Home / Browse projects / Thane, Maharashtra / Dosti West County - Dosti Nest - Phase 3
Dosti West County - Dosti Nest - Phase 3
RG-MH-68671 · RERA P51700049724 · Last updated on MahaRERA portal: 23 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dosti West County - Dosti Nest - Phase 3 is a Residential / Group Housing project by DOSTI ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700049724 on 22 Feb 2023. Possession is promised by 31 Aug 2027. 634 of the 692 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameDosti West County - Dosti Nest - Phase 3
- TypeResidential / Group Housing
- Location
- Bhiwandi Wadpa Road
- Balkum
- Thane (M Corp.)
- Thane
- 400608
- Pincode400608
- RERA no.P51700049724
- ReraGenie IDRG-MH-68671
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Feb 2023
- Promised completion31 Aug 2027
- Revised completionNone
- Buildings1 building record
- Documents filed179 files
Current status
Figures as on 23 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Dosti Dove - Wing B and Wing C - EWS Building 1 - Part 2 and Part 3 | NA | 31 | 27 | 692 | 0 | 692 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 82%.
Dosti Dove - Wing B and Wing C - EWS Building 1 - Part 2 and Part 3: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 82% |
| Sanitary Fittings within the flats / premises | 67% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 72% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 62% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 24% |
Progress on shared amenities15
As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 10% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 30% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 15% |
| Energy managemcnt | Yes | 25% |
| Fire protection and fire safety requirements | Yes | 35% |
| Electrical meter room, sub-station, receiving station | Yes | 15% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Dosti Dove - Wing B and Wing C - EWS Building 1 - Part 2 and Part 3 | NA | Rs 170.65 cr | Rs 147.33 cr |
| - | NA | Rs 10.00 cr | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NEERJA PURANDARE |
| Architect | JAY R VORA |
| Architect | 10 Folds Architect & Consultant |
| Engineer | Vaibhav Raghunath Kalambate |
| Engineer | Swapnil Londhe |
| Engineer | PARAS R VISHWAKARMA |
| Chartered Accountant | BAGADE AND ASSOCIATES |
| Chartered Accountant | Manish Bardia & Co |
| Partner | Role in project |
|---|---|
| DOSTI ENTERPRISES | - |
Litigation declared13
| Case | Court | Status |
|---|---|---|
| 16/2013 | Civil Judge Senior Division Thane | For Exhibiting documents in the Evidence of defendant no three to thirty |
| 586/2011 | Civil Judge Junior Division Thane | For Evidence of plaintiff |
| 149/2010 | Civil Judge Junior Division Thane | For order on Evidence discard application of plaintiff |
| 1/2015 | Civil Judge Senior Division Thane | For list of witness of plaintiff |
| 23/2021 | District Judge Thane | For Final Arguments on Appeal |
| 687/2010 | Civil Judge Junior Division Thane | For Evidence of Defence part heard |
| 38/2012 | Civil Judge Junior Division Thane | FOR ORDER ON INTERVENTION APPLICATION OF DOSTI |
| 308/2014 | Civil Judge Senior Division Thane | For Evidence of plaintiff |
| 31/2018 | District Judge Thane | For steps by Applicants for securing presence of unserved respondents |
| 313/2018 | Civil Judge Junior Division Thane | For Hearing on deficit Court fee application of Defendant no twelve Dosti |
| 389/2017 | Civil Judge Senior Division Thane | For reply of Defendant no Ten on Delay condonation application of plaintiff |
| 35/2017 | Civil Judge Senior Division Thane | for say of plaintiff on Amendment Application |
| 400/2022 | Civil Judge Senior Division Thane | For reports of respondents |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12603434 | SANTOSH NARAYAN SAWANT | Dosti Enterprises | 04/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Aug 2027
Documents filed179
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 179 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A - DWC Dosti Nest Ph 3.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: Dosti Enterprises DWC Nest Ph 3 Form 1 Mar26.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: Dosti Enterprises DWC Nest Ph 3 Form 2 Mar26.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: Dosti Enterprises DWC Nest Ph 3 Form 3 Mar26_compressed.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: Dosti Enterprises DWC Nest Ph 3 Form 1 Dec25.pdf | 27 Jan 2026 |
