CIELO BY VTP LUXE

By DELAS REALCON LLP

RG-MH-05685 · RERA P52100056310 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 1 complaint at MahaRERA
  • Rs 80.00 crore secured on the land, in favour of ADITYA BIRLA HOUSING FINANCE LIMITED

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2028Possession promisedno revision filed
3 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 80%
254 of 530Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 208 documents Report an error

CIELO BY VTP LUXE is a Others project by DELAS REALCON LLP in Bavdhan Khurd, 411021, registered with MahaRERA as P52100056310 on 25 May 2024. Possession is promised by 31 Dec 2028. 276 of the 530 units on this registration are recorded sold or booked, and 3 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameCIELO BY VTP LUXE
  • TypeOthers
  • Location
    • S No 36
    • PVPIT road near Rohan Madhuban
    • Bavdhan Khurd
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100056310
  • ReraGenie IDRG-MH-05685

Builder

  • NameDELAS REALCON LLP
  • Entity typePartnership
  • LLPINACB-4089
  • GSTIN27AAVFD2492E1Z4
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • PartnersNILESH VILASKUMAR PALRESHA, SUMIT RAMESH DIWANE, BHUSHAN VILASKUMAR PALRESHA
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 May 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed208 files

Current status

52%276 of 530 units booked
7.8%Work done, per cost certificate

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1 WING ANA252313010140
TOWER 2 WING BNA252316915184
TOWER 3 WING CNA24212060206

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 80%.

TOWER 1 WING A11%
ActivityProgress
Excavation100%
Basement (if any)20%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 2 WING B7%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 3 WING C24%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)60%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed445

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots445
Closed/Covered445
BuildingClosed/CoveredTotal
TOWER 1 WING A130130
TOWER 2 WING B169169
TOWER 3 WING C146146

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area7,159 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA HOUSING FINANCE LIMITED
Secured amountRs 80.00 crore
CERSAI search filedYes
Declared on8 Jul 2025
LandownerVillageDistrict
ABP BUILDCON LLP-Pune
BHANSALI SPACES LLP-Pune
MANAV CITY SPACES LLP-Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation, Building Development Department
Permissible FSI64415.07
Proposed, not sanctioned64,348 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSakore Nagar, Viman Nagar, Pune 411014
Estimated costRs 234.08 cr
Cost incurredRs 18.30 cr
Work done7.82%
BuildingWingEstimatedIncurred
TOWER 3 WING CNARs 72.30 crRs 3.47 cr
TOWER 2 WING BNARs 71.40 crRs 86.68 lakh
TOWER 1 WING ANARs 66.97 crRs 12.14 cr
-NARs 23.41 crRs 1.83 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVoussoirs
EngineerVinayak Boga
EngineerVINODKUMAR MISHRA
Chartered AccountantSAC & Co LLP
Chartered AccountantPriyanka Chordiya & Associates
PartnerRole in project
DELAS REALCON LLP-

Litigation declared2

CaseCourtStatus
RTS Appeal No 1233/2022Additional Collector PuneOngoing
6770/2011HON'BLE HIGH COURT OF BOMBAYOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503482Vishal Vijaykumar KulkarniDELAS REALCON LLP29/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed208

