Home / Browse projects / Pune, Maharashtra / Amanora Arbano Towers 71 and 72

Registered No litigation declared Residential / Group Housing project

Amanora Arbano Towers 71 and 72

By City Corporation Limited

RG-MH-57862 · RERA P52100052614 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 8 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2028Possession promisedno revision filed
12 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 55%
4 of 229Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 148 documents Report an error

Amanora Arbano Towers 71 and 72 is a Residential / Group Housing project by City Corporation Limited in Pune, Maharashtra, registered with MahaRERA as P52100052614 on 11 Sep 2023. Possession is promised by 31 May 2028. 225 of the 229 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.

At a glance

Project

  • NameAmanora Arbano Towers 71 and 72
  • TypeResidential / Group Housing
  • Location
    • Hadapsar Kharadi Byepass Road
    • Amanora Park Town
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052614
  • ReraGenie IDRG-MH-57862

Builder

  • NameCity Corporation Limited
  • Entity typeCompany
  • CINU45202PN2003PLC018435
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorsAniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande
  • Other registrations12 more →
  • Completed9 of 13
  • Declared earlier projects8 →

Key dates

this monthRegisteredSep 2023PromisedMay 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Sep 2023
  • Promised completion31 May 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed148 files

Current status

98%225 of 229 units booked
56.5%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 71NA27241140114
Tower 72NA27241150115

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 55%.

Tower 7173%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises53%
Sanitary Fittings within the flats / premises29%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks52%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.37%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.36%
Tower 7273%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.34%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes10%
Street LightingYes10%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalYes10%
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes10%
Open ParkingNoNot applicable

Parking filed328

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots328
Closed/Covered328
BuildingClosed/CoveredTotal
Tower 71164164
Tower 72164164

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area26,233 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI23950.26
Proposed, not sanctioned23,950 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA Wing, Shangrilla Garden, Bund Garden, Pune
Estimated costRs 154.95 cr
Cost incurredRs 87.62 cr
Work done56.55%
BuildingWingEstimatedIncurred
Tower 71NARs 77.59 crRs 42.23 cr
Tower 72NARs 73.75 crRs 45.30 cr
-NARs 3.60 crRs 9.88 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGNA Architects
EngineerMr. Ankush Mahajan
EngineerMandar Kulkarni
Chartered AccountantSPCM & Associates
Chartered AccountantSPCM and Associates
Chartered AccountantA S Jinturkar and Company
PartnerRole in project
City Corporation Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2028

