Home / Browse projects / Pune, Maharashtra / VANTAGE TWENTY ONE
VANTAGE TWENTY ONE
RG-MH-14516 · RERA P52100022932 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 3 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VANTAGE TWENTY ONE is a Others project by VIVANTA REALTY in Pune, Maharashtra, registered with MahaRERA as P52100022932 on 5 Nov 2019. Possession is promised by 1 Oct 2027. 371 of the 379 units on this registration are recorded sold or booked, and 42 of 44 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameVANTAGE TWENTY ONE
- TypeOthers
- Location
- BRT ROAD
- PK CHOWK PIMPALE SOUDAGER
- Pimpale Saudagar
- Haveli
- Pune
- 411027
- Pincode411027
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100022932
- ReraGenie IDRG-MH-14516
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Nov 2019
- Promised completion1 Oct 2027
- Revised completionNone
- Buildings4 building records
- Documents filed374 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING - A RESIDENTIAL | NA | 23 | 20 | 102 | 0 | 102 |
| BUILDING - B RESIDENTIAL | NA | 23 | 20 | 59 | 0 | 59 |
| BUILDING - C RESIDENTIAL | NA | 22 | 20 | 74 | 0 | 74 |
| BUILDING - D RESIDENTIAL AND COMMERCIAL | NA | 15 | 14 | 26 | 118 | 144 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
42 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 0%.
BUILDING - A RESIDENTIAL100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING - B RESIDENTIAL100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING - C RESIDENTIAL82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING - D RESIDENTIAL AND COMMERCIAL100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed283
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING - A RESIDENTIAL | 116 | 116 |
| BUILDING - B RESIDENTIAL | 60 | 60 |
| BUILDING - C RESIDENTIAL | 78 | 78 |
| BUILDING - D RESIDENTIAL AND COMMERCIAL | 29 | 29 |
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VIVEK GOPAL JOSHI | Baner | Pune |
| GANESH NAMDEV ZINZURDE | Pimpale Saudagar | Pune |
| MAHENDRA BALKRISHNA ZINZURDE | Pimpale Saudagar | Pune |
| BHARAT SHITARAM KATE | Pimpale Saudagar | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING - A RESIDENTIAL | NA | Rs 44.54 cr | Rs 44.53 cr |
| BUILDING - D RESIDENTIAL AND COMMERCIAL | NA | Rs 38.42 cr | Rs 37.77 cr |
| BUILDING - B RESIDENTIAL | NA | Rs 30.14 cr | Rs 30.13 cr |
| BUILDING - C RESIDENTIAL | NA | Rs 29.58 cr | Rs 29.57 cr |
| - | NA | Rs 19.77 cr | Rs 19.67 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VILAS J YELE |
| Engineer | Hiralal bhaskar Sonawane |
| Chartered Accountant | S BAHETI & ASSOCIATES |
| Chartered Accountant | MS B A & COMPANY |
| Chartered Accountant | PAILWAN & COMPANY |
| Partner | Role in project |
|---|---|
| VIVANTA REALTY | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502978 | yusuf qamri | VIVANTA REALTY | 23/08/2025 |
| CC12503576 | Kausshal Tollasariya | VIVANTA REALTY | 08/10/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Oct 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 24 Oct 2024
Documents filed374
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 374 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Vantage 21 - Form 1_17042026152423.PDF | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2-Engineer Certificate-Vantage Twenty One_31-03-2026..PDF | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 march 2026-vantage_20042026124609.PDF | 20 Apr 2026 |
| Form 2A (FY 2025-2026)File: Vantage 21 -Form 2A_17042026152356.PDF | 18 Apr 2026 |
| Withdrawal Update Form 1File: VANTAGE FORM 1 31-12-2025.PDF | 19 Jan 2026 |
| Withdrawal Update Form 2File: Form-2-Vantage 21 - DEC 2025.PDF | 19 Jan 2026 |
| Withdrawal Update Form 3File: VANTAGE FORM 3 UP TO 31 dec 2025.pdf | 19 Jan 2026 |
| Form 5 (FY 2024-2025)File: Vantage Twenty One Form 5 2024-2025.PDF | 3 Jan 2026 |
| Withdrawal Update Form 1File: Vanatge form1 Sept2025.PDF | 17 Oct 2025 |
| Withdrawal Update Form 2File: Vantage Form2 Sept2025 scanned.PDF | 17 Oct 2025 |
| Withdrawal Update Form 3File: Vantage Form3 Sep 2025 scanned.PDF | 17 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: VANTAGE 21 002.pdf | 24 Jun 2025 |
| Form 1File: Vantage 21 - form 1 - March 2025.PDF | 24 Jun 2025 |
| Form 2File: Vantage 21 - form 2 - March 2025.PDF | 24 Jun 2025 |
| Form 3File: Vantage 21- Form 3- March2025.PDF | 24 Jun 2025 |
| Building plan approvalFile: LAYOUT PLAN NO - 01.pdf | 19 Apr 2025 |