| Withdrawal Update Form 2File: Dosti Enterprises DWC Nest Ph 3 Form 2 Dec25.pdf | 27 Jan 2026 |
| Withdrawal Update Form 3File: Dosti Enterprises DWC Nest Ph 3 Form 3 Dec25compressed.pdf | 27 Jan 2026 |
| Withdrawal Update Form 1File: DWC Dosti Nest PH3 Arch certificate Sep 2025.pdf | 27 Nov 2025 |
| Withdrawal Update Form 2File: DWC Dosti Nest PH3 Engg certificate Sep 2025.pdf | 27 Nov 2025 |
| Withdrawal Update Form 3File: DWC Dosti Nest PH3 CA certificate Sep 2025.pdf | 27 Nov 2025 |
| Form 5 (FY 2024-2025)File: DE DWC Nest Phase 3.pdf | 12 Nov 2025 |
| Withdrawal Update Form 1File: DWC Dosti Nest PH3 Arch certificate Oct 2025.pdf | 5 Nov 2025 |
| Withdrawal Update Form 2File: DWC Dosti Nest PH3 Engg certificate Oct 2025.pdf | 5 Nov 2025 |
| Withdrawal Update Form 3File: DWC Dosti Nest Phase-3 Form3 CA Cert June 2024.pdf | 5 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DWC Nest PH3 June2025.pdf | 27 Jul 2025 |
| Form 1File: DWC Nest PH3 Dove B&C Arch Certificate July2025.pdf | 27 Jul 2025 |
| Form 2File: DWC Nest PH3 Dove B,C Engg Certificate July2025.pdf | 27 Jul 2025 |
| Form 3File: DWC Nest PH3 Dove B,C CA Certificate July2025.pdf | 27 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DWC Nest PH3 Architect Cetificate.pdf | 14 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWC Nest PH3 CA Cetificate.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DWC Nest PH3 Engg Cetificate.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DWC Dosti Nest PH3 Dosti Dove B and C.pdf | 14 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: DWC Nest PH3 Quality Certificate.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DWC Nest PH3 Dosti Dove Wing B C.pdf | 8 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DWC Dosti Nest Phase-3 Arch certificate 30Dec 2024.pdf | 2 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWC Dosti Nest Phase-3 CA certificate 30Dec 2024.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DWC Dosti Nest Phase-3 Engineer certificate 30Dec 2024.pdf | 2 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DWC Nest PH3.pdf | 13 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DWC Nest PH3 Form1 sep24.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWC Nest PH3 Form3 Sep24.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DWC Nest PH3 Form2 Sep24.pdf | 15 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DWC Dosti Nest Phase-3.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 11-3 DWC Nest PH3.pdf | 12 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DWC Dosti Nest Phase-3 Form1 Arch Cert June 2024.pdf | 29 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DWC Dosti Nest Phase-3 Form2 Engg Cert June 2024.pdf | 29 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWC Dosti Nest Phase-3 Form3 CA Cert June 2024.pdf | 29 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Dosti Nest Phase-3 Dove B, C.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DWC Dosti Nest Phase 3-compressed.pdf | 30 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate Dosti nest Phase3.pdf | 27 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DWC Dosti Nest Phase 3 Dove B,C.pdf | 25 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Dosti Nest Phase-3.pdf | 24 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Dosti Dove B C.pdf | 5 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DWC D Nest Phase 3.pdf | 29 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DWC Dosti Nest Phase 3.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DWC Dosti Nest Phase 3.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti West County Phase 3 Dosti Nest.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti West County Dosti Nest Phase 3.pdf | 15 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg -Form-2-DWC-Nest-PH-III.pdf | 13 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Dosti West County Dosti Nest Phase 3.pdf | 11 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Dosti West County Dosti Nest Phase 3.pdf | 23 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate Dosti Nest Phase 3.pdf | 12 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dosti Nest Phase 3.pdf | 17 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Dove B,C.pdf | 7 Jul 2023 |
