New projects and RERA data in Dadra & Nagar Haveli district, Maharashtra

218 projects are registered in Dadra & Nagar Haveli district: 13,017 units across them, 28 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

218Projects covered
28Registered, last 12 months
13,017Units declared
8,779Units not yet booked
22Completion dates revised
0With declared litigation

Of the 218 covered registrations, 22 have revised their promised completion date and 0 declare litigation. The median project here is 30% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Also free on ReraGenie: a monthly RERA report for the seven biggest markets in Maharashtra (Pune, Mumbai, Thane, Navi Mumbai, Nagpur, Nashik and Vasai-Virar): what registered that month, the possession pipeline and the busiest pincodes, from the filings. See the latest editions.

When Dadra & Nagar Haveli projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 218 projects with a promised date, 61 are recorded delivered, 95 are still on the register and 62 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

012253750today2018: 9 projects, delivered2018: 2 projects, registration lapsed or cancelled’182019: 12 projects, delivered2019: 4 projects, registration lapsed or cancelled’192020: 6 projects, delivered2020: 6 projects, registration lapsed or cancelled’202021: 4 projects, delivered2021: 3 projects, registration lapsed or cancelled’212022: 4 projects, delivered2022: 9 projects, registration lapsed or cancelled’222023: 3 projects, delivered2023: 12 projects, registration lapsed or cancelled’232024: 5 projects, delivered2024: 13 projects, registration lapsed or cancelled’242025: 5 projects, delivered2025: 8 projects, registration lapsed or cancelled’252026: 10 projects, delivered2026: 15 projects, on the register2026: 5 projects, registration lapsed or cancelled’262027: 3 projects, delivered2027: 16 projects, on the register’272028: 15 projects, on the register’282029: 11 projects, on the register’292030: 18 projects, on the register’302031: 6 projects, on the register’312032: 9 projects, on the register’322033: 2 projects, on the register’332034: 1 projects, on the register’342035: 2 projects, on the register’35

113 projects promise possession in 2026 or later. Facts as per filings on RERA website.

06251,2501,8752,500today’18’192020: 213 flats, registration lapsed or cancelled (only 3 of 12 projects filed a flat count)’202021: 103 flats, delivered (only 2 of 7 projects filed a flat count)2021: 2 flats, registration lapsed or cancelled (only 2 of 7 projects filed a flat count)’212022: 72 flats, delivered (only 4 of 13 projects filed a flat count)2022: 277 flats, registration lapsed or cancelled (only 4 of 13 projects filed a flat count)’222023: 159 flats, registration lapsed or cancelled (only 1 of 15 projects filed a flat count)’232024: 25 flats, delivered (only 3 of 18 projects filed a flat count)2024: 159 flats, registration lapsed or cancelled (only 3 of 18 projects filed a flat count)’242025: 28 flats, delivered2025: 776 flats, registration lapsed or cancelled’252026: 561 flats, delivered2026: 1,194 flats, on the register2026: 358 flats, registration lapsed or cancelled’262027: 135 flats, delivered2027: 1,722 flats, on the register’272028: 491 flats, on the register’282029: 853 flats, on the register’292030: 2,466 flats, on the register’302031: 677 flats, on the register’312032: 1,369 flats, on the register’322033: 515 flats, on the register’332034: 561 flats, on the register’342035: 301 flats, on the register’35

11,203 flats are promised in 2026 or later, across the 77% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Dadra & Nagar Haveli possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 22 of 218 projects (10%) have moved at least once; the median move is 18 months and the longest is 75 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

