Red flags

  • Litigation declared, 4 cases
  • 2 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
0 of 66Construction stages doneacross 6 buildings; furthest along: Excavation, 0%
700 of 704Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 39 documents Report an error

My Home Sanctuary Phase I is a Residential / Group Housing project by MAMURDI DEVELOPERS LLP in Pune, Maharashtra, registered with MahaRERA as PR1261012502725 on 12 Mar 2026. Possession is promised by 31 Dec 2031. 4 of the 704 units on this registration are recorded sold or booked, and 0 of 66 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameMy Home Sanctuary Phase I
  • TypeResidential / Group Housing
  • Location
    • Survey No. 8 (P)
    • Mamurdi
    • Mamurdi
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1261012502725
  • ReraGenie IDRG-MH-56601

Builder

  • NameMAMURDI DEVELOPERS LLP
  • Entity typeLimited Liability Partnership
  • LLPINABZ-3878
  • GSTIN27AASFC2210L1ZD
  • PartnersRavet Land Developers LLP, Vintu Bhikhabhai Chotaliya
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2026PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Mar 2026
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings6 building records
  • Documents filed39 files

Current status

1%4 of 704 units booked
4.2%Work done, per cost certificate

Figures as on 24 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BldgNA302821216228
B BldgNA30281049113
C BldgNA11829029
D BldgNA31292173220
L Bldg (MHADA)NA30281042106
MLCP - 1 BldgNA81088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 24 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 0%.

A Bldg0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Bldg0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C Bldg0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D Bldg0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
L Bldg (MHADA)0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MLCP - 1 Bldg0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Parking filed1174

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,174
Closed/Covered1,174
BuildingClosed/CoveredTotal
A Bldg368368
B Bldg209209
C Bldg187187
D Bldg332332
L Bldg (MHADA)5252
MLCP - 1 Bldg2626

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area40,000 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Mar 2026
LandownerVillageDistrict
Clover Buildcon Private LimitedPune (M Corp.)Pune
Clover Builders Private LimitedPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI62822.19
Proposed, not sanctioned62,786 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., 1194/8, Ramchandra Sabhamandap, Ghole Road , Shivaji Nagar, Pune.411005
Estimated costRs 215.03 cr
Cost incurredRs 9.00 cr
Work done4.19%
BuildingWingEstimatedIncurred
A BldgNARs 59.51 crRs 2.77 cr
D BldgNARs 59.37 crRs 2.76 cr
B BldgNARs 39.83 crRs 1.85 cr
L Bldg (MHADA)NARs 21.67 crRs 1.01 cr
-NARs 21.50 cr-
C BldgNARs 11.00 crRs 51.15 lakh
MLCP - 1 BldgNARs 2.14 crRs 9.94 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSankalp Designers
EngineerG. A. Bhilare Consultants Pvt. Ltd.
EngineerPlanedge Consultants Pvt Ltd
Chartered Accountantsdjs hjdsj
PartnerRole in project
MAMURDI DEVELOPERS LLP-

Litigation declared4

CaseCourtStatus
1292/2026 old number 92/2023/2026Civil Judge Senior Division PimpriOngoing
1292/2026 /2026Civil Judge Senior Division PimpriOngoing
17362/2025High Court BombayOngoing
CC12604734/2026RERAOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12604734Rajendra Dagadu BhondveMAMURDI DEVELOPERS LLP27/07/2026
CC12605348Sheetal Siddharth ShindeMAMURDI DEVELOPERS LLP21/08/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Mar 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed39

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A_25-26.pdf24 Aug 2026
Withdrawal Update Form 1File: MAMURDI F1.pdf7 Jul 2026
Withdrawal Update Form 2File: MAMURDI Form 2.pdf7 Jul 2026
Withdrawal Update Form 3File: MAMURDI Chartered Accountant Certificate Form 3_compressed (1).pdf7 Jul 2026
Withdrawal Update Form 1File: MAMURDI FORM 1.pdf27 Apr 2026
Withdrawal Update Form 2File: MAMUDRI FORM 2.pdf27 Apr 2026
Withdrawal Update Form 3File: MAMURDI FORM 3_compressed.pdf27 Apr 2026
Declaration and undertaking (Annexure A)File: Annexure A - Order No 50.pdf10 Mar 2026
Layout approvalFile: Plan Pg 1_Layout Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 2_Bldg 1-Basement 1.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 3_Bldg 1-Basement 2.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 4_Bldg 2-Basement 1.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 5_Bldg 2-Basement 2.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 6_Bldg 1-Gr Flr.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 7_Bldg 1-Gr and Mezzanine.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 8_Wing A-Floor Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 9_Wing A-Floor and Terrace.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 10_Wing A-Section Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 11_Wing A-Section Plan 2.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 12_Wing A-Elevation Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 13_Wing B-Gr Mezzanine and 1st Flr.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 14_Wing B-Flr Plans.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 15_Wing B-Section Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 16_Wing B-Elevation Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 17_Wing C-Floor Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 18_Wing C-8 Flr and Terrace Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 19_Wing C-Section and Elevation Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 20_Wing D-Gr Mezzanine and 1st Flr.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 21_Wing D-Floor Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 22_Wing D-Section Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 23_Wing D-Section Plan 2.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 24_Wing D-Elevation Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 25_Wing L-Floor Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 26_Wing L-Section Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 27_Wing L-Elevation Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 28_MLCP 1-Gr 1st 2nd parking.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 29_MLCP 1-3rd and 4th Flr.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 30_MLCP 1-Section and Elevation Plan.pdf10 Mar 2026
Building plan approvalFile: Plan Pg 31_Wing K_Basement Parking Plan.pdf10 Mar 2026

How this compares with Pune

1%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep My Home Sanctuary Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mamurdi13,700+ in Pune

2 kmMy Home Sanctuary Phase Completed 42Lapsed / revoked 32Other 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 158 registered projects within 2 km.

Builder: MAMURDI DEVELOPERS LLP

MAMURDI DEVELOPERS LLP has 2 registrations on MahaRERA, including My Home Sanctuary Phase I and My Home Sanctuary Phase 2. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if My Home Sanctuary Phase I is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of My Home Sanctuary Phase I?

The registered promoter entity is MAMURDI DEVELOPERS LLP, a limited liability partnership as per the filing. Its LLPIN ABZ-3878 and GSTIN 27AASFC2210L1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in My Home Sanctuary Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against My Home Sanctuary Phase I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for My Home Sanctuary Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at My Home Sanctuary Phase I?

The professionals named in the filing: Architect: Sankalp Designers; Engineer: G. A. Bhilare Consultants Pvt. Ltd.; Engineer: Planedge Consultants Pvt Ltd; Chartered Accountant: sdjs hjdsj. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in My Home Sanctuary Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About My Home Sanctuary Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save My Home Sanctuary Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.