| Layout approvalFile: 27) Amended Permission Plans date -8-5-23 comp_Part27_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 28) Amended Permission Plans date -8-5-23 comp_Part28_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 29) Amended Permission Plans date -8-5-23 comp_Part29_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 30) Amended Permission Plans date -8-5-23 comp_Part30_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 31) Amended Permission Plans date -8-5-23 comp_Part31_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 32) Amended Permission Plans date -8-5-23 comp_Part32_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 25) Amended Permission Plans date -8-5-23 comp_Part25_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 26) Amended Permission Plans date -8-5-23 comp_Part26_compressed.pdf | 10 May 2023 |
| Building plan approvalFile: Amended Permission Certificate Date - 8-5-23_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 1) Amended Permission Plans date -8-5-23 comp_Part1_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 2) Amended Permission Plans date -8-5-23 comp_Part2_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 3) Amended Permission Plans date -8-5-23 comp_Part3_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 4) Amended Permission Plans date -8-5-23 comp_Part4_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 5) Amended Permission Plans date -8-5-23 comp_Part5_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 6) Amended Permission Plans date -8-5-23 comp_Part6_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 7) Amended Permission Plans date -8-5-23 comp_Part7_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 8) Amended Permission Plans date -8-5-23 comp_Part8_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 9) Amended Permission Plans date -8-5-23 comp_Part9_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 10) Amended Permission Plans date -8-5-23 comp_Part10_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 11) Amended Permission Plans date -8-5-23 comp_Part11_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 12) Amended Permission Plans date -8-5-23 comp_Part12_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 13) Amended Permission Plans date -8-5-23 comp_Part13_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 14) Amended Permission Plans date -8-5-23 comp_Part14_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 15) Amended Permission Plans date -8-5-23 comp_Part15_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 16) Amended Permission Plans date -8-5-23 comp_Part16_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 17) Amended Permission Plans date -8-5-23 comp_Part17_compressed.pdf | 10 May 2023 |
| Layout approvalFile: 18) Amended Permission Plans date -8-5-23 comp_Part18_compressed.pdf | 10 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 14 other registrations, which the RERA portal never shows together
- All 179 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Dosti West County - Dosti Nest - Phase 3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Balkum7,600+ in Thane
RUNWAL EIRENE - PART I
Runwal Developers Private Limited
Dosti West County - Dosti Nest - Phase 1
DOSTI ENTERPRISES
DOSTI WEST COUNTY - DOSTI TULIP
DOSTI ENTERPRISES
Dosti West County - Dosti Nest - Phase 4
DOSTI ENTERPRISES
Vaikunth Cluster 3 Tower 2
PEPL Developers Pvt Ltd
HIGHLAND HAVEN BUILDING 6F MIST-B PHASE 5
SIDDHI KRISH DEVELOPERS
See every Thane project, with the district possession charts
Builder: DOSTI ENTERPRISES
DOSTI ENTERPRISES has 15 registrations on MahaRERA, including DOSTI WEST COUNTY - DOSTI OAK and DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR. Its filings disclose 16 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Dosti West County - Dosti Nest - Phase 3 is delayed beyond 31 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dosti West County - Dosti Nest - Phase 3?
The registered promoter entity is DOSTI ENTERPRISES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dosti West County - Dosti Nest - Phase 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Dosti West County - Dosti Nest - Phase 3?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Dosti West County - Dosti Nest - Phase 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dosti West County - Dosti Nest - Phase 3?
The professionals named in the filing: Architect: NEERJA PURANDARE; Architect: JAY R VORA; Architect: 10 Folds Architect & Consultant; Engineer: Vaibhav Raghunath Kalambate; Engineer: Swapnil Londhe; Engineer: PARAS R VISHWAKARMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dosti West County - Dosti Nest - Phase 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback