ZENITH
RG-MH-38491 · RERA P51700046734 · Last updated on MahaRERA portal: 13 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ZENITH is a Residential / Group Housing project by RUNWAL DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700046734 on 1 Sep 2022. Possession is promised by 30 Sep 2028. 126 of the 290 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameZENITH
- TypeResidential / Group Housing
- Location
- BALKUM ROAD
- BALKUM DHOKALI
- Thane (M Corp.)
- Thane
- 400608
- Pincode400608
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700046734
- ReraGenie IDRG-MH-38491
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Sep 2022
- Promised completion30 Sep 2028
- Revised completionNone
- Buildings1 building record
- Documents filed104 files
Current status
Figures as on 13 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER 14 | NA | 67 | 49 | 290 | 0 | 290 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 63%.
TOWER 14: 48% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 50% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 63% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed290
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TOWER 14 | NA | Rs 293.30 cr | Rs 68.71 cr |
| - | NA | Rs 51.76 cr | Rs 12.13 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ninad Dinkar Mhaskar |
| Architect | Pallavi Matkari |
| Engineer | Madhusudhan Narayan |
| Engineer | Prashant Mewada |
| Chartered Accountant | Singhi & Co. Chartered Accountants |
| Chartered Accountant | S P Gunjal & Associates |
| Partner | Role in project |
|---|---|
| RUNWAL DEVELOPERS LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Sep 2028
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 13 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 13 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 13 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 24 Apr 2026 |
| Form 1File: Form 1.pdf | 4 Feb 2026 |
| Form 2File: Form 2-Zenith-M.pdf | 4 Feb 2026 |
| Form 3File: Form 3-Zenith.pdf | 4 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Zenith-Sold-Unsold.pdf | 4 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 11 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 3 Dec 2025 |
| Form 1File: Form 1.pdf | 28 Oct 2025 |
| Form 2File: Form 2.pdf | 28 Oct 2025 |
| Form 3File: Form 3.pdf | 28 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 28 Oct 2025 |
| Form 1File: Form 1.pdf | 30 Jul 2025 |
| Form 2File: Form 2 June.pdf | 30 Jul 2025 |
| Form 3File: Form 3 June 2025.pdf | 30 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 30 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2024.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2024.pdf | 21 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2024.pdf | 21 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023 24.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 2024.pdf | 5 Nov 2024 |
| PAN CardFile: Pan Card - RDPL.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 2024.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sep 2024.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 2024.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2024.pdf | 23 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A March 2024.pdf | 2 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A March 2024.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory March 2024.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf | 23 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory compressed.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 compressed.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 18 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 18 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 16 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Zenith 30 09 2023.pdf | 26 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Zenith.pdf | 23 Oct 2023 |
| Home Buyer /Allottee Grievance Redressal CellFile: Declaration Zenith.pdf | 23 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Zenith 30 Sept 2023.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Zenith.pdf | 19 Oct 2023 |
| Other - TechnicalFile: PLAN FOR RERA Zenith 24 07 2023.pdf | 31 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Zenith as on 30 06 2023.pdf | 21 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on 30 60 2023.pdf | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold list Zenith.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Zenith as on 30 06 2023 compressed.pdf | 21 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Self Declaration of Encumbrances 25 05 2023.pdf | 25 May 2023 |
| Details of encumbrances concerned to LegalFile: Self Declaration of Encumbrances 25 05 2023.pdf | 25 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 31 03 2023.pdf | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Zenith 31 03 2023.pdf | 21 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Zenith 31 03 2023.pdf | 21 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Zenith 31 03 2023.pdf | 21 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 31 03 2023.pdf | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 31 03 2023.pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Zenith 31 03 2023.pdf | 20 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate for 31 03 2023.pdf | 19 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Zenith Form 1.pdf | 20 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zenith Engineers Certificate.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Zenith sold and unsold.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Zenith.pdf | 20 Jan 2023 |
| Proforma of Allotment letterFile: FIRST DRAFT OF AFS - ZENITH 29 08 2022.pdf | 29 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Declaration on Deviation in AFS Part I.pdf | 29 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Declaration on Deviation in AFS Part II.pdf | 29 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Declaration on Deviation in AFS Part III.pdf | 29 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Declaration on Deviation in AFS Part IV.pdf | 29 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Declaration on Deviation in AFS Part V.pdf | 29 Aug 2022 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| 25HOURLIFE - Tower A1P51700053696 | Chitalsar Manpada, Thane | 590 | Nov 2023 | Ongoing | Dec 2030 | Not due yet |
| 25HOURLIFE - Tower C1P51700048278 | Panchpakhadi, Thane | 319 | Dec 2022 | Ongoing | Dec 2029 | Not due yet |
| 25HOURLIFE - Tower B1P51700048270 | Punchpakhadi, Thane | 539 | Dec 2022 | Ongoing | Dec 2029 | Not due yet |
| RGC PHASE I TOWER IVY AND LILY | Village Balkum District Thane | 138 | - | Completed | Dec 2016 | Apr 2016 |
| RGC PHASE II | Village Balkum District Thane | 360 | - | Completed | May 2014 | Late, Feb 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ZENITH on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BALKUM DHOKALI7,600+ in Thane
Filed coordinates, straight-line distance. 394 registered projects within 2 km.
RUNWAL EIRENE - PART I
Runwal Developers Private Limited
Dosti West County - Dosti Nest - Phase 1
DOSTI ENTERPRISES
Dosti West County - Dosti Nest - Phase 3
DOSTI ENTERPRISES
DOSTI WEST COUNTY - DOSTI TULIP
DOSTI ENTERPRISES
Dosti West County - Dosti Nest - Phase 4
DOSTI ENTERPRISES
Vaikunth Cluster 3 Tower 2
PEPL Developers Pvt Ltd
See every Thane project, with the district possession charts
Builder: RUNWAL DEVELOPERS LIMITED
RUNWAL DEVELOPERS LIMITED has 9 registrations on MahaRERA, including RUNWAL TIMELESS and ZENITH. Its filings disclose 8 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if ZENITH is delayed beyond 30 Sep 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ZENITH?
The registered promoter entity is RUNWAL DEVELOPERS LIMITED, a company as per the filing. Its CIN U70100MH1988PLC046631 and GSTIN 27AAACR0395J1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ZENITH?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ZENITH?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ZENITH?
The professionals named in the filing: Architect: Ninad Dinkar Mhaskar; Architect: Pallavi Matkari; Engineer: Madhusudhan Narayan; Engineer: Prashant Mewada; Chartered Accountant: Singhi & Co. Chartered Accountants; Chartered Accountant: S P Gunjal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ZENITH?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.