Completed No litigation declared Residential / Group Housing project

Amanora Elevate Tower 47

By City Corporation Limited

RG-MH-22559 · RERA P52100032079 · Last updated on MahaRERA portal: 20 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 8 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0 of 225Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Amanora Elevate Tower 47 is a Residential / Group Housing project by City Corporation Limited in Pune, Maharashtra, registered with MahaRERA as P52100032079 on 3 Dec 2021. The registration is recorded completed; possession was promised by 31 Dec 2025. 225 of the 225 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameAmanora Elevate Tower 47
  • TypeResidential / Group Housing
  • Location
    • Hadapsar-Kharadi Bypass
    • Amanora Park Town
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032079
  • ReraGenie IDRG-MH-22559

Builder

  • NameCity Corporation Limited
  • Entity typeCompany
  • CINU45202PN2003PLC018435
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorsAniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande
  • Other registrations12 more →
  • Completed9 of 13
  • Declared earlier projects8 →

Key dates

this monthRegisteredDec 2021PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Dec 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

100%225 of 225 units booked
100.0%Work done, per cost certificate

Figures as on 20 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 47NA33292250225

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Tower 47: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed198

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots198
Closed/Covered198

Land and ownership37

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,006 sq m
Land owned byThe promoter, with other names on the file
Named landowners37
LandownerVillageDistrict
Arvind Bhikaji TupePune (M Corp.)Pune
Ashish Arvind TupePune (M Corp.)Pune
Dipali Ashish TupePune (M Corp.)Pune
Nandkumar G GhulePune (M Corp.)Pune
Sangita Nandkumar GhulePune (M Corp.)Pune
Nitin Narayan ShewalePune (M Corp.)Pune
Asha Narayan ShewalePune (M Corp.)Pune
Sapana Ramdas BagadePune (M Corp.)Pune
Saranga Mahendra BahiratPune (M Corp.)Pune
Sangeeta Satish GavhanePune (M Corp.)Pune
Vilas Shankar TupePune (M Corp.)Pune
Nirmala Vilas TupePune (M Corp.)Pune
Mandar Vilas TupePune (M Corp.)Pune
Balasaheb Shankar TupePune (M Corp.)Pune
Sangeeta Balasaheb TupePune (M Corp.)Pune
Amit Balasaheb TupePune (M Corp.)Pune
Abhijit Balasaheb TupePune (M Corp.)Pune
Ashok Shankar TupePune (M Corp.)Pune
Minakshi Ashok TupePune (M Corp.)Pune
Ajinkya Ashok TupePune (M Corp.)Pune
Chetan Ashok TupePune (M Corp.)Pune
Sandeep Maruti TupePune (M Corp.)Pune
Dnyaneshwar Shankar TupePune (M Corp.)Pune
Surekha Dnyaneshwar TupePune (M Corp.)Pune
Prasad Dnyaneshwar TupePune (M Corp.)Pune
Siddharth Dnyaneshwar TupePune (M Corp.)Pune
Kalidas Sopan BahiratPune (M Corp.)Pune
Savita Kalidas BahiratPune (M Corp.)Pune
Nandkumar Sopan BahiratPune (M Corp.)Pune
Swapna Nandkumar BahiratPune (M Corp.)Pune
Ratan N TupePune (M Corp.)Pune
Kantilal N TupePune (M Corp.)Pune
Maruti Patilbua TupePune (M Corp.)Pune
Laxmibai Maruti TupePune (M Corp.)Pune
Ghanshyam Maruti TupePune (M Corp.)Pune
Milind Maruti TupePune (M Corp.)Pune
Tejkumar Maruti TupePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI18986.44
Proposed, not sanctioned18,986 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA-Wing Shangrila Gardens, Bund Garden Rd, Pune, 411001
Estimated costRs 97.28 cr
Cost incurredRs 97.28 cr
Work done100.0%
BuildingWingEstimatedIncurred
Tower 47NARs 94.69 crRs 94.69 cr
-NARs 2.59 crRs 2.59 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGNA Architects
EngineerMandar Kulkarni
Chartered AccountantSPCM & Associates
Chartered AccountantSPCM and Associates
Chartered AccountantA S Jinturkar and Company
PartnerRole in project
City Corporation Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Elevate Tower 47- Form 1- 02012026.pdf20 Jan 2026
Withdrawal Update Form 2File: Elevate Tower 47- Form 2- 06012026.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Amanora Elevate Tower 20012026.pdf20 Jan 2026
Occupational CertificateFile: Amanora R-33 - Elevate Tower 47- Final OC.pdf30 Dec 2025
Occupational CertificateFile: Form 4 -R33-Amanora Elevate Tower 47.pdf30 Dec 2025
Withdrawal Update Form 1File: Form1 - Amanora Elevate Tower.pdf18 Oct 2025
Withdrawal Update Form 1File: Form 3 - Amanora Elevate Tower 47.pdf18 Oct 2025
Withdrawal Update Form 1File: Form1 - Amanora Elevate Tower 47.pdf18 Oct 2025
Withdrawal Update Form 2File: Form2 - Elevate Tower.pdf18 Oct 2025
Withdrawal Update Form 2File: Form2 - Elevate Tower.pdf18 Oct 2025
Withdrawal Update Form 2File: Form2 - Elevate Tower.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 - Amanora Elevate Tower 47.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 - Amanora Elevate Tower 47.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 - Amanora Elevate Tower 47.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Elevate Tower 31-03-2025.pdf19 Sep 2025
Form 1File: Form 1- Amanora Elevate Tower 47- 31032025.pdf18 Jul 2025
Form 2File: Form 2- Amanora Elevate Tower 47 31032025.pdf18 Jul 2025
Form 3File: Form 3- Amanora Elevate Tower 47 - 31032025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: ELEVATE TOWER -Inventory Status 30032025.pdf18 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Amanora Elevate Tower.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Amanora Elevate Tower 47 - 31032025.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Elevate Tower 47 31032025.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Elevate Tower 47- 31032025.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Amanora Elevate Tower 47 - 31122024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Elevate Tower 47- 3112024.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Elevate Tower 47- 31122024.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1- Amanora Elevate Tower 47- 31122024.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Elevate Tower 47 30062024.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 3- Amanora Elevate Tower 47 - 30092024.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Elevate Tower 47 30092024.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Elevate Towers Form-5.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Amanora Elevate Tower 47 - 30092024.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Elevate Tower 47 30092024.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: Elevate Tower 47 Inventory Disclosure 30062024.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Amanora Elevate Tower 47 - 30062024.pdf11 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Elevate Tower 47 30062024.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Amanora Elevate Tower 47 - 31032024.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Elevate Tower 47 31032024.pdf4 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Amanora Elevate Tower 47- 31032024.pdf4 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Amanora Elevate Tower 47- 31032024.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Elevate Tower 47 31032024.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Elevate_T47_31122023.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Elevate Tower 47 3112023.pdf10 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Elevate Tower 47 - 31122023.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Elevate Tower 47 (9)- 30092023.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Elevate Tower 47 (9)- 30092023.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Eevate Tower as on 30092023.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Elevate Tower 31-03-2023.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Amanora Elevate Tower 47- 31032023.pdf4 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Elevate T47 30062023.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Elevate Tower 47 30062023.pdf26 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Elevate Tower 47 30062023.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Elevate Tower as on 31-03-2023.pdf14 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Elevate Tower 47 (7).pdf24 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Elevate Tower 47 (7).pdf24 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Elevate Tower 3112022.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Elevate Tower.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Elevate Tower 47 30092022.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Elevate Tower 47 31122022.pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Elevate Tower 47 31122022.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2021-21-04 R33 Form 1 2022-12-31_compressed.pdf12 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Elevate Towers 30092022.pdf19 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Amanora Elevate Tower 30062022.pdf17 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amanora Elevate Tower 47 30062022.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Elevate _March 22.pdf26 May 2022
Declaration about Commencement CertificateFile: Format D DECLARATION ABOUT COMMENCEMNT CERTIFICATE R33 Elevate tower 1.pdf13 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amanora Elevate Tower 47 2 31122021.pdf8 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Amanora Elevate Tower 47 2 31122021.pdf7 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Elevate Tower.pdf7 Jan 2022
Building plan approvalFile: 2 of 3.pdf20 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 2 of 3.pdf20 Nov 2021
Declaration in FORM BFile: Form B.pdf20 Nov 2021
Copy of the legal title reportFile: Legal Title Report Amanora Elevate Tower 47.pdf10 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Amanora Elevate Tower 47 CA certificate.pdf10 Nov 2021
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement Elevate tower.pdf9 Nov 2021
Declaration about Commencement CertificateFile: Format D DECLARATION ABOUT COMMENCEMNT CERTIFICATE R33 Elevate tower.pdf29 Oct 2021
Layout approvalFile: 1 of 3 R33.pdf28 Oct 2021
Building plan approvalFile: 1 of 3 R33.pdf28 Oct 2021
Details of encumbrancesFile: Encumbrance Certificate Elevate Towers R33.pdf28 Oct 2021
Copy of Layout Approval (in case of layout)File: 1 of 3 R33.pdf28 Oct 2021

