Home / Browse projects / Thane, Maharashtra / 25HOURLIFE - Tower B1

Registered Litigation declared Residential / Group Housing project

25HOURLIFE - Tower B1

By RUNWAL DEVELOPERS LIMITED

RG-MH-82478 · RERA P51700048270 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 7 cases
  • 3 complaints at MahaRERA
  • Rs 200.00 crore secured on the land, in favour of Tata Capital Housing Finance Limited and ICICI Bank Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Staircases, 90%
130 of 539Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

25HOURLIFE - Tower B1 is a Residential / Group Housing project by RUNWAL DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700048270 on 22 Dec 2022. Possession is promised by 31 Dec 2029. 409 of the 539 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • Name25HOURLIFE - Tower B1
  • TypeResidential / Group Housing
  • Location
    • Ghodbundar Road
    • Punchpakhadi
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700048270
  • ReraGenie IDRG-MH-82478

Builder

  • NameRUNWAL DEVELOPERS LIMITED
  • Entity typeCompany
  • CINU70100MH1988PLC046631
  • GSTIN27AAACR0395J1Z8
  • DirectorSunil Satvilkar
  • Other registrations8 more →
  • Past their filed date1
  • Declared earlier projects8 →

Key dates

this monthRegisteredDec 2022PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Dec 2022
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed122 files

Current status

76%409 of 539 units booked
46.5%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower B1 Building No 3NA63555390539

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

Tower B1 Building No 3: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed265

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots265
Closed/Covered265

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,553 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofTata Capital Housing Finance Limited and ICICI Bank Limited
Secured amountRs 200.00 crore
CERSAI search filedYes
Declared on19 Nov 2025

Approvals and building plan

Sanctioning authorityThane Municipal Corporation Thane
Permissible FSI43278.35
Proposed, not sanctioned17,016 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 9 10 Mary Land Corner Beside Next Show Room Eastern Express Highway Near Sion Circle Sion Mu
Estimated costRs 284.70 cr
Cost incurredRs 132.43 cr
Work done46.52%
BuildingWingEstimatedIncurred
Tower B1 Building No 3NARs 222.06 crRs 103.29 cr
-NARs 62.63 crRs 29.13 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBroadway Malyan
ArchitectNinad Dinkar Mhaskar
EngineerMadhusudan Narayan
EngineerSanjay Singh
EngineerRaman Iyer
Chartered AccountantS. P. Gunjal & Associates
Chartered AccountantS. M. Gupta & Co.
Chartered AccountantS P Gunjal & Associates
Chartered AccountantSinghi and Co. Chartered Accountants
PartnerRole in project
RUNWAL DEVELOPERS LIMITED-

Litigation declared7

CaseCourtStatus
79/2011Calcutta High CourtPending
12/2009Calcutta High CourtPending
565/2022Civil Judge S D ThanePending
52/2022Calcutta High CourtPending
102/2022Calcutta High CourtPending
113/2022Calcutta High CourtPending
12/2009Calcutta High CourtOngoing

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000480324Mehul Jagannath MaliDhruva Woollen Mills Pvt Ltd01/05/2024
SM12500205Bhakti AchrekarRUNWAL DEVELOPERS PRIVATE LIMITED27/11/2025
CC12602165Anand Dayanand MalathuRUNWAL DEVELOPERS LIMITED13/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A.pdf17 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf13 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf13 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf13 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf29 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf29 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf29 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Mar 2026
Withdrawal Update Form 2File: Form 2 (2).pdf20 Mar 2026
Withdrawal Update Form 3File: Form 3 June 2024.pdf20 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf11 Dec 2025
Form 5 (FY 2024-2025)File: Form 5.pdf3 Dec 2025
Form 1File: Form 1.pdf28 Oct 2025
Form 2File: Form 2.pdf28 Oct 2025
Form 3File: Form 3.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf28 Oct 2025
Form 1File: Form 1 June 2025.pdf29 Jul 2025
Form 2File: Form 2 June 2025.pdf29 Jul 2025
Form 3File: Form 3 June 2025.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory June 2025.pdf29 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 25 Hourlife B1.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Apr 2025
Proforma of Agreement for saleFile: B1 - Revised with 2nd Supplementary Title Certificate Part 1.pdf12 Feb 2025
Proforma of Agreement for saleFile: B1 - Revised AFS with 2nd Supplementary Title Certificate Part 2.pdf12 Feb 2025
Proforma of Agreement for saleFile: B1 - Revised AFS with 2nd Supplementary Title Certificate Part 3.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2024.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2024.pdf23 Jan 2025
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Tower B1.pdf22 Jan 2025
Details of encumbrances concerned to LegalFile: Legal Encumbrance Tower B1.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2024.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2024.pdf21 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023 24.pdf13 Jan 2025
Details of encumbrances concerned to FinanceFile: Legal Encumbrance 25 Hourlife Tower B1.pdf6 Dec 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance 25 Hourlife Tower B1.pdf6 Dec 2024
Proforma of Agreement for saleFile: AFS 25Hourlife B1 1 100.pdf20 Nov 2024
Proforma of Agreement for saleFile: AFS 25Hourlife B1 101 131.pdf20 Nov 2024
Copy of the legal title reportFile: Supplementary Title Certificate issued by Adv Ditendra Mishra dtd 31 10 2024.pdf20 Nov 2024
Copy of the legal title reportFile: Supplementary Title Certificate issued by Adv Ditendra Mishra dtd 31 10 2024.pdf20 Nov 2024
Proforma of Agreement for saleFile: AFS 25Hourlife B1 1 100.pdf20 Nov 2024
Proforma of Agreement for saleFile: AFS 25Hourlife B1 101 131.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 2024.pdf29 Oct 2024
PAN CardFile: Pan Card - RDPL.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 2024.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 2024.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 2024.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2024.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold June 2024.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A March 2024.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory March 2024.pdf19 Apr 2024
Details of encumbrances concerned to FinanceFile: Finance Encumbrance 29 02 2024 B1.pdf21 Mar 2024
Details of encumbrances concerned to LegalFile: Finance Encumbrance 29 02 2024 B1.pdf21 Mar 2024
Declaration about Commencement CertificateFile: P B GLOBAL B1 CC Declaration.pdf16 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC dated 26 2 2024.pdf6 Mar 2024
Proforma of Agreement for saleFile: Revised AFS P B Global B1 18 112023.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf23 Jan 2024
Disclosure of sold/ booked inventoryFile: sold Unsold Inventory compressed.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 compressed.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf18 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf16 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Tower B1 30 09 2023.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower B1.pdf23 Oct 2023
Home Buyer /Allottee Grievance Redressal CellFile: Declaration 25Hourlife Tower B1.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 25Hourlife Tower B1 30 Sept 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 25Hourlife Tower B1.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 TB1 as on 30 06 2023.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower B1 as on 30 06 2023.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold list of 25Hourlife TB1 as on 30 06 2023.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 25Hourlife Tower B1 as on 30 06 2023.pdf20 Jul 2023
Details of encumbrances concerned to FinanceFile: Self Declaration for Encumbrance Legal Tower B1 dtd 04 07 2023.pdf6 Jul 2023
Details of encumbrances concerned to LegalFile: Self Declaration for Encumbrance Legal Tower B1 dtd 04 07 2023.pdf6 Jul 2023
Proforma of Agreement for saleFile: Compressed First Draft of AFS P B Global B1 26 5 2023.pdf26 May 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
25HOURLIFE - Tower A1P51700053696Chitalsar Manpada, Thane590Nov 2023OngoingDec 2030Not due yet
25HOURLIFE - Tower C1P51700048278Panchpakhadi, Thane319Dec 2022OngoingDec 2029Not due yet
ZENITHP51700046734BALKUM DHOKALI, Thane290Sep 2022OngoingSep 2028Not due yet
RGC PHASE I TOWER IVY AND LILYVillage Balkum District Thane138-CompletedDec 2016Apr 2016
RGC PHASE IIVillage Balkum District Thane360-CompletedMay 2014Late, Feb 2016

How this compares with Thane

76%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 25HOURLIFE - Tower B1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Punchpakhadi7,600+ in Thane

2 km25HOURLIFE - Tower B1Completed 175Lapsed / revoked 64Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 394 registered projects within 2 km.

Builder: RUNWAL DEVELOPERS LIMITED

RUNWAL DEVELOPERS LIMITED has 9 registrations on MahaRERA, including RUNWAL TIMELESS and ZENITH. Its filings disclose 8 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if 25HOURLIFE - Tower B1 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 25HOURLIFE - Tower B1?

The registered promoter entity is RUNWAL DEVELOPERS LIMITED, a company as per the filing. Its CIN U70100MH1988PLC046631 and GSTIN 27AAACR0395J1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 25HOURLIFE - Tower B1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 25HOURLIFE - Tower B1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 25HOURLIFE - Tower B1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 25HOURLIFE - Tower B1?

The professionals named in the filing: Architect: Broadway Malyan; Architect: Ninad Dinkar Mhaskar; Engineer: Madhusudan Narayan; Engineer: Sanjay Singh; Engineer: Raman Iyer; Chartered Accountant: S. P. Gunjal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 25HOURLIFE - Tower B1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 25HOURLIFE - Tower B1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 25HOURLIFE - Tower B1 to a free account