CC005000000064360Suresh Subhash JoshiM/s. Sai Proviso Homes17/07/2020
CC005000000064368Aditya Kumar SinghM/s. Sai Proviso Homes17/07/2020
CC005000000064363Tehsin Nasir ChinchwelkarM/s. Sai Proviso Homes17/07/2020
CC005000000064364Sudarshan Keda KapadnisM/s. Sai Proviso Homes17/07/2020
CC005000000064455Dr. Nitin Narshinha ThiteM/s. Sai Proviso Homes05/08/2020
CC005000000137157Radhika Ramakant NehreM/s Sai Proviso Homes Through its Partner Mr. Ruchin Gupta30/05/2022
CC12502012Deep Prashantkumar ShahSai Proviso Homes19/06/2025
CC12502014Rugved Chandrakant NimkarSai Proviso Homes19/06/2025
CC12502015UTPAL SHANKAR LOKHADNESai Proviso Homes20/06/2025
CC12502018Suman Ankush JadhavSai Proviso Homes20/06/2025
CC12502033Rajendra Kumar RanaSai Proviso Homes21/06/2025
CC12502036Avnish KumarSai Proviso Homes21/06/2025
CC12502037Dhananjay Ramesh ZatkeSai Proviso Homes22/06/2025
CC12502039Chirayu Narendra KotkarSai Proviso Homes22/06/2025
CC12502069Lata Sudhakar NarkhedeSai Proviso Homes25/06/2025
CC12502071Rohan Rajkumar DeoSai Proviso Homes25/06/2025
CC12502158Prasad Ramkrishna PunwatkarSai Proviso Homes30/06/2025
CC12502166Atul Manikraoji SawadeSai Proviso Homes30/06/2025
CC12502211Rajtilak Mohan KulkarniSai Proviso Homes03/07/2025
CC12502351Vijaykumar Maruti PolSai Proviso Homes11/07/2025
CC12502262Sanjay Dattatray NirmalSai Proviso Homes05/07/2025
CC12502265Kedar Rajendra SawantSai Proviso Homes05/07/2025
CC12502304Subhash LalSai Proviso Homes08/07/2025
CC12502312Bhushan Pramod AmrutkarSai Proviso Homes09/07/2025
CC12502324Prasad Subhash PatilSai Proviso Homes09/07/2025
CC12502326Vinaykumar MargamSai Proviso Homes10/07/2025
CC12502368Pranav Uddhav GaradSai Proviso Homes12/07/2025
CC12502454Anita Avinash PawarSai Proviso Homes18/07/2025
CC12502488Vishal PawarSai Proviso Homes19/07/2025
CC12502517ASHA SACHIN GHOGESai Proviso Homes22/07/2025
CC12502519Saurabh Dhondopant KulkarniSai Proviso Homes22/07/2025
CC12502530NAGESH MALLESH NAGREDDYSai Proviso Homes23/07/2025
CC12502739Sanjog PanchalSai Proviso Homes05/08/2025
CC12502799Rahul ThiteSai Proviso Homes09/08/2025
CC12502808Sujitkumar Vijaykumar MalageSai Proviso Homes10/08/2025
CC12502818Rakesh Vishnu RaundalSai Proviso Homes12/08/2025
CC12502819Rakesh Vishnu RaundalSai Proviso Homes12/08/2025
CC12502926SACHIN DUBEYSai Proviso Homes20/08/2025
CC12502927SACHIN DUBEYSai Proviso Homes20/08/2025
CC12502949Madhukar KopnarSai Proviso Homes21/08/2025
CC12600305Sai Proviso HomesManisha Narendra Kotkar16/01/2026
CC12600306Sai Proviso HomesSanjog Panchal16/01/2026
CC12600307Sai Proviso HomesRohan Rajkumar Deo16/01/2026
CC12600308Sai Proviso HomesKopnar Madhukar Shantilal16/01/2026
CC12600309Sai Proviso HomesAvnish Kumar16/01/2026
CC12600310Sai Proviso HomesSachin Dubey16/01/2026
CC12600311Sai Proviso HomesSachin Dubey16/01/2026
CC12600312Sai Proviso HomesManasi Chandrakant Nimkar16/01/2026
CC12600650Mangesh IpparSai Proviso Homes04/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Dec 2023