012253750Originally due 2018: 11 projects kept the original date, 92% of the yearOriginally due 2018: 1 projects moved by under 2 years, 8% of the year’18Originally due 2019: 15 projects kept the original date, 60% of the yearOriginally due 2019: 5 projects moved by under 2 years, 20% of the yearOriginally due 2019: 5 projects moved by 2 years or more, 20% of the year’19Originally due 2020: 8 projects kept the original date, 80% of the yearOriginally due 2020: 2 projects moved by under 2 years, 20% of the year’20Originally due 2021: 4 projects kept the original date, 80% of the yearOriginally due 2021: 1 projects moved by 2 years or more, 20% of the year’21Originally due 2022: 10 projects kept the original date, 83% of the yearOriginally due 2022: 1 projects moved by under 2 years, 8% of the yearOriginally due 2022: 1 projects moved by 2 years or more, 8% of the year’22Originally due 2023: 13 projects kept the original date, 93% of the yearOriginally due 2023: 1 projects moved by 2 years or more, 7% of the year’23Originally due 2024: 18 projects kept the original date, 95% of the yearOriginally due 2024: 1 projects moved by under 2 years, 5% of the year’24Originally due 2025: 10 projects kept the original date, 83% of the yearOriginally due 2025: 2 projects moved by under 2 years, 17% of the year’25Originally due 2026: 27 projects kept the original date, 93% of the yearOriginally due 2026: 1 projects moved by under 2 years, 3% of the yearOriginally due 2026: 1 projects moved by 2 years or more, 3% of the year’26Originally due 2027: 18 projects kept the original date, 100% of the year’27Originally due 2028: 14 projects kept the original date, 100% of the year’28Originally due 2029: 11 projects kept the original date, 100% of the year’29Originally due 2030: 17 projects kept the original date, 100% of the year’30Originally due 2031: 6 projects kept the original date, 100% of the year’31Originally due 2032: 9 projects kept the original date, 100% of the year’32Originally due 2033: 2 projects kept the original date, 100% of the year’33Originally due 2034: 1 projects kept the original date, 100% of the year’34Originally due 2035: 2 projects kept the original date, 100% of the year’35

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

01,2502,5003,7505,000’18Originally due 2019: 272 flats moved by under 2 years, 20% of the year (only 6 of 25 projects filed a flat count)Originally due 2019: 387 flats moved by 2 years or more, 20% of the year (only 6 of 25 projects filed a flat count)’19Originally due 2020: 44 flats kept the original date, 80% of the year (only 3 of 10 projects filed a flat count)Originally due 2020: 122 flats moved by under 2 years, 20% of the year (only 3 of 10 projects filed a flat count)’20Originally due 2021: 52 flats moved by 2 years or more, 20% of the year (only 1 of 5 projects filed a flat count)’21Originally due 2022: 165 flats kept the original date, 83% of the year (only 3 of 12 projects filed a flat count)Originally due 2022: 499 flats moved by 2 years or more, 8% of the year (only 3 of 12 projects filed a flat count)’22Originally due 2023: 190 flats moved by 2 years or more, 7% of the year (only 1 of 14 projects filed a flat count)’23Originally due 2024: 184 flats kept the original date, 95% of the year (only 4 of 19 projects filed a flat count)Originally due 2024: 26 flats moved by under 2 years, 5% of the year (only 4 of 19 projects filed a flat count)’24Originally due 2025: 115 flats kept the original date, 83% of the year (only 5 of 12 projects filed a flat count)Originally due 2025: 123 flats moved by under 2 years, 17% of the year (only 5 of 12 projects filed a flat count)’25Originally due 2026: 1,800 flats kept the original date, 93% of the yearOriginally due 2026: 258 flats moved by under 2 years, 3% of the yearOriginally due 2026: 718 flats moved by 2 years or more, 3% of the year’26Originally due 2027: 1,599 flats kept the original date, 100% of the year’27Originally due 2028: 439 flats kept the original date, 100% of the year’28Originally due 2029: 853 flats kept the original date, 100% of the year’29Originally due 2030: 1,748 flats kept the original date, 100% of the year’30Originally due 2031: 677 flats kept the original date, 100% of the year’31Originally due 2032: 1,369 flats kept the original date, 100% of the year’32Originally due 2033: 515 flats kept the original date, 100% of the year’33Originally due 2034: 561 flats kept the original date, 100% of the year’34Originally due 2035: 301 flats kept the original date, 100% of the year’35

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Dadra & Nagar Haveli

Who sanctions building in Dadra & Nagar Haveli

115 of the 218 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
DADRA AND NAGAR HAVELI PLANNING & DEVELOPMENT AUTHORITY47
Silvassa Municipal Council34
22 other bodies34

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 218 registrations on this page answers this: on 157 the promoter is the only owner named; on 55 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 6 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Projects in Dadra & Nagar Haveli

