Completed No litigation declared Residential / Group Housing project

24K Stargaze

By KOLTE-PATIL DEVELOPERS LIMITED

RG-MH-62533 · RERA P52100018473 · Last updated on MahaRERA portal: 29 Sep 2023

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 12 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
29 of 66Construction stages doneacross 6 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

24K Stargaze is a Residential / Group Housing project by KOLTE-PATIL DEVELOPERS LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100018473 on 5 Nov 2018. The registration is recorded completed; possession was promised by 30 Mar 2023.

At a glance

Project

  • Name24K Stargaze
  • TypeResidential / Group Housing
  • Location
    • Bavdhan
    • Bavadhan BK
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • RERA no.P52100018473
  • ReraGenie IDRG-MH-62533

Builder

  • NameKOLTE-PATIL DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200PN1991PLC129428
  • GSTIN27AAACK7310G1ZT
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Joint Managing DirectorYashvardhan Rajesh Patil
  • Executive DirectorMilind Digambar Kolte
  • Other registrations63 more →
  • Completed14 of 64
  • No longer live10 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredNov 2018PromisedMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Nov 2018
  • Promised completion30 Mar 2023
  • Revised completionNone
  • Buildings6 building records
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
H Floor 1 to 11NA150000
H Floor 12 to 14NA30000
I Floor 1 to 11NA140000
I Floor 12 to 14NA30000
K Floor 1 to 11NA140000
K Floor 12 to 14NA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 29 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

H Floor 1 to 1190%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
H Floor 12 to 1453%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
I Floor 1 to 1190%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
I Floor 12 to 1453%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
K Floor 1 to 1190%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
K Floor 12 to 1453%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 29 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes65%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes50%
Street LightingYes60%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes65%
Solid Waste Management And DisposalYes85%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed390

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots390
Closed/Covered303
Open Space87
BuildingClosed/CoveredOpen SpaceTotal
H Floor 1 to 111280128
H Floor 12 to 1412012
I Floor 1 to 116337100
I Floor 12 to 1412012
K Floor 1 to 117650126
K Floor 12 to 1412012

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,767 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Amar BuildersPune (M Corp.)Pune
VIjay JasujaPune (M Corp.)Pune

Approvals and building plan

Permissible FSI21127.57
Proposed, not sanctioned21,128 sq m
Buildings approved6
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR G O SQUARE SURVEY NO 249P 240P 251P HINJEWADI ROAD WAKAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM B Chaudhari
EngineerJW Consultant LLP
Chartered AccountantVIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS
PartnerRole in project
KOLTE-PATIL DEVELOPERS LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100015217Mar 2023 → Jun 2023

Reason as filed by the promoterThe project is completed and applied for completion certificate and completion certificate is awaited from competent authority

Litigation declared2

CaseCourtStatus
RCS 653/2014/2014CJJDFiling of written statement
RCS 1508/2008/2008CJJDAwaiting for Summons