Documents filed150

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 150 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - March 2026.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 - March 2026_compressed.pdf11 May 2026
Withdrawal Update Form 3File: Form 3 - March 2026.pdf11 May 2026
Building plan approvalFile: A1 - D3.pdf10 Mar 2026
Building plan approvalFile: B1.pdf10 Mar 2026
Building plan approvalFile: B3.pdf10 Mar 2026
Building plan approvalFile: J1.pdf10 Mar 2026
Withdrawal Update Form 1File: Form 1 - Nov 2025 - Phase I.pdf4 Mar 2026
Withdrawal Update Form 2File: Form 2 - Nov 2025 - Phase I.pdf4 Mar 2026
Withdrawal Update Form 3File: Form 3 - Nov 2025 - Phase I_11zon (1).pdf4 Mar 2026
Layout approvalFile: Plan 1 - Highlighed.pdf20 Feb 2026
Building plan approvalFile: Plan 2.pdf20 Feb 2026
Building plan approvalFile: Plan 3.pdf20 Feb 2026
Building plan approvalFile: Plan 4.pdf20 Feb 2026
Building plan approvalFile: Plan 5.pdf20 Feb 2026
Building plan approvalFile: Plan 6.pdf20 Feb 2026
Building plan approvalFile: Plan 7.pdf20 Feb 2026
Building plan approvalFile: Plan 8.pdf20 Feb 2026
Building plan approvalFile: Plan 9.pdf20 Feb 2026
Withdrawal Update Form 1File: Form 1 - Jun 2025 - Phase I.pdf16 Feb 2026
Withdrawal Update Form 1File: Form 1 - Sep 2025 - Phase I.pdf16 Feb 2026
Withdrawal Update Form 1File: Form 1 - Nov 2025 - Phase I.pdf16 Feb 2026
Withdrawal Update Form 2File: Form 2 (1).pdf16 Feb 2026
Withdrawal Update Form 2File: Form 2 - Sep 2025 - Phase I.pdf16 Feb 2026
Withdrawal Update Form 2File: Form 2 - Nov 2025 - Phase I.pdf16 Feb 2026
Withdrawal Update Form 3File: Form 3 - Jun 2025 - Phase I.pdf16 Feb 2026
Withdrawal Update Form 3File: Form 2 - Sep 2025 - Phase I.pdf16 Feb 2026
Withdrawal Update Form 3File: Form 3 - Nov 2025 - Phase I_11zon (1).pdf16 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A - 2024-25 - Phase I_11zon.pdf16 Feb 2026
Certificates of CA (Form 3)File: Form 3 Dec 2024 Revised_11zon (1).pdf25 Jun 2025
Certificates of CA (Form 3)File: Form 3 Dec 2024 Revised_11zon (1).pdf25 Jun 2025
Declaration in FORM BFile: FORM -B.pdf22 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 24.pdf22 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 24.pdf22 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Dec 24.pdf22 Jan 2025
Certificates of CA (Form 3)File: form 3 June 2024.pdf22 Jan 2025
Certificates of CA (Form 3)File: form 3 Sep 2024.pdf22 Jan 2025
Certificates of CA (Form 3)File: Form 3 Dec 2024.pdf22 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_June'24.pdf22 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Sep'24.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29.pdf22 Jan 2025
CERSAI detailsFile: DECLARATION of Cersai.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-22-23.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_23-24.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_23-24.pdf22 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (1).pdf9 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (1).pdf9 May 2024
Certificates of CA (Form 3)File: Form 3 (1).pdf9 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I_Phase I.pdf4 May 2024
Certificates of CA (Form 3)File: Form 3 March'24.pdf4 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I (1).pdf12 Apr 2024
Certificates of CA (Form 3)File: Form III (1).pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf1 Apr 2024
OtherFile: Affidavit (1).pdf1 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Phase I.pdf17 Jan 2024
Certificates of CA (Form 3)File: Form 3_New June 23 C1 (1).pdf16 Jan 2024
Certificates of CA (Form 3)File: Form 3_New Sep-23 C1 (1).pdf16 Jan 2024
Certificates of CA (Form 3)File: Form 3_New Dec-23 C1 (1).pdf16 Jan 2024
Declaration in FORM BFile: Form B (1).pdf13 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold (1).pdf5 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_June'23 (1).pdf29 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Sep'23 (1).pdf29 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Dec'23 (1).pdf29 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate bank Account.pdf27 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: BRIJ GUPTA.pdf26 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Ruchin Gupta.pdf26 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SANJAY GAWANDE.pdf26 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SIDDHANT GAWANDE.pdf26 Dec 2023
Proforma of Agreement for saleFile: Agreement for Sale.pdf26 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 270623_Rera Certificate (C1)_June'23.pdf12 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I (C1)_Sep'23.pdf12 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: J1 BUILDING OCCUPANCY CERTIFICATE.pdf12 Dec 2023
Declaration about Commencement CertificateFile: Leisure Town Declaration.pdf16 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I.pdf16 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 _June'22.pdf16 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold.pdf16 Nov 2022
Certificates of CA (Form 3)File: FORM-III JUNE 2022.pdf16 Nov 2022
Certificates of CA (Form 3)File: Form III.pdf16 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Soc Registration Certificate.pdf16 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: B3 Society Registration Certificate.pdf16 Nov 2022

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Proviso HeightsPlot No.179 Sector 17 Ulwe135CompletedJun 2016May 2016
Proviso CornerPlot No.224 Sector 23 Ulwe62CompletedJun 2016Late, Aug 2016
Galaxy CarinaPlot No. 10 Sector 15 Kharghar Navi Mumbai89CompletedDec 2015May 2015
Proviso ComplexPlot no. 5 6 7 Sector 35E Kharghar Navi Mumbai159CompletedSep 2014Jul 2013
Galaxy OrionPlot No. 50A Sector -35D Kharghar Navi Mumbai93CompletedDec 2013Jul 2013
Galaxy NebulaPlot No. 220 and 221 Sector - 10 Kharghar Navi Mumbai.80CompletedJun 2013Late, Jul 2013

How this compares with Pune

93%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Leisure Town Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hadapsar13,700+ in Pune

2 kmLeisure Town Phase 1Completed 72Lapsed / revoked 20Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 143 registered projects within 2 km.

Builder: Sai Proviso Homes

Sai Proviso Homes has 2 registrations on MahaRERA, including Leisure Town Phase 1 and Leisure Town Phase 2. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Leisure Town Phase 1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Leisure Town Phase 1?

The registered promoter entity is Sai Proviso Homes, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Leisure Town Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Leisure Town Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Leisure Town Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Leisure Town Phase 1?

The professionals named in the filing: Architect: Deshpande Dixit and associates; Architect: Jagdish P Deshpande; Architect: Vishal Deshpande; Engineer: GA Bhilare consultants pvt ltd; Engineer: Toufik Gavandi; Chartered Accountant: Praveen M Khatri & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Leisure Town Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Leisure Town Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Leisure Town Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.