Showing 1 to 60 of 218 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
ORION IMPERIANaroli, 396235Mpoonam Developers LLP71843%12 Dec 2017Registered
PRAMUKH SHIVANTAB/H SAMARVARNI PANCHAYAT OFFICE, 396230ROYAL ENTERPRISE56114%16 Aug 2024Registered
SHASHIKALP SAROVARATHAL, SILVASSA, 396230AKS BUILDERS AND DEVELOPERES49952%4 Jul 2018Registration lapsed
Ekdant Silver OakNaroli, 396230Ekdant Developers3078%12 Jan 2026Registered
Nagjua AnantaUltan Falia, 396230MICROMEGA PROJECTS27589%10 Jan 2023Registered
ROYAL VIEW-IISILVASSA, 396230M & P DEVELOPERS2600%17 Mar 2026Registered
PARADISE ONEVILLAGE - SAMARVARNI, 396230JMB REALTY25854%26 Sep 2022Registered
SAHAJ INFINITYNAROLI, 396235ADITYA REALITY2580%21 May 2026Registered
Ekdant Sapphire SpringsOthers, 396230Ekdant Developers25641%6 May 2025Registered
SUNRAHI SKYLINEKHANVEL, 396230NISHMA SUNNY BHIMRA2485%19 May 2025Registered
MANGALAM HEIGHTS PHASE-IIOthers, 396230MANGALAM DEVELOPERS22430%26 Jun 2025Registered
YOGI WOODS PHASE 2Others, 396230Shiv Builders22329%11 Aug 2025Registered
Pramukh Nakshatra-2 Ph-1Village Amli, 396230Pramukh Realty2161%6 Feb 2026Registered
KRISHNA TOWERSSILVASSA, 396230PRABHAT PRATAPJI RAJPUROHIT21545%3 Feb 2023Registered
EDEN COURTSAYLI, 396240Silverbill Properties LLP2080%28 Apr 2026Registered
MEADOWSBHURKUD FALIYA, 396230PRAMUKH REALTY20173%5 Oct 2021Completed
ARIHANT A & B WING396230Arihant Developers19012%8 Dec 2017Registration lapsed
AKSHAR RESIDENCYSILVASSA, 396230SNT DEVELOPERS18072%27 Jun 2023Registered
BALAJI RESIDENCYDADRA, 396235DREAM DEVELOPERS17634%23 Jun 2025Registered
SPRING CITY P2MASAT, 396230SPRING CITY DEVELOPERS17422%7 Oct 2025Registered
PRAMUKH GARDENS-2Nr. Dokmardi Bridge, 396230PRAMUKH REALTY17296%22 Nov 2021Registered
THE AVENUESILVASSA, 396230DEVYANI RAJENDRASINH DODIA16811%8 Sep 2021Registration lapsed
Pramukh Swagat-2 A,B,C BuildingSilvassa, 396230Pramukh Realty16434%29 Jan 2026Registered
SIDDHI TOWEROPP FIRE STATION SILVASSA, 396230VIMLESH YUGRAJ SHUKLA16439%7 Nov 2017Registration lapsed
YOGI WOODS PH-1Silvassa, 396230SHIV BUILDERS16338%6 Mar 2023Registered
PALLADIUM ALCOVESILVASSA, 396230SEVEN - 9 DEVCON LLP16217%13 Jul 2023Registered
JALARAM DARSHAN PHASE IIOthers, 396230RADHEKRISHNA DEVELOPERS15940%7 Nov 2017Registration lapsed
Polaris Infinity A A1, A2, A3, A4Vaghdhara Road, Dadra., 396230R R Enterprise15934%12 May 2022Registered
HORIZON CITYVill Amli, 396230JN INFRA1565%10 Mar 2026Registered
ADVAIT SKYLINENAROLI, 396235DHANASVI INFRA1550%6 Apr 2026Registered
Pramukh Meadows-2 Ph-1Silvassa, 396230TOUGH BUILDERS AND CONSTRUCTIONS LLP1501%16 Mar 2026Registered
SAHAJANAND INTEGRITYAMLI SILVASSA, 396230SHREEJI DEVELOPERS15031%13 Feb 2020Registered
ARV UNICASILVASSA, 396230M/S. A.R.V. REALTY14842%9 Feb 2022Registered
Kalpataru Skyline- Phase-IIBhurkud Faliya, St. Xaviers School Road, 396230JNR BUILDERS14627%12 Jan 2026Registered
Tropical Greens Phase-2 BKamli Falia, 396230MICROMEGA PROJECTS14650%6 Nov 2023Registered