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Jul 2023

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 24k Stargaze.pdf29 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 24K Stargaze OC HIK.pdf18 Jul 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Stargaze.pdf18 Jul 2023
Proforma of Allotment letterFile: AFS 24K Stargaze.pdf23 Jun 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Stargaze Phase 2 Society Registration Cert.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Stargaze HIK.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Stargaze HIK.pdf20 Apr 2023
Certificates of CA (Form 3)File: Stargaze Hik - Signed.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: 24K Stargaze.pdf19 Apr 2023
CERSAI detailsFile: Cersai Details KPDL.pdf17 Apr 2023
Disclosure of sold/ booked inventoryFile: 24K Stargaze.pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Stargaze HIK Bld.pdf18 Jan 2023
Certificates of CA (Form 3)File: CA - stargaze.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 24K Stargaze HIK Building.pdf16 Jan 2023
CERSAI detailsFile: Final File Cersai.pdf16 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Stargaze H I K architect certi revised.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Stargaze H I K architect certi revised.pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: KPDL 24K Stargaze HIK.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Stargaze H I K bldg Q2 arch cert.pdf19 Oct 2022
CERSAI detailsFile: Cersai Report.pdf18 Oct 2022
Certificates of CA (Form 3)File: Stargaze form 3 sep 22.pdf12 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 11036 Stargaze HIK Form 5.pdf30 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf2 Sep 2022
Proforma of Allotment letterFile: 24K Stargaze Project B Phase I AFS_compressed.pdf2 Sep 2022
Proforma of Allotment letterFile: AFS 24K Stargaze H I K_compressed.pdf29 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Stargaze.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Inventory Declaration 24K Stargaze.pdf7 Jul 2022
Certificates of CA (Form 3)File: 24K Stargaze CA Certificate_compressed.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 24K Stargaze.pdf5 Jul 2022
Certificates of CA (Form 3)File: 24K Stargaze CA Certificate_compressed.pdf5 Jul 2022
CERSAI detailsFile: Final Cersai.pdf4 Jul 2022
Details of encumbrancesFile: 24K Stargaze.pdf4 May 2022
Disclosure of sold/ booked inventoryFile: Inventory Declaration 24K Stargaze HIK.pdf12 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Stargaze.pdf7 Apr 2022
Certificates of CA (Form 3)File: CA_Stargaze.pdf7 Apr 2022
CERSAI detailsFile: KPDL Cersai-compressed.pdf6 Apr 2022
Disclosure of sold/ booked inventoryFile: 24K Stargaze H K I_12 to 14.pdf24 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Stargaze Plantinum Series K H I.pdf20 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate_H,I,K bldg, Stargaze Ph II.pdf18 Jan 2022
Disclosure of sold/ booked inventoryFile: signed inventory declaration 24 stargaze H , I , K building.pdf13 Jan 2022
CERSAI detailsFile: KPDL Merge File-compressed.pdf7 Jan 2022
Certificates of CA (Form 3)File: 24K Stargaze.pdf7 Jan 2022
Details of encumbrancesFile: 24K Stargaze.pdf6 Jan 2022
Details of encumbrancesFile: 24K Stargaze.pdf5 Jan 2022
Proforma of Allotment letterFile: FINAL-Draft AFS-24K Stargaze Project B (Phase I)-30-12-2021.pdf30 Dec 2021
Details of encumbrancesFile: Stargaze.pdf28 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA Certificate 24K Stargaze.pdf29 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised commencement cert jul 21.pdf23 Jul 2021
Proforma of Allotment letterFile: FINAL-Draft AFS-24K Stargaze Project B (Phase I)-22-07-2021.pdf22 Jul 2021
Details of encumbrancesFile: Update encumbrance _Stargaze.pdf6 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Certificate Stargaze Platinum Series.pdf30 Sep 2020
Proforma of Allotment letterFile: FINAL -AFS-24K Stargaze Project B (Phase I)- 17-12-2019.pdf7 Jan 2020
Annual Audit Report of Statutory CA (Form 5)File: Signed Certificate Stargaze Platinum March 19.pdf30 Sep 2019
Details of encumbrancesFile: Encumbrances Stargaze Platinum Series.pdf13 Dec 2018
Proforma of Allotment letterFile: AFS Stargaze Platinum Series.pdf13 Dec 2018
Proforma of Allotment letterFile: AFS New Stargaze Platinum Series Project B Nov 2018.pdf19 Nov 2018
Details of encumbrancesFile: Self Declaration Encumbrances.pdf22 Oct 2018
Declaration in FORM BFile: Affidavit cum Declaration.pdf22 Oct 2018
Proforma of Allotment letterFile: AFS Stargaze.pdf22 Oct 2018
OtherFile: REVISED-Allotment Letter and Application form.pdf22 Oct 2018
Copy of the legal title reportFile: Search and Title Certificate- UDK Associates-16-10-2018.pdf17 Oct 2018
Building plan approvalFile: Layout Stargaze.pdf15 Oct 2018
Layout approvalFile: Layout Stargaze.pdf15 Oct 2018
Copy of Layout Approval (in case of layout)File: Layout Stargaze.pdf15 Oct 2018
Building Plan Approval (IOD)File: Layout Stargaze.pdf15 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: commencement cert stargaze.pdf15 Oct 2018
Certificates of CA (Form 3)File: SIGNED FORM 3 STARGAZE PLATINUM.pdf15 Oct 2018

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
EVARAP51800026949Borivali, Mumbai Suburban-Nov 2020CompletedOct 2024Oct 2024
24K Stargaze - J BuildingP52100027791Bavdhan, Pune-Jan 2021CompletedJun 2024Jun 2024
Western AvenueP52100000917Wakad, Pune-Jul 2017CompletedDec 2023Registered original: Dec 2022Jan 2023
Redevelopment of Jai Vijay CHSL - Phase IP51800004446Vile-Parle (East), Mumbai Suburban-Aug 2017CompletedSep 2022Registered original: Sep 2019Sep 2022
24K ATRIAP52100000428Vishal Nagar, Pimple Nilakh, Pune-Jul 2017CompletedDec 2021Dec 2021
STARGAZEP52100009722Bavadhan BK, Pune-Aug 2017CompletedDec 2018Dec 2018
Ivy Estate Umang PremierP52100000655WAGHOLI, Pune-Jul 2017CompletedSep 2018Sep 2018
GLITTERATIP52100006257Pimpri Chinchawad (M Corp.), Pune-Aug 2017CompletedJun 2018Jun 2018
GLITTERATI IIP52100000319Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedApr 2018Registered original: Dec 2017Apr 2018
Redevelopment of Link Palace Premises Co-Op Soc. Ltd. Phase IP51800008272Andheri, Mumbai Suburban-Aug 2017CompletedMar 2018Registered original: Dec 2017Mar 2018
GlitteratiPimple Nilakh Pune - 411014187-CompletedApr 2016Apr 2016
City BayDhole-Patil road Pune-41100127-CompletedApr 2014Apr 2014

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 24K Stargaze on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bavdhan13,700+ in Pune

Builder: KOLTE-PATIL DEVELOPERS LIMITED

KOLTE-PATIL DEVELOPERS LIMITED has 64 registrations on MahaRERA, including 24K OPULA and 24K ATRIA. Its filings disclose 14 earlier MahaRERA projects: declares 13 of 14 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 24K Stargaze is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 24K Stargaze?

The registered promoter entity is KOLTE-PATIL DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200PN1991PLC129428 and GSTIN 27AAACK7310G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 24K Stargaze?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 24K Stargaze?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 24K Stargaze?

The professionals named in the filing: Architect: M B Chaudhari; Engineer: JW Consultant LLP; Chartered Accountant: VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 24K Stargaze?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 24K Stargaze. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 24K Stargaze to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.