Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedno revision filed
20 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 99%
118 of 672Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 134 documents Report an error

DOSTI WEST COUNTY - DOSTI TULIP is a Residential / Group Housing project by DOSTI ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700032666 on 17 Jan 2022. Possession is promised by 31 Oct 2026. 554 of the 672 units on this registration are recorded sold or booked, and 20 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameDOSTI WEST COUNTY - DOSTI TULIP
  • TypeResidential / Group Housing
  • Location
    • BALKUM BHIWANDI WADPA ROAD
    • THANE
    • Thane (M Corp.)
    • 400608
  • Pincode400608
  • RERA no.P51700032666
  • ReraGenie IDRG-MH-76934

Builder

  • NameDOSTI ENTERPRISES
  • Entity typeOthers
  • Named personsDosti Realty Ltd., Sanghvi Finance Pvt. Ltd., Suraksha Realty Ltd.
  • Other registrations14 more →
  • Completed2 of 15
  • Declared earlier projects16 →

Key dates

this monthRegisteredJan 2022PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Jan 2022
  • Promised completion31 Oct 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed134 files

Current status

82%554 of 672 units booked
80.9%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1 wing ANA343018115196
Building 2 wing BNA343023015245
Building 3NA33282310231

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 99%.

Building 1 wing A88%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises84%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.81%
Building 2 wing B88%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises86%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.86%
Building 373%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises69%
Sanitary Fittings within the flats / premises77%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks88%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.56%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.17%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes88%
Storm Water DrainsYes72%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes65%
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes85%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes45%
Open ParkingNoNot applicable

Parking filed594

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots594
Closed/Covered594
BuildingClosed/CoveredTotal
Building 1 wing A249249
Building 2 wing B297297
Building 34848

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,210 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2025

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI71701.0
Proposed, not sanctioned50,175 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFORT, MUMBAI
Estimated costRs 348.70 cr
Cost incurredRs 282.11 cr
Work done80.9%
BuildingWingEstimatedIncurred
Building 3NARs 111.97 crRs 50.89 cr
Building 1 wing ANARs 111.97 crRs 109.73 cr
Building 2 wing BNARs 111.97 crRs 109.73 cr
-NARs 12.78 crRs 11.75 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAY R VORA
ArchitectTEN FOLDS
EngineerVaibhav Raghunath Kalambate
EngineerSWAPNIL LONDHE
EngineerJW CONSULTANTS LLP
Chartered AccountantBAGADE AND ASSOCIATES
Chartered AccountantMANISH BARDIA & CO
PartnerRole in project
DOSTI ENTERPRISES-

Litigation declared1

CaseCourtStatus
308/2014CJSD ThaneFor framing of issues

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000408333Jayshree Eknath PatilDosti Enterprises Dosti West County Dosti Tulip27/12/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed134

