Home / Browse projects / Thane, Maharashtra / ZENITH

Registered No litigation declared Residential / Group Housing project

ZENITH

By RUNWAL DEVELOPERS LIMITED

RG-MH-38491 · RERA P51700046734 · Last updated on MahaRERA portal: 13 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 63%
164 of 290Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

ZENITH is a Residential / Group Housing project by RUNWAL DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700046734 on 1 Sep 2022. Possession is promised by 30 Sep 2028. 126 of the 290 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameZENITH
  • TypeResidential / Group Housing
  • Location
    • BALKUM ROAD
    • BALKUM DHOKALI
    • Thane (M Corp.)
    • Thane
    • 400608
  • Pincode400608
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700046734
  • ReraGenie IDRG-MH-38491

Builder

  • NameRUNWAL DEVELOPERS LIMITED
  • Entity typeCompany
  • CINU70100MH1988PLC046631
  • GSTIN27AAACR0395J1Z8
  • DirectorSunil Satvilkar
  • Other registrations8 more →
  • Past their filed date1
  • Declared earlier projects8 →

Key dates

this monthRegisteredSep 2022PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2022
  • Promised completion30 Sep 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed104 files

Current status

43%126 of 290 units booked
23.4%Work done, per cost certificate

Figures as on 13 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 14NA67492900290

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 63%.

TOWER 14: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor60%
Slabs of Super Structure63%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed290

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots290
Closed/Covered280
Open Space10

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,160 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Apr 2026

Approvals and building plan

Sanctioning authorityTMC
Permissible FSI40490.0
Proposed, not sanctioned26,078 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 9 10 Mary Land Corner Beside Next Show Room Eastern Express High Way, Circle near Sion Sion
Estimated costRs 345.06 cr
Cost incurredRs 80.84 cr
Work done23.43%
BuildingWingEstimatedIncurred
TOWER 14NARs 293.30 crRs 68.71 cr
-NARs 51.76 crRs 12.13 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNinad Dinkar Mhaskar
ArchitectPallavi Matkari
EngineerMadhusudhan Narayan
EngineerPrashant Mewada
Chartered AccountantSinghi & Co. Chartered Accountants
Chartered AccountantS P Gunjal & Associates
PartnerRole in project
RUNWAL DEVELOPERS LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2028

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf13 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf13 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf13 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf24 Apr 2026
Form 1File: Form 1.pdf4 Feb 2026
Form 2File: Form 2-Zenith-M.pdf4 Feb 2026
Form 3File: Form 3-Zenith.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: Zenith-Sold-Unsold.pdf4 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf11 Dec 2025
Form 5 (FY 2024-2025)File: Form 5.pdf3 Dec 2025
Form 1File: Form 1.pdf28 Oct 2025
Form 2File: Form 2.pdf28 Oct 2025
Form 3File: Form 3.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf28 Oct 2025
Form 1File: Form 1.pdf30 Jul 2025
Form 2File: Form 2 June.pdf30 Jul 2025
Form 3File: Form 3 June 2025.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf30 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2024.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2024.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2024.pdf21 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023 24.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 2024.pdf5 Nov 2024
PAN CardFile: Pan Card - RDPL.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 2024.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sep 2024.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2024.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A March 2024.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A March 2024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory March 2024.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf23 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory compressed.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 compressed.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf18 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf16 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Zenith 30 09 2023.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Zenith.pdf23 Oct 2023
Home Buyer /Allottee Grievance Redressal CellFile: Declaration Zenith.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Zenith 30 Sept 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Zenith.pdf19 Oct 2023
Other - TechnicalFile: PLAN FOR RERA Zenith 24 07 2023.pdf31 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Zenith as on 30 06 2023.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on 30 60 2023.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold list Zenith.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Zenith as on 30 06 2023 compressed.pdf21 Jul 2023
Details of encumbrances concerned to FinanceFile: Self Declaration of Encumbrances 25 05 2023.pdf25 May 2023
Details of encumbrances concerned to LegalFile: Self Declaration of Encumbrances 25 05 2023.pdf25 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 31 03 2023.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Zenith 31 03 2023.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Zenith 31 03 2023.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Zenith 31 03 2023.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 31 03 2023.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 31 03 2023.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Zenith 31 03 2023.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate for 31 03 2023.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Zenith Form 1.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zenith Engineers Certificate.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Zenith sold and unsold.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Zenith.pdf20 Jan 2023
Proforma of Allotment letterFile: FIRST DRAFT OF AFS - ZENITH 29 08 2022.pdf29 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Declaration on Deviation in AFS Part I.pdf29 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Declaration on Deviation in AFS Part II.pdf29 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Declaration on Deviation in AFS Part III.pdf29 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Declaration on Deviation in AFS Part IV.pdf29 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Declaration on Deviation in AFS Part V.pdf29 Aug 2022

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
25HOURLIFE - Tower A1P51700053696Chitalsar Manpada, Thane590Nov 2023OngoingDec 2030Not due yet
25HOURLIFE - Tower C1P51700048278Panchpakhadi, Thane319Dec 2022OngoingDec 2029Not due yet
25HOURLIFE - Tower B1P51700048270Punchpakhadi, Thane539Dec 2022OngoingDec 2029Not due yet
RGC PHASE I TOWER IVY AND LILYVillage Balkum District Thane138-CompletedDec 2016Apr 2016
RGC PHASE IIVillage Balkum District Thane360-CompletedMay 2014Late, Feb 2016

How this compares with Thane

43%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ZENITH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BALKUM DHOKALI7,600+ in Thane

2 kmZENITHCompleted 175Lapsed / revoked 64Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 394 registered projects within 2 km.

Builder: RUNWAL DEVELOPERS LIMITED

RUNWAL DEVELOPERS LIMITED has 9 registrations on MahaRERA, including RUNWAL TIMELESS and ZENITH. Its filings disclose 8 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ZENITH is delayed beyond 30 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ZENITH?

The registered promoter entity is RUNWAL DEVELOPERS LIMITED, a company as per the filing. Its CIN U70100MH1988PLC046631 and GSTIN 27AAACR0395J1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ZENITH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ZENITH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ZENITH?

The professionals named in the filing: Architect: Ninad Dinkar Mhaskar; Architect: Pallavi Matkari; Engineer: Madhusudhan Narayan; Engineer: Prashant Mewada; Chartered Accountant: Singhi & Co. Chartered Accountants; Chartered Accountant: S P Gunjal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ZENITH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ZENITH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ZENITH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.