ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / cloud 51

Registered No litigation declared Others project

cloud 51

By OREE REALITY PVT LTD

RG-MH-47139 · RERA P52100050833 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
14 of 55Construction stages doneacross 5 buildings; furthest along: Slabs of Super Structure, 80%
386 of 606Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 167 documents Report an error

cloud 51 is a Others project by OREE REALITY PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100050833 on 9 May 2023. Possession is promised by 31 Dec 2028. 220 of the 606 units on this registration are recorded sold or booked, and 14 of 55 construction stages are filed complete.

At a glance

Project

  • Namecloud 51
  • TypeOthers
  • Location
    • MUMBAI BANGALORE EXPRESSWAY
    • NEAR CNG PUMP OF LMD
    • Bavdhan Khurd
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050833
  • ReraGenie IDRG-MH-47139

Builder

  • NameOREE REALITY PVT LTD
  • Entity typeCompany
  • DirectorPOOJA SARANG AWAD
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 May 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed167 files

Current status

36%220 of 606 units booked
69.5%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DD262494094
EWSEWS Building7648048
AA30289621117
BB312819238230
CC30289621117

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

D · wing D24%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)40%
Plinth100%
Stilt Floor0%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS · wing EWS Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A · wing A53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B · wing B53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C · wing C53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1359

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,359
Closed/Covered1,359
BuildingClosed/CoveredTotal
D D212212
EWS EWS Building7272
A A355355
B B400400
C C320320

Land and ownership17

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area13,400 sq m
Land owned byNot the promoter
Named landowners17
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025
LandownerVillageDistrict
BABAN LAXMAN DAGADEBavadhan BKPune
ANIL KISAN DAGADEBavadhan BKPune
SANJAY KISAN DAGADEBavadhan BKPune
PRABHAKAR KISAN DAGADEBavadhan BKPune
VIJAY VISHWANATH DAGADEBavadhan BKPune
SHAKUNTALA VISHWANATH DAGADEBavadhan BKPune
LAHANUBAI KISAN DAGADEBavadhan BKPune
ALKA SHIVAJI JADHAVBavadhan BKPune
KALPANA DILIP BANDALBavadhan BKPune
BABY BALASAHEB BORADEBavadhan BKPune
LILABAI UTTAM DHANKAWADEBavadhan BKPune
JIJABAI ASHOK SHEDGEBavadhan BKPune
KANTA SURYAKANT BORHADEBavadhan BKPune
PRABHAKAR BHAGAVANT BAVALEBavadhan BKPune
SADHANA SURESH POKALEBavadhan BKPune
RANJANA RAMKRUSHNA MOREBavadhan BKPune
SUDAM LAXMAN DAGDEBavdhan Kh.Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI61232.13
Proposed, not sanctioned61,232 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 33 34 AMACHI COLONY NDA PASHAN ROAD BAVDHAN PUNE 411021
Estimated costRs 228.70 cr
Cost incurredRs 159.00 cr
Work done69.52%
BuildingWingEstimatedIncurred
BBRs 66.00 crRs 62.00 cr
DDRs 45.00 crRs 10.00 cr
AARs 45.00 crRs 42.00 cr
CCRs 45.00 crRs 40.00 cr
-NARs 25.70 crRs 5.00 cr
EWSEWS BuildingRs 2.00 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrasad Ramesh Ingawale
EngineerEknath Ramchandra Yenpure
Chartered AccountantAGRAWAL OSWAL AND ASSOCIATES
Chartered AccountantG.K.Chandavarkar & Co
PartnerRole in project
OREE REALITY PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed167