POONAM RESIDENCY A B AND D WINGDadra, 396230Gagan Kishorbhai Chotaliya1450%23 Jun 2025Registered
Tropical Greens Phase-2 ANoori falia, 396230MICROMEGA PROJECTS14574%26 Aug 2022Registered
VRINDAVANDadra, 396193KRISHNA DEVELOPERS14530%11 Aug 2025Registered
AKSHAR GREENS PHASE-2SILVASSA, 396230MUNIVAR DEVELOPERS14462%17 Apr 2023Completed
AKSHAR HEIGHTS PHASE-2Silvassa, 396230MUNIVAR DEVELOPERS1400%22 Jun 2026Registered
PALLADIUM HIGHSTREETSILVASSA, 396230SEVEN - 9 DEVCON LLP13949%13 Nov 2024Registered
Heaven PlazaDudhani Road, Village Khanvel, 396230Diamond Developers1370%15 Jun 2026Registered
Ekdant Sanskriti Building BAmli, 396230KALPSHREE HOMES13537%13 Nov 2024Registered
GOKULDHAM TOWNSHIPDADRA, 396193DOSHI AND MEHTA ASSOCIATES13519%17 Mar 2025Registered
AKAR HEIGHTSMORI FALIYA, 396235RAMDEV BUILDERSS1271%9 Jun 2026Registered
HORIZON INDUSTRIAL PARKVILLAGE MASAT, SILVASSA, 396230SAI INFRA INDUSTRIES12324%10 Mar 2021Completed
Palladium High Street West Gate B & C-, 396230SEVEN - 9 DEVCON LLP12239%27 Feb 2026Registered
RAJESHREE RESIDENCY IIATHAL, 396230J B DEVELOPERS1220%27 Mar 2025Registered
AKSHAR AVENUESILVASSA, 396230SHIVSHAKTI DEVELOPERS12033%3 Jul 2025Registered
SHREE SAKHA SADANSILVASSA-VAPI ROAD, DADRA, 396230SHREE SAKHA DEVELOPERS PRIVATE LIMITED1200%7 Aug 2018Registration lapsed
J9 TRITONSILVASSA, 396230FOUR SEASONS LIFE SPACE11624%31 Jul 2021Registered
Mangalam HomesNear Tropical Greens, Silvassa., 396230Mangalam Buildcon1120%8 Jun 2026Registered
MANGALAM RIVERSIDENEAR BALAJI GEMS, NAKSHATRA GARDEN ROAD, 396230MANGALAM ENTERPRISE11219%28 Jul 2025Registered
RUDRAKSH-1NAROLI, 396235SHREE VINAYAK DEVELOPERS10529%28 Mar 2025Registered
Saffron HeightDadra & Nagar Haveli, 396230Sun Corporation10366%7 Nov 2017Completed
SUMUKH RESIDENCYNAROLI, 396240ECSTASY DEVELOPERS9624%3 Oct 2022Registered
PALLADIUM SQUARESILVASSA, 396230SEVEN - 9 DEVCON LLP9399%2 Feb 2022Completed
Saffron Height Phase 2 , Building C And DAthal, 396230Sun Corporation9368%8 Feb 2019Registration lapsed
RAJ HEAVENS PHASE II D WINGSILVASSA, 396230BURHANI TAMOS DEVELOPERS9054%17 Jan 2023Registration lapsed
ORION VILLA - P1DHAPSA VILLAGE, 396235M.POONAM DEVELOPERS8990%29 Nov 2017Registration lapsed
Planning a launch in Dadra & Nagar Haveli? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Dadra & Nagar Haveli

Pramukh Realty (14), JALARAM DEVELOPERS (7), Shiv Builders (6), MICROMEGA PROJECTS (5), SEVEN - 9 DEVCON LLP (5), DATTAINFINITY (5). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Dadra & Nagar Haveli projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 30% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Dadra & Nagar Haveli project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Dadra & Nagar Haveli district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Dadra & Nagar Haveli registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Dadra & Nagar Haveli project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Dadra & Nagar Haveli district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.