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 134 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Dosti Enterprises DWC Tulip Form 1 Mar26.pdf28 Apr 2026
Withdrawal Update Form 2File: Dosti Enterprises DWC Tulip Form 2 Mar26.pdf28 Apr 2026
Withdrawal Update Form 3File: Dosti Enterprises DWC Tulip Form 3 Mar26_compressed.pdf28 Apr 2026
Withdrawal Update Form 1File: Dosti Enterprises DWC Tulip Form 1 Dec25.pdf28 Jan 2026
Withdrawal Update Form 2File: Dosti Enterprises DWC Tulip Form 2 Dec25.pdf28 Jan 2026
Withdrawal Update Form 3File: Dosti Enterprises DWC Tulip Form 3 Dec25compressed.pdf28 Jan 2026
Withdrawal Update Form 1File: DWC Dosti Tulip Arch certificate.pdf21 Nov 2025
Withdrawal Update Form 1File: DWC Dosti Tulip Arch certificate.pdf21 Nov 2025
Withdrawal Update Form 1File: DWC Dosti Tulip Arch certificate.pdf21 Nov 2025
Withdrawal Update Form 2File: Form2 Engg-DWC Dosti Tulip June 2024.pdf21 Nov 2025
Withdrawal Update Form 2File: DWC Tulip Engg certificate Sep 2025.pdf21 Nov 2025
Withdrawal Update Form 2File: DWC Tulip Engg certificate Sep 2025.pdf21 Nov 2025
Withdrawal Update Form 3File: Form3 CA-DWC Dosti Tulip June 2024.pdf21 Nov 2025
Withdrawal Update Form 3File: DWC Dosti Tulip CA certificate 5Nov2025_compressed.pdf21 Nov 2025
Withdrawal Update Form 3File: DWC Dosti Tulip CA certificate 5Nov2025_compressed.pdf21 Nov 2025
Form 5 (FY 2024-2025)File: DE DWC TULIP.pdf12 Nov 2025
Building plan approvalFile: PLOT A4 REVISED PERMISSION CC.pdf17 Jul 2025
Building plan approvalFile: PLOT A4 REVISED SANCTION PLAN_compressed.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DWC TULIP Architect's Certificate.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWC TULIP CA Certificate.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DWC TULIP Engg Certificate.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: DWC Dosti Tulip Bui 1 2 3 A B.pdf15 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DWC TULIP Quality Certificate March2025.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: DWC Tulip.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: DWC Dosti Tulip DWC.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DWC Dosti Tulip Arch certificate 27Dec2024.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWC Dosti Tulip CA certificate 27Dec2024.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DWC Dosti Tulip Engineer certificate 27Dec2024.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DWC Dosti Tulip Form1 sep24.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWC Dosti Tulip Form3 Sep24.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DWC Dosti Tulip Form2 sep24.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DWC Dosti tulip.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: 10-0 DWC Dosti Tulip.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 ARCH-DWC Dosti Tulip June 2024.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engg-DWC Dosti Tulip June 2024.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 CA-DWC Dosti Tulip June 2024.pdf29 Jul 2024
Disclosure of sold/ booked inventoryFile: DWC-Tulip.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DWC Dosti Tulip-compressed.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate DWC Dosti tulip.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate DWC Dosti Tulip.pdf25 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Dostiwestcounty-DostiTulip.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: TULIP Sales Data-Rera Compliance As on 29-12-2023_11zon.pdf4 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DWC Dosti Tulip.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate DWC Dosti Tulip.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tulip Arch certi 30 dec.pdf3 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tulip Eng certi 30 dec.pdf3 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tulip CA certi 02 Jan-compressed.pdf3 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Dosti West County Dosti Tulip.pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Tulip Architects certificate 23-11.pdf4 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tulip-Engg Certificate Dt 25-11.pdf4 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tulip CA Certificate Dt 27-11_compressed (1).pdf4 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tulip Arch Cert 25 Oct_compressed.pdf16 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tulip Eng Cert 25 Oct_compressed.pdf16 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tulip CA Cert 25 Oct_compressed.pdf16 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dosti West County Dosti Tulip.pdf23 Oct 2023
Disclosure of sold/ booked inventoryFile: Dosti Tulip A Wing.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tulip Arch Certificate 11 Sept.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tulip Eng Certificate 14 Sept_compressed.pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tulip CA Certificate 15 Sept_compressed.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tulip Rera ENGG certificate June.pdf14 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tulip Rera CA certificate June.pdf14 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tulip Rera ARCH certificate June.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: TULIP.pdf7 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC - AMENDED.pdf27 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Tulip - Form 1.pdf26 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dosti Tulip - Form 2.pdf26 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti Tulip - Form 3.pdf26 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Dosti West County Dosti Tulip.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Dosti West County - Dosti Tulip - Sold-Unsold Data.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate - Dosti Tulip - compressed.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Tulip Form 1 march 2023.pdf11 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dosti Tulip Form 2 march 2023.pdf11 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti Tulip Form 3 march 2023_compressed.pdf11 Apr 2023
Disclosure of sold/ booked inventoryFile: Dosti Tulip A wing.pdf30 Jan 2023
Disclosure of sold/ booked inventoryFile: Dosti Tulip B wing.pdf30 Jan 2023
Disclosure of sold/ booked inventoryFile: Dosti Tulip C wing.pdf30 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti Tulip.pdf25 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Tulip-Arch Certificate.pdf16 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate Dosti Tulip.pdf28 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate tulip.pdf23 Nov 2022

How this compares with Thane

82%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DOSTI WEST COUNTY - DOSTI TULIP on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THANE7,600+ in Thane

Builder: DOSTI ENTERPRISES

DOSTI ENTERPRISES has 15 registrations on MahaRERA, including DOSTI WEST COUNTY - DOSTI OAK and DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR. Its filings disclose 16 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DOSTI WEST COUNTY - DOSTI TULIP is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DOSTI WEST COUNTY - DOSTI TULIP?

The registered promoter entity is DOSTI ENTERPRISES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DOSTI WEST COUNTY - DOSTI TULIP?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DOSTI WEST COUNTY - DOSTI TULIP?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DOSTI WEST COUNTY - DOSTI TULIP?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DOSTI WEST COUNTY - DOSTI TULIP?

The professionals named in the filing: Architect: JAY R VORA; Architect: TEN FOLDS; Engineer: Vaibhav Raghunath Kalambate; Engineer: SWAPNIL LONDHE; Engineer: JW CONSULTANTS LLP; Chartered Accountant: BAGADE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DOSTI WEST COUNTY - DOSTI TULIP?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DOSTI WEST COUNTY - DOSTI TULIP. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DOSTI WEST COUNTY - DOSTI TULIP to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.