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 208 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: VTP Cielo RERA Form 2A 2026.pdf18 Jun 2026
Withdrawal Update Form 1File: FORM1 cielo.pdf15 Apr 2026
Withdrawal Update Form 2File: form-2 cielo.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3 VTP CIELO.pdf15 Apr 2026
Withdrawal Update Form 1File: FORM-1 VTP CILEO 31122025.pdf19 Jan 2026
Withdrawal Update Form 2File: RERA FORM-2 CIELO (2).pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 VTP CIELO 31122025-sign copy_11zon.pdf19 Jan 2026
Withdrawal Update Form 1File: FORM1 VTP CIELO.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM 2 CIELO.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3 VTP CIELO.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5- VTP CIELO.pdf8 Sep 2025
Building plan approvalFile: HPSCANNER5739_upload_compressed.pdf19 May 2025
Building plan approvalFile: HPSCANNER5740_upload_compressed.pdf19 May 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5739_upload_compressed.pdf19 May 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5740_upload_compressed.pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Cielo.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - VTP CIELO 31032025.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 CIELO 31032025.pdf15 Apr 2025
Layout approvalFile: For Rera-Model.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5729.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5730.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5731.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5732_rotated_11zon.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5733_rotated_11zon.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5734_rotated_11zon.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5735_rotated.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5736_rotated.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5737.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5738_rotated.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5740_rotated_11zon.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5741_rotated_11zon.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5742_11zon_rotated.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5743_11zon_rotated.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5744_11zon.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5745.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5746.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5747.pdf12 Apr 2025
Building plan approvalFile: HPSCANNER5748.pdf12 Apr 2025
Copy of Layout Approval (in case of layout)File: For Rera-Model.pdf12 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5738_rotated.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5748.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5747.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5746.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5745.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5744_11zon.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5743_11zon_rotated.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5742_11zon_rotated.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5741_rotated_11zon.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5740_rotated_11zon.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5737.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5736_rotated.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5735_rotated.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5734_rotated_11zon.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5733_rotated_11zon.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5732_rotated_11zon.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5731.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5730.pdf12 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER5729.pdf12 Apr 2025
Declaration about Commencement CertificateFile: Format D Cielo.pdf12 Apr 2025
Declaration about Commencement CertificateFile: SKM_C226i25040811320_0001.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: CIELO 31032025.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CIELO 31122024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VTP CIELO 31122024.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VTP CIELO 31122024.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: CIELO 31122024.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTP CIELO 26112024.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTP CIELO 30062024.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VTP CIELO 26112024.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VTP CIELO 26112024.pdf5 Dec 2024
Disclosure of sold/ booked inventoryFile: INVENTORY CIELO 26112024.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTP CIELO 26112024_compressed.pdf4 Dec 2024
Layout approvalFile: Sanction Layout_03042024_11zon.pdf7 Nov 2024
Layout approvalFile: Bavdhan Layout_29102024_11zon.pdf7 Nov 2024
Copy of Layout Approval (in case of layout)File: Bavdhan Layout_29102024_11zon.pdf7 Nov 2024
Copy of Layout Approval (in case of layout)File: Sanction Layout_03042024_11zon.pdf7 Nov 2024
Building plan approvalFile: Bavdhan Layout_29102024_11zon.pdf30 Oct 2024
Building plan approvalFile: 2-21_11zon.pdf30 Oct 2024
Building plan approvalFile: 3-21_11zon_11zon.pdf30 Oct 2024
Building plan approvalFile: 4-21_11zon (1).pdf30 Oct 2024

Keep CIELO BY VTP LUXE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bavdhan Khurd

2 kmCIELO BY VTP LUXECompleted 23Lapsed / revoked 14Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 81 registered projects within 2 km.

Builder: DELAS REALCON LLP

DELAS REALCON LLP has 2 registrations on MahaRERA, including CIELO BY VTP LUXE and VTP CIELO MHADA. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if CIELO BY VTP LUXE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CIELO BY VTP LUXE?

The registered promoter entity is DELAS REALCON LLP, a partnership as per the filing. Its LLPIN ACB-4089 and GSTIN 27AAVFD2492E1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CIELO BY VTP LUXE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CIELO BY VTP LUXE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for CIELO BY VTP LUXE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CIELO BY VTP LUXE?

The professionals named in the filing: Architect: Voussoirs; Engineer: Vinayak Boga; Engineer: VINODKUMAR MISHRA; Chartered Accountant: SAC & Co LLP; Chartered Accountant: Priyanka Chordiya & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CIELO BY VTP LUXE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CIELO BY VTP LUXE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CIELO BY VTP LUXE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.