Documents filed148

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 148 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 2023-35-42 R18-1-B 71-72 Form 1 2026-07-02.pdf15 Jul 2026
Withdrawal Update Form 2File: Form2 - Amanora Arbano Towers 71 and 72 10072026.pdf15 Jul 2026
Withdrawal Update Form 3File: Form 3_Amanora Arbano Tower T71 and T72 30062026.pdf15 Jul 2026
Withdrawal Update Form 1File: Form1- Arbano Towers 71 and 72 02062026.pdf10 Jun 2026
Withdrawal Update Form 2File: Form2- Arbano Towers 71 and 72 04062026.pdf10 Jun 2026
Withdrawal Update Form 3File: Form 3- Amanora Arbano Towers 71 and 72 05062026.pdf10 Jun 2026
Withdrawal Update Form 1File: Form 1 - Amanora Arbano Towers 71 and 72 06052026.pdf14 May 2026
Withdrawal Update Form 2File: Form 2- Arbano Towers 71 and 72 06052026.pdf14 May 2026
Withdrawal Update Form 3File: Form 3_Amanora Arbano Tower T71 T72 as on 30042026.pdf14 May 2026
Withdrawal Update Form 1File: Form 1 - ArbanoTowers 71 and 72 03042026.pdf15 Apr 2026
Withdrawal Update Form 2File: Arbano Towers 71 and 72- Form 2- 31032026.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3_Amanora Arbano Tower T71 and T72 31032026.pdf15 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A - Arbano Towers 71 and 72 2025-26.pdf8 Apr 2026
Withdrawal Update Form 1File: Form 1 - Amanora Arbano Towers 71 and 72 02032026.pdf10 Mar 2026
Withdrawal Update Form 2File: Form 2 - Amanora Arbano Towers 71 and 72 05032026.pdf10 Mar 2026
Withdrawal Update Form 3File: Form 3 - Amanora Arbano Towers 71 and 72 06032026.pdf10 Mar 2026
Withdrawal Update Form 1File: Arbano Towers 71 and 72 - Form 1 - 0402026.pdf7 Feb 2026
Withdrawal Update Form 2File: Arbano Towers 71 and 72- Form 2- 0402026.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3 Amanora Arbano Tower 71 and 72 as on 31012026.pdf7 Feb 2026
Withdrawal Update Form 1File: Arbano Towers 71 and 72- Form 1- 02012026.pdf12 Jan 2026
Withdrawal Update Form 2File: Arbano Towers 71 and 72- Form 2- 06012026.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 Amanora Arbano Tower T71 and T72 as on 31122025.pdf12 Jan 2026
Withdrawal Update Form 1File: Form 1 - Arbano Tower 071 and 072-as on 30112025.pdf5 Dec 2025
Withdrawal Update Form 2File: Form 2 - Arbano Tower 071 and 072-as on 03122025.pdf5 Dec 2025
Withdrawal Update Form 3File: Form 3 Amanora Arbano Tower T71 and T72 as on 30112025.pdf5 Dec 2025
Withdrawal Update Form 1File: Form 1- Amanora Arbano Towers 71 and 72.pdf14 Nov 2025
Withdrawal Update Form 2File: Form 2- Amanora Arbano Towers 71 and 72.pdf14 Nov 2025
Withdrawal Update Form 3File: Form 3 - Amanora Arbano Tower T71 T72 31102025.pdf14 Nov 2025
Withdrawal Update Form 1File: Form1 - Arbano Towers - 71 and 72.pdf15 Oct 2025
Withdrawal Update Form 2File: Form2 - Arbano Towers - 71 and 72.pdf15 Oct 2025
Withdrawal Update Form 3File: Form 3 - Arbano Towers - 71 and 72.pdf15 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Arbano Tower 71 and 72 31-03-2025.pdf19 Sep 2025
Withdrawal Update Form 1File: T71-72-Withdrawal Application Form1 01092025.pdf12 Sep 2025
Withdrawal Update Form 2File: T71-72-Withdrawal Application Form2 31082025.pdf12 Sep 2025
Withdrawal Update Form 3File: Form 3 Amanora Arbano Tower T71 T72 31-08-2025.pdf12 Sep 2025
Form 1File: Form 1- Amanora Arbano Towers 71 and 72- 31032025.pdf19 Jul 2025
Form 2File: Form 2- Amanora Arbano Towers 71 and 72 31032025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Arbano Towers 71 and 72 -Inventory Status 31032025.pdf19 Jul 2025
Form 3File: Form 3_Amanora Arbano Tower T71 T72 31-03-2025.pdf19 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Amanora Arbano Tower- T71 T72.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Arbano Tower T71 T72 31-03-2025.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Arbano Towers 71 and 72 31032025.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Arbano Towers 71 and 72- 31032025.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Arbano Tower T71 T72 31122024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Arbano Towers 71 and 72- 3112024.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Arbano Towers 71 and 72- 31122024.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Arbano Towers 71 and 72 30062024.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 3_Amanora Arbano Tower T71 T72 30092024.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Arbano Towers 71 and 72 30092024.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Arbano 71-72 Form-5.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Arbano Tower T71 T72 30092024.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Arbano Towers 71 and 72 30092024.pdf9 Oct 2024
Layout approvalFile: 2.pdf13 Aug 2024
Building plan approvalFile: 1.pdf13 Aug 2024
Building plan approvalFile: 2 Edited.pdf13 Aug 2024
Building plan approvalFile: 3.pdf13 Aug 2024
Building plan approvalFile: 4.pdf13 Aug 2024
Building plan approvalFile: 5.pdf13 Aug 2024
Building plan approvalFile: 6.pdf13 Aug 2024
Building plan approvalFile: 7.pdf13 Aug 2024
Building plan approvalFile: 8.pdf13 Aug 2024
Building plan approvalFile: 17.pdf13 Aug 2024
Copy of Layout Approval (in case of layout)File: 2.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 Edited.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 17.pdf13 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter - R18.pdf13 Aug 2024
Declaration about Commencement CertificateFile: Final Letterhead Declaration about cc 13082024.pdf13 Aug 2024
Proforma of Agreement for saleFile: Agreement to Lease -Arbano Towers 071-072- 13082024.pdf13 Aug 2024
Proforma of Agreement for saleFile: Deed of Lease- Arbano Towers 71 and 72 - 13082024.pdf13 Aug 2024
Proforma of Allotment letterFile: Allotment letter Amanora Arbano Towers 71 and 72 - 13082024.pdf13 Aug 2024
Deviation Report with respect to Allotment letterFile: Final Deviation report-allotment letter Amanora Arbano Towers 71 and 72 13082024.pdf13 Aug 2024
Deviation Report with respect to model copy of AgreementFile: Final Deviation report with A2L- Amanora Arbano Towers 71 and 72 13082024.pdf13 Aug 2024
Other - TechnicalFile: Technical Declaration 71 and 72 13082024.pdf13 Aug 2024

