EVARA
By KOLTE-PATIL DEVELOPERS LIMITED
RG-MH-28652 · RERA P51800026949 · Last updated on MahaRERA portal: 10 Oct 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 12 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 63 other registrations.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EVARA is a Others project by KOLTE-PATIL DEVELOPERS LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800026949 on 7 Nov 2020. The registration is recorded completed; possession was promised by 30 Oct 2024.
At a glance
Project
- NameEVARA
- TypeOthers
- Location
- Borivali
- Mumbai Suburban
- 400092
- Pincode400092
- RERA no.P51800026949
- ReraGenie IDRG-MH-28652
Builder
- NameKOLTE-PATIL DEVELOPERS LIMITED
- Entity typeCompany
- CINL45200PN1991PLC129428
- GSTIN27AAACK7310G1ZT
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Joint Managing DirectorYashvardhan Rajesh Patil
- Executive DirectorMilind Digambar Kolte
- Other registrations63 more →
- Completed14 of 64
- No longer live10 lapsed, de-registered or revoked
- Declared earlier projects14 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on7 Nov 2020
- Promised completion30 Oct 2024
- Revised completionNone
- Buildings4 building records
- Documents filed76 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing - Ground to 2nd Floor | NA | 10 | 0 | 0 | 0 | 0 |
| A wing - 3rd to 16th Floor | NA | 14 | 0 | 0 | 0 | 0 |
| B Wing - Ground to 2nd Floor | NA | 10 | 0 | 0 | 0 | 0 |
| B Wing - 3rd to 16th Floor | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 10 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
31 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 0%.
A Wing - Ground to 2nd Floor82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A wing - 3rd to 16th Floor64%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B Wing - Ground to 2nd Floor82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B Wing - 3rd to 16th Floor55%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 10 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Fitness Centre | Yes | 100% |
Parking filed152
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A Wing - Ground to 2nd Floor | 18 | 18 |
| A wing - 3rd to 16th Floor | 58 | 58 |
| B Wing - Ground to 2nd Floor | 19 | 19 |
| B Wing - 3rd to 16th Floor | 57 | 57 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BNM Associates & Architects |
| Engineer | Umang Shah |
| Chartered Accountant | VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS |
| Chartered Accountant | CA Nikita A Bajaj |
| Partner | Role in project |
|---|---|
| KOLTE-PATIL DEVELOPERS LIMITED | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| Arbitration 2016/2016 | Arbitration before the Sole Arbitrator Mr Gautam Mehta | cross examination of Claimant witnesses pending |
| 0200983 of 2020/2020 | City Civil Court Dindoshi | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Oct 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 10 Oct 2024
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Evara.pdf | 10 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC DTD 07-06-2024_OSG.pdf | 10 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Evara.pdf | 10 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC DTD 07-06-2024_OSG.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: EVARA.pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: EVARA.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 OSG-Evara.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 OSG-Evara.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Evara.pdf | 11 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: osg Evara.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Evara-OSG.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Evara.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: evara.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Om Shree gokul.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Evara.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Evara.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Evara.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Evara.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Evara.pdf | 29 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Om Shree Gokul - Evara.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Om Shree Gokul - Evara.pdf | 20 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Evara.pdf | 18 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate- March-23_ Om Shree Gokul.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: EVARA RERA.pdf | 20 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EVARA_20230415130432 Signed Form 3 (2).pdf | 20 Apr 2023 |
| CERSAI detailsFile: Cersai Details KPDL.pdf | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Evara.pdf | 15 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Evara.pdf | 19 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Evara.pdf | 19 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - EVARA.pdf | 16 Jan 2023 |
| CERSAI detailsFile: Final File Cersai.pdf | 16 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: EVARA RERA.pdf | 11 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Evara.pdf | 2 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Evara RERA 20221018115711.pdf | 19 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Om Shree Gokul 30 09 2022 Signed.pdf | 19 Oct 2022 |
| CERSAI detailsFile: Cersai Report.pdf | 18 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate Evvara.pdf | 15 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Certificate_EVARA.pdf | 30 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Evara- OM shree Gokul_20220712134706.pdf | 18 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch - Evara.pdf | 7 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Evara.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - Evara.pdf | 7 Jul 2022 |