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Amanora Ascent Towers 48 and 49P52100030032Amanora Park Town, Pune-Jul 2021CompletedSep 2025Oct 2024
Amanora Gold Towers 44, 45 and 46P52100017962Amanora Park Town, Pune-Oct 2018CompletedMay 2024May 2024
Amanora Gold Towers 42 and 43P52100017612Amanora Park Town, Pune-Aug 2018CompletedDec 2023Jun 2023
Amanora Gateway Tower 100P52100000380Amanora Park Town, Pune-Jul 2017CompletedApr 2022Registered original: Apr 2020Apr 2022
Amanora Adreno TowersP52100001822Amanora Park Town, Pune-Jul 2017CompletedMar 2022Jan 2022
Amanora Gateway Towers 98 and 99P52100000321Amanora Park Town, Pune-Jul 2017CompletedDec 2018Dec 2018
Amanora Future Tower, Sector R11Sector R11 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 4110281,117-CompletedMar 2017Feb 2017
Amanora Aspire Towers, Sector R3Plot No 68 Sector R3 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 411028400-CompletedNov 2016Oct 2016

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Amanora Elevate Tower 47 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Amanora Park Town13,700+ in Pune

2 kmAmanora Elevate Tower 47Completed 86Lapsed / revoked 19Other 65Dot size: filed unitsN

Filed coordinates, straight-line distance. 170 registered projects within 2 km.

Builder: City Corporation Limited

City Corporation Limited has 13 registrations on MahaRERA, including Amanora Gateway Towers 98 and 99 and Amanora Gateway Tower 100. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Amanora Elevate Tower 47 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amanora Elevate Tower 47?

The registered promoter entity is City Corporation Limited, a company as per the filing. Its CIN U45202PN2003PLC018435 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amanora Elevate Tower 47?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Amanora Elevate Tower 47?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amanora Elevate Tower 47?

The professionals named in the filing: Architect: GNA Architects; Engineer: Mandar Kulkarni; Chartered Accountant: SPCM & Associates; Chartered Accountant: SPCM and Associates; Chartered Accountant: A S Jinturkar and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amanora Elevate Tower 47?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amanora Elevate Tower 47. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amanora Elevate Tower 47 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.