Home / Browse projects / Pune, Maharashtra / YASHADA WINDSONG

Registered No litigation declared Others project

YASHADA WINDSONG

By VIVANTA REALTY

RG-MH-86047 · RERA P52100050915 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 completed earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
23 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 97%
3 of 407Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 353 documents Report an error

YASHADA WINDSONG is a Others project by VIVANTA REALTY in Pune, Maharashtra, registered with MahaRERA as P52100050915 on 15 May 2023. Possession is promised by 31 Dec 2026. 404 of the 407 units on this registration are recorded sold or booked, and 23 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameYASHADA WINDSONG
  • TypeOthers
  • Location
    • S NO 104P & 105P NEAR SB PATIL COLLEGE
    • RAVET
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050915
  • ReraGenie IDRG-MH-86047

Builder

  • NameVIVANTA REALTY
  • Entity typePartnership
  • PartnersSURYAKANT TUKARAM JADHAV, VASANT KHANDU KATE, VIVEK GOPAL JOSHI
  • Other registrations9 more →
  • Completed6 of 10
  • Declared earlier projects5 →

Key dates

this monthRegisteredMay 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed353 files

Current status

99%404 of 407 units booked
95.6%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING-BNA161515638194
BUILDING-CNA161511338151
BUILDING-ANA1615481462

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 97%.

BUILDING-B85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING-C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
BUILDING-A83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes95%
Open ParkingYes0%

Parking filed253

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots253
Closed/Covered249
Open Space4
BuildingClosed/CoveredOpen SpaceTotal
BUILDING-B78078
BUILDING-C1150115
BUILDING-A56460

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jun 2025
LandownerVillageDistrict
VIVEK GOPAL JOSHIPashanPune

Approvals and building plan

Sanctioning authorityPCMC
Permissible FSI56353.66
Proposed, not sanctioned42,780 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPLE SAUDAGAR PUNE 411027
Estimated costRs 131.94 cr
Cost incurredRs 126.11 cr
Work done95.58%
BuildingWingEstimatedIncurred
BUILDING-BNARs 48.92 crRs 46.70 cr
BUILDING-CNARs 39.56 crRs 37.88 cr
BUILDING-ANARs 24.51 crRs 23.50 cr
-NARs 18.95 crRs 18.03 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS JAGGANATH YELE
EngineerHIRALAL BHASKAR SONAWANE
Chartered AccountantSHALINI BAHETI
Chartered AccountantMS B A COMPANY
Chartered AccountantPAILWAN & COMPANY
PartnerRole in project
VIVANTA REALTY-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000258943Kailash Pannalal GuptaVIVANTA REALTY08/06/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed353