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 167 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf16 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A-.pdf1 Jun 2026
Form 2A (FY 2025-2026)File: Engineer Certificate From 2 A 2026.pdf1 Jun 2026
Form 5 (FY 2024-2025)File: FORM 5-24-25 CLOUD 51-REVISED.pdf1 Jun 2026
Form 5 (FY 2025-2026)File: Form 5 Cloud 51-Signed.pdf1 Jun 2026
Withdrawal Update Form 1File: PI Architect From 1.pdf21 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate 19-04-2026.pdf21 Apr 2026
Withdrawal Update Form 3File: Final Form 3-signed and stamp.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate 19-04-2026.pdf20 Apr 2026
Withdrawal Update Form 3File: Final Form 3-signed and stamp.pdf20 Apr 2026
Layout approvalFile: 1-21..pdf15 Apr 2026
Building plan approvalFile: 2-21..pdf15 Apr 2026
Building plan approvalFile: 3-21..pdf15 Apr 2026
Building plan approvalFile: 4-21..pdf15 Apr 2026
Building plan approvalFile: 5-21..pdf15 Apr 2026
Building plan approvalFile: 6-21..pdf15 Apr 2026
Building plan approvalFile: 7-21..pdf15 Apr 2026
Building plan approvalFile: 8-21..pdf15 Apr 2026
Building plan approvalFile: 9-21..pdf15 Apr 2026
Building plan approvalFile: 10-21..pdf15 Apr 2026
Building plan approvalFile: 11-21..pdf15 Apr 2026
Building plan approvalFile: 12-21..pdf15 Apr 2026
Building plan approvalFile: 13-21..pdf15 Apr 2026
Building plan approvalFile: 14-21..pdf15 Apr 2026
Building plan approvalFile: 15-21..pdf15 Apr 2026
Building plan approvalFile: 16-21..pdf15 Apr 2026
Building plan approvalFile: 17-21..pdf15 Apr 2026
Building plan approvalFile: 18-21..pdf15 Apr 2026
Building plan approvalFile: 19-21..pdf15 Apr 2026
Building plan approvalFile: 20-21..pdf15 Apr 2026
Building plan approvalFile: 21-21..pdf15 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2_compressed.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Jan 2026
Withdrawal Update Form 1File: Architect Certificate Cloud 51.pdf30 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate Cloud 51.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 3 For Q2-Cloud 51.pdf30 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA Architect's Cloud 51.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3-CLOUD51.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Cloud 51 20 4 25.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure OF Sold Unsold.pdf3 Mar 2025
Declaration about Commencement CertificateFile: Format D 3 3 25.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 UPDATED Q2.pdf2 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 UPDATED Q3.pdf2 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q2-UPDATED.pdf1 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 -UPDATEDQ3.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 31 December 2023.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 31 December 2024.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 30 September 2024.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 30 June 2024.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 31 March 2024.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 30 September 2023.pdf1 Mar 2025
Declaration about Commencement CertificateFile: Format D.pdf1 Mar 2025
Layout approvalFile: REVISED IOD 1 4 (2).pdf28 Feb 2025
Copy of Layout Approval (in case of layout)File: REVISED IOD 1 4 (2).pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 -Dated 11th jan 2025.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory.pdf28 Feb 2025
Declaration about Commencement CertificateFile: From D.pdf28 Feb 2025
Declaration about Commencement CertificateFile: FORMAT D.pdf28 Feb 2025
Layout approvalFile: Amalgamition Layout plan 1.pdf27 Feb 2025
Copy of Layout Approval (in case of layout)File: Amalgamition Layout plan 1.pdf27 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Amalgamition CC.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA Architect's.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Cloud 51.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From -2.pdf20 Jan 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Separate Bank Account.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Bavdhan.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Cloud 51_11zon.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D From-3 (2).pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (1).pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1)_11zon.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA Architect's Certificate.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA Architect's application (4).pdf20 Apr 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsStatusPromisedDelivered
CLOUD 51Survey no 51 10 Tanaji Dagade Patil Nagar Near LMD CNG Pump Mumbai Bangalore Expressway Bavdhan Khurd Pune 411021218OngoingJun 2027Not due yet

How this compares with Pune

36%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep cloud 51 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR CNG PUMP OF LMD13,700+ in Pune

2 kmcloud 51Completed 9Lapsed / revoked 11Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 33 registered projects within 2 km.

Builder: OREE REALITY PVT LTD

OREE REALITY PVT LTD has 2 registrations on MahaRERA, including cloud 51 and Cloud 28. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if cloud 51 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of cloud 51?

The registered promoter entity is OREE REALITY PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in cloud 51?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for cloud 51?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at cloud 51?

The professionals named in the filing: Architect: Prasad Ramesh Ingawale; Engineer: Eknath Ramchandra Yenpure; Chartered Accountant: AGRAWAL OSWAL AND ASSOCIATES; Chartered Accountant: G.K.Chandavarkar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in cloud 51?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About cloud 51. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save cloud 51 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.