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Amanora Ascent Towers 48 and 49P52100030032Amanora Park Town, Pune-Jul 2021CompletedSep 2025Oct 2024
Amanora Gold Towers 44, 45 and 46P52100017962Amanora Park Town, Pune-Oct 2018CompletedMay 2024May 2024
Amanora Gold Towers 42 and 43P52100017612Amanora Park Town, Pune-Aug 2018CompletedDec 2023Jun 2023
Amanora Gateway Tower 100P52100000380Amanora Park Town, Pune-Jul 2017CompletedApr 2022Registered original: Apr 2020Apr 2022
Amanora Adreno TowersP52100001822Amanora Park Town, Pune-Jul 2017CompletedMar 2022Jan 2022
Amanora Gateway Towers 98 and 99P52100000321Amanora Park Town, Pune-Jul 2017CompletedDec 2018Dec 2018
Amanora Future Tower, Sector R11Sector R11 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 4110281,117-CompletedMar 2017Feb 2017
Amanora Aspire Towers, Sector R3Plot No 68 Sector R3 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 411028400-CompletedNov 2016Oct 2016

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Amanora Arbano Towers 71 and 72 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Amanora Park Town13,700+ in Pune

2 kmAmanora Arbano Towers 71Completed 87Lapsed / revoked 17Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 184 registered projects within 2 km.

Builder: City Corporation Limited

City Corporation Limited has 13 registrations on MahaRERA, including Amanora Gateway Towers 98 and 99 and Amanora Gateway Tower 100. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Amanora Arbano Towers 71 and 72 is delayed beyond 31 May 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amanora Arbano Towers 71 and 72?

The registered promoter entity is City Corporation Limited, a company as per the filing. Its CIN U45202PN2003PLC018435 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amanora Arbano Towers 71 and 72?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Amanora Arbano Towers 71 and 72?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amanora Arbano Towers 71 and 72?

The professionals named in the filing: Architect: GNA Architects; Engineer: Mr. Ankush Mahajan; Engineer: Mandar Kulkarni; Chartered Accountant: SPCM & Associates; Chartered Accountant: SPCM and Associates; Chartered Accountant: A S Jinturkar and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amanora Arbano Towers 71 and 72?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amanora Arbano Towers 71 and 72. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amanora Arbano Towers 71 and 72 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.