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 353 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Windsong - Form 1_17042026151628.PDF20 Apr 2026
Withdrawal Update Form 2File: Windsong - Form 2_17042026151706.PDF20 Apr 2026
Withdrawal Update Form 3File: Form 3 march 2026-Windsong_20042026124735.PDF20 Apr 2026
Form 2A (FY 2025-2026)File: Windsong - Form 2A_17042026151747.PDF18 Apr 2026
Form 2A (FY 2023-2024)File: Windsong Form 2A March 2025.PDF26 Mar 2026
Form 2A (FY 2024-2025)File: Windsong Form 2A March 2025.PDF26 Mar 2026
Layout approvalFile: LAYOUT PLAN NO - 01.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 02.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 03.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 04.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 05 A BUILDING.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 06.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 07.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 08.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 09.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 10 B BUILDING.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 11.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 12.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 13.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 14.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 15.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 16.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 17.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 18.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 20.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 21.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 22 C BUILDING.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 23.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 24.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 25.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 26.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 27.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 28.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 29.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 30.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 31.pdf5 Feb 2026
Building plan approvalFile: PLAN NO - 19.pdf5 Feb 2026
Form 1File: Form 1 dec 2024.pdf5 Feb 2026
Form 2File: WINDSONG_FORM 2_DEC 2024.PDF5 Feb 2026
Form 3File: Yashada Windsong Form 3 Dec 2024.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: WINDSONG DEC 2024.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: YASHADA WINDSONG 1.pdf5 Feb 2026
Form 1File: Windsong- Form 1 - March 2025.PDF5 Feb 2026
Form 2File: Windsong- Form 2 - March 2025.PDF5 Feb 2026
Form 3File: Windsong Form 3 revised.pdf5 Feb 2026
Withdrawal Update Form 1File: Form-1-Windsong_DEC 2025.PDF19 Jan 2026
Withdrawal Update Form 2File: Form-2 Yashada Windsong_31-12-2025....PDF19 Jan 2026
Withdrawal Update Form 3File: Windsong Form 3 Dec 2025.pdf19 Jan 2026
Form 5 (FY 2024-2025)File: Windsong Form 5 2024-2025.PDF3 Jan 2026
Withdrawal Update Form 1File: Windsong Form1 Sept 2025.PDF17 Oct 2025
Withdrawal Update Form 1File: Windsong Form1 Sept 2025.PDF17 Oct 2025
Withdrawal Update Form 1File: Windsong Form1 Sept 2025.PDF17 Oct 2025
Withdrawal Update Form 1File: Windsong Form1 Sept 2025.PDF17 Oct 2025
Withdrawal Update Form 1File: Windsong Form1 Sept 2025.PDF17 Oct 2025
Withdrawal Update Form 2File: Windsong Form2 Sept2025 scanned.PDF17 Oct 2025
Withdrawal Update Form 2File: Windsong Form2 Sept2025 scanned.PDF17 Oct 2025
Withdrawal Update Form 2File: Windsong Form2 Sept2025 scanned.PDF17 Oct 2025
Withdrawal Update Form 2File: Windsong Form2 Sept2025 scanned.PDF17 Oct 2025
Withdrawal Update Form 2File: Windsong Form2 Sept2025 scanned.PDF17 Oct 2025
Withdrawal Update Form 3File: Windsong Form3 Sep 2025 scanned.PDF17 Oct 2025
Withdrawal Update Form 3File: Windsong Form3 Sep 2025 scanned.PDF17 Oct 2025
Withdrawal Update Form 3File: Windsong Form3 Sep 2025 scanned.PDF17 Oct 2025
Withdrawal Update Form 3File: Windsong Form3 Sep 2025 scanned.PDF17 Oct 2025
Withdrawal Update Form 3File: Windsong Form3 Sep 2025 scanned.PDF17 Oct 2025
Withdrawal Update Form 1File: Windsong - Form 1_17072025131733.PDF19 Jul 2025
Withdrawal Update Form 2File: Windsong Form 2 updated_19072025114418.PDF19 Jul 2025
Withdrawal Update Form 3File: Windsong form 3_19072025112308.PDF19 Jul 2025
Form 1File: Windsong- Form 1 - March 2025.PDF23 Jun 2025
Form 2File: Windsong- Form 2 - March 2025.PDF23 Jun 2025
Form 3File: Windsong form 3_march 2025 r1.PDF23 Jun 2025
Disclosure of Sold and Booked InventoryFile: YASHADA WINDSONG_001.pdf23 Jun 2025
OthersFile: Windsong- Form 2A - March 2025.PDF23 Jun 2025
Form 123 Jun 2025
Form 2File: WINDSONG_FORM 2_DEC 2024.PDF23 Jun 2025
Form 3File: Yashada Windsong Form 3 Dec 2024.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: WINDSONG DEC 2024.pdf23 Jun 2025
Form 1File: Windsong Form 1 Sep 2024.PDF23 Jun 2025
Form 2File: Windsong Form 2 Sep 2024.PDF23 Jun 2025
Form 3File: Windsong Form 3 Sep 2024.PDF23 Jun 2025
Disclosure of Sold and Booked InventoryFile: WINDSONG_001-Sept 2024-compressed.pdf23 Jun 2025

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
VANTAGE TWENTY ONEP52100022932PK CHOWK PIMPALE SOUDAGER, Pune396Nov 2019OngoingOct 2027Not due yet
VIVANTA LIFE VIPUL PHASE 1LC 3 SECTOR 11 PCNTDA MOSHI28-CompletedOct 2022Dec 2018
VIVANTA LIFE VISHAKHA PHASE 1S NO 19 KAMAL PARK DHANORI PUNE 15104-CompletedApr 2019Nov 2017
VIVANTA LIFE VIBHAPLOT NO 23A SECTOR 9 MOSHI46-CompletedMar 2016Mar 2016

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YASHADA WINDSONG on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAVET13,700+ in Pune

2 kmYASHADA WINDSONGCompleted 103Lapsed / revoked 52Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 256 registered projects within 2 km.

Builder: VIVANTA REALTY

VIVANTA REALTY has 10 registrations on MahaRERA, including VIVANTA LIFE VIPUL PHASE 1 and VIVANTA LIFE VISHAKHA PHASE I. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if YASHADA WINDSONG is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YASHADA WINDSONG?

The registered promoter entity is VIVANTA REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YASHADA WINDSONG?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against YASHADA WINDSONG?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for YASHADA WINDSONG?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YASHADA WINDSONG?

The professionals named in the filing: Architect: VILAS JAGGANATH YELE; Engineer: HIRALAL BHASKAR SONAWANE; Chartered Accountant: SHALINI BAHETI; Chartered Accountant: MS B A COMPANY; Chartered Accountant: PAILWAN & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YASHADA WINDSONG?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YASHADA WINDSONG. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YASHADA WINDSONG to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.