| Building plan approvalFile: LAYOUT PLAN NO - 01.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 02.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 03.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 04.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 05.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 06.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 07.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 08.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 09.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 10.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 11.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 12.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 13.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 14.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 14.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 15.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 16.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 17.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 18.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 19.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 20.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 21.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 22.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 23.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 24.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 25.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 26.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 27.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 28.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 29.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 30.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 31.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 32.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 33.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 34.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 35.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 36.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 37.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 39.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 40.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 41.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 42_compressed.pdf | 19 Apr 2025 |
| Building plan approvalFile: PLAN NO - 38_compressed.pdf | 19 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - VANTAGE 21 - 2024_compressed.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 20.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 22.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 23.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 24.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 25.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 26.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 27.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 28.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 29.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 30.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 31.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 32.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 33.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 34.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 35.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 36.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 37.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 39.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 40.pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN NO - 41.pdf | 19 Apr 2025 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VIVANTA LIFE VIPUL PHASE 1 | LC 3 SECTOR 11 PCNTDA MOSHI | 28 | Completed | Oct 2022 | Dec 2018 |
| VIVANTA LIFE VISHAKHA PHASE 1 | S NO 19 KAMAL PARK DHANORI PUNE 15 | 104 | Completed | Apr 2019 | Nov 2017 |
| VIVANTA LIFE VIBHA | PLOT NO 23A SECTOR9 SECTOR9 MOSHI PUNE | 46 | Completed | Mar 2016 | Mar 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 374 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VANTAGE TWENTY ONE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PK CHOWK PIMPALE SOUDAGER13,700+ in Pune
Filed coordinates, straight-line distance. 294 registered projects within 2 km.
SHAKTI GARDENS
Grandwell Properties and Leasing Private L
24K OPULA
KOLTE-PATIL DEVELOPERS LIMITED
Sukhwani Minerva
Sukhwani Ramchandani LLP
MIDORI TOWER PHASE 4
VIKRAM DEVELOPERS AND PROMOTERS
Sai Aura
WJV LANDMARKS LLP
VISION 7 - PHASE I
SHREE VISION
Builder: VIVANTA REALTY
VIVANTA REALTY has 10 registrations on MahaRERA, including VIVANTA LIFE VIPUL PHASE 1 and VIVANTA LIFE VISHAKHA PHASE I. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VANTAGE TWENTY ONE is delayed beyond 1 Oct 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VANTAGE TWENTY ONE?
The registered promoter entity is VIVANTA REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VANTAGE TWENTY ONE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VANTAGE TWENTY ONE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VANTAGE TWENTY ONE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VANTAGE TWENTY ONE?
The professionals named in the filing: Architect: VILAS J YELE; Engineer: Hiralal bhaskar Sonawane; Chartered Accountant: S BAHETI & ASSOCIATES; Chartered Accountant: MS B A & COMPANY; Chartered Accountant: PAILWAN & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VANTAGE TWENTY ONE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.