| CERSAI detailsFile: Final Cersai.pdf | 4 Jul 2022 |
| Details of encumbrancesFile: Encumbrance Update- Evara-OSG.pdf | 5 May 2022 |
| Disclosure of sold/ booked inventoryFile: Evara- Inventory.pdf | 20 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Evara_compressed.pdf | 8 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Evara.pdf | 7 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Evara.pdf | 6 Apr 2022 |
| CERSAI detailsFile: KPDL Cersai-compressed.pdf | 6 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: informtion evara_20220127154554.pdf | 27 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: informtion evara_20220127154554.pdf | 27 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: informtion evara_20220127154554.pdf | 27 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Evara-Engg-Dec21.pdf | 20 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Evara_Rera_oct_dec21.pdf | 18 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EVARA.pdf | 7 Jan 2022 |
| CERSAI detailsFile: KPDL Merge File-compressed.pdf | 6 Jan 2022 |
| Details of encumbrancesFile: Evara.pdf | 5 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 11061 RERA Certificate-EVARA.pdf | 29 Sep 2021 |
| Proforma of Allotment letterFile: Draft AFS Evara residential 12-08-2021 clean copy.pdf | 13 Aug 2021 |
| Building plan approvalFile: Amended_Approval_pg1_compressed1.pdf | 5 Jul 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended_Approval_pg1_compressed1.pdf | 5 Jul 2021 |
| OtherFile: Amended approval letter.pdf | 5 Jul 2021 |
| OtherFile: DA 1 page 1 to 25.pdf | 3 Nov 2020 |
| OtherFile: Commence Certificate.pdf | 3 Nov 2020 |
| Proforma of Allotment letterFile: AFS Evara.pdf | 12 Oct 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Commence Certificate.pdf | 8 Oct 2020 |
| Layout approvalFile: Sanction plan.pdf | 7 Oct 2020 |
| Building plan approvalFile: Sanction plan.pdf | 7 Oct 2020 |
| Copy of the legal title reportFile: Final Title Certificate.pdf | 7 Oct 2020 |
| Details of encumbrancesFile: Self Declaration-Encumbrance.pdf | 7 Oct 2020 |
| Copy of Layout Approval (in case of layout)File: Sanction plan.pdf | 7 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction plan.pdf | 7 Oct 2020 |
| Declaration in FORM BFile: Affidavit cum Declaration-Form B Signed and Notarised copy without resolution.pdf | 7 Oct 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 7 Oct 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf | 7 Oct 2020 |
| OtherFile: DA 2 page 26 to 53.pdf | 7 Oct 2020 |
Promoter's earlier projects12
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| 24K Stargaze - J BuildingP52100027791 | Bavdhan, Pune | - | Jan 2021 | Completed | Jun 2024 | Jun 2024 |
| Western AvenueP52100000917 | Wakad, Pune | - | Jul 2017 | Completed | Dec 2023Registered original: Dec 2022 | Jan 2023 |
| 24K StargazeP52100018473 | Bavdhan, Pune | - | Nov 2018 | Completed | Mar 2023 | Mar 2023 |
| Redevelopment of Jai Vijay CHSL - Phase IP51800004446 | Vile-Parle (East), Mumbai Suburban | - | Aug 2017 | Completed | Sep 2022Registered original: Sep 2019 | Sep 2022 |
| 24K ATRIAP52100000428 | Vishal Nagar, Pimple Nilakh, Pune | - | Jul 2017 | Completed | Dec 2021 | Dec 2021 |
| STARGAZEP52100009722 | Bavadhan BK, Pune | - | Aug 2017 | Completed | Dec 2018 | Dec 2018 |
| Ivy Estate Umang PremierP52100000655 | WAGHOLI, Pune | - | Jul 2017 | Completed | Sep 2018 | Sep 2018 |
| GLITTERATIP52100006257 | Pimpri Chinchawad (M Corp.), Pune | - | Aug 2017 | Completed | Jun 2018 | Jun 2018 |
| GLITTERATI IIP52100000319 | Pimpri Chinchawad (M Corp.), Pune | - | Jul 2017 | Completed | Apr 2018Registered original: Dec 2017 | Apr 2018 |
| Redevelopment of Link Palace Premises Co-Op Soc. Ltd. Phase IP51800008272 | Andheri, Mumbai Suburban | - | Aug 2017 | Completed | Mar 2018Registered original: Dec 2017 | Mar 2018 |
| Glitterati | Pimple Nilakh Pune - 411014 | 187 | - | Completed | Apr 2016 | Apr 2016 |
| City Bay | Dhole-Patil road Pune-411001 | 27 | - | Completed | Apr 2014 | Apr 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 63 other registrations, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
Keep EVARA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borivali6,700+ in Mumbai Suburban
Hiranandani Bluecrest
SHODEN DEVELOPERS PRIVATE LIMITED
KANAKIA PRIVAASA TOWER 1 & 2
KANAKIA TRANSPARENT DEVELOPERS PRIVATE LIM
BHOOMI AIRAVAT
Bhoomi Shashwat Estate Private limited
Shraddha Paradise
Shraddha Prime Projects Limited
UNIQUE REGALIA
UNIQUE SHANTI DEVELOPERS LLP
NICCO VANASHRI AND NICCO HEIGHTS
NEW INDIA CONSTRUCTION COMPANY
See every Mumbai Suburban project, with the district possession charts
Builder: KOLTE-PATIL DEVELOPERS LIMITED
KOLTE-PATIL DEVELOPERS LIMITED has 64 registrations on MahaRERA, including 24K OPULA and 24K ATRIA. Its filings disclose 14 earlier MahaRERA projects: declares 13 of 14 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if EVARA is delayed beyond 30 Oct 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EVARA?
The registered promoter entity is KOLTE-PATIL DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200PN1991PLC129428 and GSTIN 27AAACK7310G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EVARA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for EVARA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EVARA?
The professionals named in the filing: Architect: BNM Associates & Architects; Engineer: Umang Shah; Chartered Accountant: VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS; Chartered Accountant: CA Nikita A Bajaj. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EVARA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback